Modification Completion CertificateMCC Ref.
: TKS/NOC-MC/8130/2015/2315
Lessee
: Bericap Middle East FZE
Location
: Economic Zones World - JAFZ - South –S10105
Work Description
: Office Fitout
Building Usage
: INDUSTRIAL
Modification NOC Ref.
: TKS/NOC-MP/5874/2014/2930 issued on 11-Sep-14
Contractor
: Tecmark Contracting L.L.C
Date of Inspection
: 27-Jul-15
Notes:
a. The above mentioned project been completed as per Trakhees Building Regulations and Design Guidelines.
b. Trakhees has no objection in Dubai Electrical & Water Authority [DEWA] providing service connections to the above location.
c. The lessee shall undertake to maintain the premises regularly both internally and externally within plot limits.
d. No modifications, additions and change of Premises usage shall be carried out without the written approval of Trakhees.
e. Trakhees assumed no responsibility or liabilities what-so-ever with regard to safety of personnel or property of the lesser by the issuance of this Certificate and attention is drawn to all Trakhees regulations regarding ongoing responsibilities.
f. The lessee shall comply to comments issued with approval by Trakhees Environment, Health and Safety Division.
g. Trakhees Civil Engineering Division has No Objection in Trakhees Finance refunding the Security Deposit.
h. This Completion Certificate is issued upon the completion of the above project in accordance to Trakhees procedures, without liability or responsibility whatsoever on Trakhees towards rights of the third parties.
Date: 29-Jul-15 Manager - Building Completion Section
Print: \\jagrnet02\TRK_DMS1\MPS\WFDocuments\PRD\8130\NOC
Modification Completion CertificateMCC Ref.
: TKS/NOC-MC/8357/2015/2170
Lessee
: Bericap Middle East FZE
Location
: Economic Zones World - JAFZ - South – S10105
Work Description
: Compound wall, wall Cladding and car parking shed
Building Usage
: INDUSTRIAL
Modification NOC Ref.
: TKS/NOC-MP/5800/2014/2937 issued on 15-Sep-14
Consultant
: None
Contractor
: Tecmark Contracting L.L.C
Date of Inspection
: 11-Jun-15
Notes:
a. The above mentioned project been completed as per Trakhees Building Regulations and Design Guidelines.
b. Trakhees has no objection in Dubai Electrical & Water Authority [DEWA] providing service connections to the above location.
c. The lessee shall undertake to maintain the premises regularly both internally and externally within plot limits.
d. No modifications, additions and change of Premises usage shall be carried out without the written approval of Trakhees.
e. Trakhees assumed no responsibility or liabilities what-so-ever with regard to safety of personnel or property of the lesser by the issuance of this Certificate and attention is drawn to all Trakhees regulations regarding ongoing responsibilities.
f. The lessee shall comply to comments issued with approval by Trakhees Environment, Health and Safety Division.
g. Trakhees Civil Engineering Division has No Objection in Trakhees Finance refunding the Security Deposit.
h. This Completion Certificate is issued upon the completion of the above project in accordance to Trakhees procedures, without liability or responsibility whatsoever on Trakhees towards rights of the third parties, refer to revised NOC REF. MP - RV/8357.
Date: 14-Jun-15 Manager - Building Completion Section
Print: \\jagrnet02\TRK_DMS1\MPS\WFDocuments\PRD\8357\NOC
Modification Completion CertificateMCC Ref.
: TKS/NOC-MC/5304/2014/1295
Lessee
: Valbruna Gulf FZE
Location
: Economic Zones World - JAFZ - South - Plot No.: S20209
Work Description
: Office Partitions
Usage
: INDUSTRIAL
Modification NOC Ref.
: TKS/NOC-MP/4843/2014/2532 issued on 05-Jun-14
Consultant
: None
Contractor
: Tecmark Contracting L.L.C
Date of Inspection
: 14-Jul-14
Notes:
a. Trakhees is satisfied that the Modifications mentioned above are fit for occupation as intended.
b. Trakhees has no objection in Dubai Electrical & Water Authority [DEWA] providing service connections to the above location.
c. The lessee shall undertake to maintain the premises regularly both internally and externally within plot limits.
d. No modifications, additions and change of Premises usage shall be carried out without the written approval of Trakhees.
e. Trakhees assumed no responsibility or liabilities what-so-ever with regard to safety of personnel or property of the lesser by the issuance of this Certificate and attention is drawn to all Trakhees regulations regarding ongoing responsibilities.
f. The lessee shall comply to comments issued with approval by Trakhees Environment, Health and Safety Division.
g. Trakhees Civil Engineering Division has No Objection in Trakhees Finance refunding the Security Deposit.
h. This Completion Certificate is issued upon the completion of the above project in accordance to Trakhees procedures, without liability or responsibility whatsoever on Trakhees towards rights of the third parties.
Date: 17-Jul-14 Manager - Building Completion Section
Print: \\jcivnt01\Trakhees Modification Submission\WFDocuments\PRD
MODIFICATION PERMIT Modification Works - INDUSTRIAL
REF NO : TKS/NOC-MP/9266/2015/4612 Issue Date : 12-Aug-15
Applicant Information Client Name SAF Holland Middle East FZE Telephone No. 04-8836262 Trakhees ID C-0023-039683
Email [email protected] Trade License No. 128346
Contractor Name Tecmark Contracting L.L.C Telephone No. 04-3384612 Trakhees ID C-0016-050462 Email [email protected] Trade License No. 685927
Consultant Name None Telephone No. - Trakhees ID - Email Trade License No. -
Project Information Business Unit Economic Zones World Location JAFZ - South Plot No. S20105 Building No. Modified Area LS Unit No. Work Description NOC for Installation of Jib Crane (500kg cap.) Special Comments Refer to approved drawings and special comments (if any) in attached sheets for further compliance.
General Conditions This NOC should be printed and posted on the site entrance for the reference of Trakhees Inspection Engineers. All approved modification works shall be isolated from General Public and Operation Areas & executed within the premises unit. Modification Permit and Approved Drawings shall be available on site during the modification activities. The Contractor/Consultant and his agents shall remain entirely responsible for all errors in the design and execution of the project. No storage or utilization of adjacent unit or area is permitted unless clearance obtained from concerned parties. Environment, Health and Safety (EHS) aspects are to be met during the Modification Works as per Trakhees Guidelines &
Regulations. Consultant/Contractor shall inform Trakhees (CED and EHS) of any accidents or incident that occurs during modification works
period. Application for Certificate of Conformity (COC) for Modification must be completely filled and submitted at Trakhees-EHS by the
main contractor or consultant for all fit-out/renovation works as per the Trakhees-EHS Procedure. COC should be obtained prior to commencement of construction activity.
Revalidation of Permit is required if modification works are not completed within six (6) months from the date of issuance of Modification permit.
Operation/Occupation of the modified area is not permitted unless Modification Completion Certificate (MCC) is obtained from Trakhees.
Refundable Deposit shall be collected within three (3) months after issuance of Modification Completion Certificate or else it will be forfeited. Trakhees has the right to forfeit the refundable deposit if the appointed contractor fails to maintain the cleanliness of the site and surroundings.
Approved By Modification Manager Trakhees Civil Engineering Division
Print: \\jagrnet02\TRK_DMS1\MPS\WFDocuments\PRD\9266\NOC
REF NO : TKS/NOC-MP/9266/2015/4612 Date : 12-Aug-15
Special Comments
TKS CED Comments 1. All existing services shall be protected. Review is for fit out works and excludes any modification to services. 2. Refer to attached circular on "Mandatory Site Inspections" requirement & the "Request for Inspection" form for
your compliance. 3. All debris shall be carted away as per authority requirements. 4. It is the responsibility of the Client not to exceed the design loading of 500kgs. 5. Concrete Durability shall comply to BS 8500-1:2006. TKS EHS Comments 1. The contractor/consultant has to obtain COC-MW from EHS Construction department before start of the work
(Refer the procedure Ref. No. EHS-CSP-04 Selection Matrix CSF-04c for obtaining the COC-MW). 2. The proposed project has been reviewed based on the submitted floor plan drawings. Further comments if any
related to EHS aspects shall be assessed during completion inspection of the proposed project.
TKS – Trakhees | CED – Civil Engineering Division| EHS – Environment Health & Safety Division
MODIFICATION PERMIT Modification Works - INDUSTRIAL
REF NO : TKS/NOC-MP/8946/2015/4506 Issue Date : 12-Jul-15
Applicant Information Client Name Blue Deebaj FZCO Telephone No. 04-2340481 Trakhees ID C-X-027719 Email [email protected] Trade License No. 111254
Contractor Name Tecmark Contracting L.L.C Telephone No. 04-3384612 Trakhees ID C-0016-050462 Email [email protected] Trade License No. 685927
Consultant Name None Telephone No. - Trakhees ID - Email Trade License No. -
Project Information Business Unit Economic Zones World Location JAFZ - South Plot No. S40804 Building No. Modified Area LS Unit No. Work Description 4 Nos covered car parking as per drawings Special Comments Refer to approved drawings and special comments (if any) in attached sheets for further compliance.
General Conditions This NOC should be printed and posted on the site entrance for the reference of Trakhees Inspection Engineers. All approved modification works shall be isolated from General Public and Operation Areas & executed within the premises unit. Modification Permit and Approved Drawings shall be available on site during the modification activities. The Contractor/Consultant and his agents shall remain entirely responsible for all errors in the design and execution of the project. No storage or utilization of adjacent unit or area is permitted unless clearance obtained from concerned parties. Environment, Health and Safety (EHS) aspects are to be met during the Modification Works as per Trakhees Guidelines &
Regulations. Consultant/Contractor shall inform Trakhees (CED and EHS) of any accidents or incident that occurs during modification works
period. Application for Certificate of Conformity (COC) for Modification must be completely filled and submitted at Trakhees-EHS by the
main contractor or consultant for all fit-out/renovation works as per the Trakhees-EHS Procedure. COC should be obtained prior to commencement of construction activity.
Revalidation of Permit is required if modification works are not completed within six (6) months from the date of issuance of Modification permit.
Operation/Occupation of the modified area is not permitted unless Modification Completion Certificate (MCC) is obtained from Trakhees.
Refundable Deposit shall be collected within three (3) months after issuance of Modification Completion Certificate or else it will be forfeited. Trakhees has the right to forfeit the refundable deposit if the appointed contractor fails to maintain the cleanliness of the site and surroundings.
Approved By P.P Modification Manager Trakhees Civil Engineering Division
Print: \\jagrnet02\TRK_DMS1\MPS\WFDocuments\PRD\8946\NOC
REF NO : TKS/NOC-MP/8946/2015/4506 Date : 12-Jul-15
Special Comments
TKS CED Comments 1. Review is for the 4 Nos covered car parking as per drawings and excludes any modification to services. 2. Existing building foundation shall be protected during the modification works. 3. Refer to attached circular on mandatory inspection requirement and the Request for inspection form for your
compliance. 4. Demarcation Certificate shall be obtained prior to commencing any works on site. 5. Concrete durability shall comply with BS8500-1:2006 6. All works should comply with Trakhees regulations. TKS EHS Comments 1. The contractor/consultant has to obtain COC-MW from EHS Construction department before start of the work
(Refer the procedure Ref. No. EHS-CSP-04 Selection Matrix CSF-04c for obtaining the COC-MW). 2. The proposed project has been reviewed based on the submitted floor plan drawings. Further comments if any
related to EHS aspects shall be assessed during completion inspection of the proposed project.