Prime Engineered Components Presentation

17
“First in Quality”-Foremost in Production. “Manufacturing quality parts since 1967” ISO/TS 16949:2009 TS 512237

Transcript of Prime Engineered Components Presentation

Page 1: Prime Engineered Components Presentation

“First in Quality”-Foremost in Production.

“Manufacturing quality parts since 1967”

ISO/TS 16949:2009TS 512237

Page 2: Prime Engineered Components Presentation

About Us Prime Engineered Components

Inc. commenced operations in 1967 with the goal of being a high quality screw machine house. The operation has been tailored throughout the years toward customer satisfaction through continuous improvements. Prime is committed to maintaining an independent, verified quality system and being the leader within our industry.

Page 3: Prime Engineered Components Presentation

Mission “Prime Engineered Components, Inc.

believes that our continued success depends upon our ability to recognize and meet our customer needs through, innovative thinking, the continual improvement process, understanding our quality objectives, and excellent service.”

Page 4: Prime Engineered Components Presentation

Average length of employment is over 12 years.

ISO/TS 16949:2009 Training Advanced Product Quality Planning

(APQP) HAZCOM Training & Safety Committees Continuous Improvement Teams Process and Quality System Audit Teams

EMPLOYEES

Page 5: Prime Engineered Components Presentation

• Two State of the art facilities• 65,000 square feet of manufacturing

space• 100 Multi-Spindle Screw Machines• 20 CNC Machines• Plant wide overhead lift system• Automatic Scrap Processing• Cutting Fluid Recycling System• Quality control and calibration lab• Automatic part degreasing• Warehousing Capabilities

FACILITIES

Page 6: Prime Engineered Components Presentation

STATE OF THE ART MACHINES

• DOOSAN Vertical Milling machines with palletized loading capabilities

• Tsugami CNC 32mm Swiss with bar loading.

Page 7: Prime Engineered Components Presentation

STATE OF THE ART EQUIPMENT

• Davenport Model B 5-spindle automatic screw machines equipped with P.Cucchi automatic bar loader. Capacity 1/16” to 7/8”

• New Britain Model 52, 61 and Model 62, 6-spindle automatic screw machines. Capacity 1/2” to 2-1/4”

Page 8: Prime Engineered Components Presentation

PROCESS TECHNOLOGY

From the latest technology utilizing specialized attachments, secondary operations are reduced or eliminated. Our process offers an extra margin of on time delivery and competitive pricing.

We perform the following steps in the primary operation:

Keyway slotting Saw off attachment Deep drilling

Cross drilling Bent shank tapping Milling

Cross drilling & tap Knurling Radius cutoff

Cross drilling & Screw slotting Broaching

Counter sink Straddle mill Lettering

Recessing Back slotting Back de-burring

Deep back drilling ID & OD threading Roll threading

Page 9: Prime Engineered Components Presentation

The Secondary Specialists

• Why buy the parts when you can buy the entire assembly? • Reduce valuable secondary labor and floor space.• Controlled process of parts from start to finish.• We also offer heat treating, plating, grinding and specialized

packaging.

Page 10: Prime Engineered Components Presentation

Commitment To Maintenance“If our systems do not keep pace with technology we change

it!”

• In House Machine Rebuilding Program and Boring

• Preventative Maintenance Program

• In House Tooling Design and Tooling Maintenance

• Computerized Tool Room Monitors Manufacturing Controls

Page 12: Prime Engineered Components Presentation

Quality Policy“Prime Engineered Components will improve the quality of our products and services by the refinement of our processes, deliver on time and seek continuous improvement to satisfy the requirements of our customers.”

Page 13: Prime Engineered Components Presentation

Quality“CONSISTENT QUALITY, EACH PART, EVERY PART”

“Delivering perfect parts everyday demands a disciplined system with highly skilled personnel using the most advanced technology. At PRIME, we produce the most sophisticated turned parts in the world, the result of this approach is world-class PPM levels, delivered on-time each and every shipment.”

ISO/TS 16949:2009

TS 512237

Page 14: Prime Engineered Components Presentation

EFFICIENT MATERIAL EFFICIENT MATERIAL HANDLINGHANDLING

“At Prime, on time delivery is a must.”

Prime’s innovative computer systems flow track each part in it’s travels from prototype through delivery.

Prime’s computerized distribution warehouse assures uninterrupted job flow for JIT, Kanban and all lean manufacturing shipment requirements.

Page 15: Prime Engineered Components Presentation

Differentiators

• Engineering support and design capability

• Mill direct raw materials• In house rebuilding• Chip and cutting fluid recycling• 0% hazmat-waste producer• Assembly and secondary

capabilities• Automated Parts Washing

system to include vapor degrees.

Page 16: Prime Engineered Components Presentation

NEWS

• Even during a down turn in 2009 Prime made a decision to keep investing in new equipment by adding to the CNC fleet.

• In 2011 brought on more inspection equipment. Prime is now in full use of its new Oasis inspection system.

Page 17: Prime Engineered Components Presentation

Continued Success“With Prime’s dedication and commitment, every customer will be treated with the utmost respect. You will receive the finest customer service and quality parts.”