    WBS Code WBS Name

    01 .City Center Office Building Addition

    01.01.D&E Design and Engineering

    01.01.Found Foundation

    01.01.Structur Structure

    01.01.MechaniMechanical/Electrical Systems

    01.01.Mecha Elevator01.01.Mecha HVAC

    01.01.Mecha Plumbing and Electrical

    01.01.Ex-FinishExterior Finishes

    01.01.Ex-FinisBrick

    01.01.Ex-FinisRoof

    01.01.Ex-FinisDoors and Windows

    01.01.Int-Finis Interior Finishes

    01.01.Int-Fini Plumbing and Lighting Fixtures

    01.01.Int-Fini Floor and Carpeting

    01.01.Int-Fini Carpentry

    01.01.Int-Fini Paint

    Activity ID Activity Name Predecessors

    Relation

    ship

    Type Lag

    Total

    CITY CENTER EXTENTION PROJECT

    City Center Office Building Extention

    Design and Engineering

    EC1000 Design Building Addition EC1010 FS 0

    EC1050 Assemble Technical Data for Heat Pump EC1030 FS 0

    EC1160 Review Technical Data on Heat Pumps EC1050 FS 0

    EC1030 Review and Approve Designs EC1000 FS 0

    EC1010 Start Office Building Addition Project FS 0

    Foundation

    EC1090 Begin Building Construction EC1030 FS

    EC1100 Site Preparation EC1090 SS 0

    EC1230 Excavation EC1100 FS 0

    EC1320 Install Underground Water Lines EC1230 FS 0

    EC1330 Install Underground Electric Conduit EC1230 FS 0EC1340 Form/Pour Concrete Footings EC1320, EC1330 FS 0

    EC1350 Concrete Foundation Walls EC1340 FS 0

    EC1360 Form and Pour Slab EC1350 FS 0

    EC1370 Backfill and Compact Walls EC1360 FS 0

    EC1380 Foundation Phase Complete EC1370 FS 0

    Structure

    EC1390 Erect Structural Frame EC1370 FS 0

    EC1420 Floor Decking EC1390 FS 0

  • 7/29/2019 Primavera Workshop

    2/14

    EC1430 Concrete First Floor EC1420 FS 0

    EC1540 Structure Complete

    EC1460, EC1470,

    EC1480 FS 0

    EC1480 Concrete Second Floor EC1430 FS 0

    EC1460 Erect Stairwell and Elevator Walls EC1430 FS 0

    EC1470 Concrete Basement Slab EC1430 FS 0EC1410 Begin Structural Phase EC1390 FS 0

    Mechanical/Electrical Systems

    EC1690 Rough In Complete EC1520, EC1680 FS 0

    EC1490 Rough-In Phase Begins EC1440 FS 0

    Elevator

    EC1710 Install Elevator Cab and Finishes EC1620, EC1690 FS 0

    EC1520 Install Elevator Rails and Equipment EC1460, EC1490 FS 0

    HVAC

    EC1190 Prepare and Solicit Bids for Heat Pump EC1160 FS 0

    EC1240 Review Bids for Heat Pump EC1190 FS 0

    EC1270 Award Contract for Heat Pump EC1240 FS 0

    EC1290 Fabricate and Deliver Heat Pump and Control EC1270 FS 0

    EC1650 Set Heat Pump

    EC1290, EC1620,

    EC1630 FS 0

    EC1680 Startup and Test HVAC

    EC1660, EC1670,

    EC1490 FS 0

    EC1830 Test and Balance HVAC Equipment EC1820 FS 0

    EC1670 Relocate HVAC Chiller EC1650 FS 0

    EC1770 Install AC Grills and Registers EC1740 FS 0EC1630 Insulate Ducts EC1620, EC1500 FS 0

    EC1500 Install HVAC Ducts EC1440 FS 0

    Plumbing and Electrical

    EC1660 Connect Equipment EC1650, EC1640 FS 0

    EC1640 Install Wiring and Cable EC1620, EC1510 FS 0

    EC1440 Set Mechanical and Electrical Equipment EC1430 SS 7

    EC1510 Rough-In Plumbing/Piping EC1500 SS 4

    Exterior Finishes

    EC1620 Building Enclosed EC1600, EC1580 FS 0

    EC1590 Close-In Phase Begins EC1550 FS 0

    Brick

    EC1550 Brick Exterior Walls EC1280, EC1540 FS 0

    EC1180 Prepare and Solicit Bids for Brick Exterior EC1070 FS 0

    EC1220 Review Bids for Brick EC1180 FS 0

    EC1260 Award Contract for Brick EC1220 FS 0

  • 7/29/2019 Primavera Workshop

    3/14

    EC1040 Assemble Brick Samples EC1030 FS 0

    EC1070 Review and Approve Brick Samples EC1040 FS 0

    EC1280 Deliver Brick EC1260 FS 0

    Roof

    EC1600 Insulation and Built-up Roofing EC1550, EC1580 FS,FF 0

    Doors and Windows

    EC1560 Install Door and Window Frames EC1550 SS 5EC1580 Install Exterior Doors and Windows EC1560 FS 0

    Interior Finishes

    EC1700 Drywall in Offices EC1620, EC1690 FS 0

    EC1820 Touch-up and Clean-up

    EC1800, EC1810,

    EC1710, EC1720 FS 0

    EC1840 Finishes Complete EC1830 FS 0

    EC1850 Punch List EC1840 FS 0

    EC1860 Building Addition Complete EC1850 FS 0

    Plumbing and Lighting FixturesEC1810 Install Plumbing Fixtures EC1790 FS 0

    EC1760 Install Lighting Fixtures EC1740 SS 0

    Floor and Carpeting

    EC1790 Install Floor and Carpeting

    EC1310, EC1740,

    EC1760, EC1770 FS 0

    EC1170 Prepare and Solicit Bids for Flooring EC1080 FS 0

    EC1250 Review Bids for Flooring EC1170 FS 0

    EC1300 Award Contract for Flooring EC1250 FS 0

    EC1060 Assemble and Submit Flooring Samples EC1030 FS 0

    EC1080 Review and Approve Flooring EC1060 FS 0

    EC1310 Fabricate and Deliver Flooring EC1300 FS 0

    Carpentry

    EC1740 Install Ceiling Grid EC1700 FS 0

    EC1800 Finish Carpentry and Millwork EC1790 FS 0

    Paint

    EC1720 Paint Building Interior EC1700 SS 7

  • 7/29/2019 Primavera Workshop

    4/14

  • 7/29/2019 Primavera Workshop

    5/14

    Successors

    Relationship

    Type Lag Free Float Total Float

    0 0

    0 0

    0 0

    0 0

    EC1030 0 0 0

    EC1160 0 0 0

    EC1190 0 0 0

    EC1040, EC1050,

    EC1060, EC1090 0 0 0

    EC1000 0 0 0

    0 470

    EC1100 SS 0 0 130

    EC1230 FS 0 0 130

    EC1320, EC1330 FS 0 0 130

    EC1340 FS 0 0 130

    EC1340 FS 0 0 130EC1350 FS 0 0 130

    EC1360 FS 0 0 130

    EC1370 FS 0 0 130

    EC1380, EC1390 FS 0 0 130

    470 470

    0 316

    EC1410, EC1420 FS 0 0 130

    EC1430 FS 0 0 130

  • 7/29/2019 Primavera Workshop

    6/14

    EC1460, EC1470,

    EC1440, EC1480 SS,FS,FS,FS 7,0,0,0 0 130

    EC1550 FS 0 0 130

    EC1540 FS 0 0 130

    EC1540, EC1520 FS 0 0 142

    EC1540 FS 0 12 142FS 0 422 422

    0 0

    EC1700, EC1710 FS 0 0 0

    EC1680, EC1520 FS 0 17 237

    0 91

    EC1820 FS 0 91 91

    EC1690 FS 0 220 220

    0 0

    EC1240 FS 0 0 0

    EC1270 FS 0 0 0

    EC1290 FS 0 0 0

    EC1650 FS 0 0 0

    EC1660, EC1670 FS 0 0 0

    EC1690 FS 0 0 0

    EC1840 FS 0 0 0

    EC1680 FS 0 0 0

    EC1790 FS 0 23 23EC1650 FS 0 143 143

    EC1630, EC1510 SS,FS 4,0 0 189

    0 6

    EC1680 FS 0 6 6

    EC1660 FS 0 124 130

    EC1490, EC1500 FS 0 0 189

    EC1640 SS 5 61 191

    0 275

    EC1630, EC1650,

    EC1640, EC1700,

    EC1710 FS 0 0 130

    FS 0 299 299

    0 130

    EC1590, EC1560,

    EC1600 FS 0 0 130

    EC1220 FS 0 0 363

    EC1260 FS 0 0 363

    EC1280 FS 0 0 363

  • 7/29/2019 Primavera Workshop

    7/14

    EC1070 FS 0 0 363

    EC1180 FS 0 0 363

    EC1550 FS 0 233 363

    0 130

    EC1620 FS 0 0 130

    0 159

    EC1580 FS 0 0 159EC1600, EC1620 FF,FS 0 29 159

    0 0

    EC1740, EC1720 SS,FS 7,0 0 0

    EC1830 FS 0 0 0

    EC1850 FS 0 0 0

    EC1860 FS 0 0 0

    0 0

    0 7EC1820 FS 0 7 7

    EC1790 FS 0 21 21

    0 0

    EC1800, EC1810 FS 0 0 0

    EC1250 FS 0 0 231

    EC1300 FS 0 0 231

    EC1310 FS 0 0 231

    EC1080 FS 0 0 231

    EC1170 FS 0 0 231

    EC1790 FS 0 231 231

    0 0

    EC1760, EC1770,

    EC1790 SS,SS,FS 8,8,0 0 0

    EC1820 FS 0 0 0

    0 77

    EC1820 FS 0 77 77

  • 7/29/2019 Primavera Workshop

    8/14

  • 7/29/2019 Primavera Workshop

    9/14

    Activity ID Activity Name Original Duration

    Total 691

    CITY CENTER EXTENTION PROJECT 691

    .City Center Office Building Extention 691

    Design and Engineering 111

    EC1000 Design Building Addition 55EC1050 Assemble Technical Data for Heat Pump 7

    EC1160 Review Technical Data on Heat Pumps 27

    EC1030 Review and Approve Designs 22

    EC1010 Start Office Building Addition Project 0

    Foundation 144

    EC1090 Begin Building Construction 0

    EC1100 Site Preparation 43

    EC1230 Excavation 24

    EC1320 Install Underground Water Lines 12

    EC1330 Install Underground Electric Conduit 12

    EC1340 Form/Pour Concrete Footings 24

    EC1350 Concrete Foundation Walls 24

    EC1360 Form and Pour Slab 12

    EC1370 Backfill and Compact Walls 5

    EC1380 Foundation Phase Complete 0

    Structure 154

    EC1390 Erect Structural Frame 48

    EC1420 Floor Decking 34

    EC1430 Concrete First Floor 36

    EC1540 Structure Complete 0

    EC1480 Concrete Second Floor 36EC1460 Erect Stairwell and Elevator Walls 24

    EC1470 Concrete Basement Slab 24

    EC1410 Begin Structural Phase 0

    Mechanical/Electrical Systems 575

    EC1690 Rough In Complete 0

    EC1490 Rough-In Phase Begins 0

    Elevator 227

    EC1710 Install Elevator Cab and Finishes 5

    EC1520 Install Elevator Rails and Equipment 2

    HVAC 575

    EC1190 Prepare and Solicit Bids for Heat Pump 14

    EC1240 Review Bids for Heat Pump 10

    EC1270 Award Contract for Heat Pump 6

    EC1290 Fabricate and Deliver Heat Pump and Controls 422

    EC1650 Set Heat Pump 12

    EC1680 Startup and Test HVAC 2

    EC1830 Test and Balance HVAC Equipment 2

    EC1670 Relocate HVAC Chiller 7

    EC1770 Install AC Grills and Registers 5

  • 7/29/2019 Primavera Workshop

    10/14

    EC1630 Insulate Ducts 5

    EC1500 Install HVAC Ducts 24

    Plumbing and Electrical 267

    EC1660 Connect Equipment 1

    EC1640 Install Wiring and Cable 36

    EC1440 Set Mechanical and Electrical Equipment 36

    EC1510 Rough-In Plumbing/Piping 2Exterior Finishes 338

    EC1620 Building Enclosed 0

    EC1590 Close-In Phase Begins 0

    Brick 314

    EC1550 Brick Exterior Walls 17

    EC1180 Prepare and Solicit Bids for Brick Exterior 14

    EC1220 Review Bids for Brick 14

    EC1260 Award Contract for Brick 5

    EC1040 Assemble Brick Samples 0

    EC1070 Review and Approve Brick Samples 30

    EC1280 Deliver Brick 1

    Roof 24

    EC1600 Insulation and Built-up Roofing 24

    Doors and Windows 7

    EC1560 Install Door and Window Frames 2

    EC1580 Install Exterior Doors and Windows 5

    Interior Finishes 614

    EC1700 Drywall in Offices 36

    EC1820 Touch-up and Clean-up 2

    EC1840 Finishes Complete 0

    EC1850 Punch List 5EC1860 Building Addition Complete 0

    Plumbing and Lighting Fixtures 45

    EC1810 Install Plumbing Fixtures 5

    EC1760 Install Lighting Fixtures 7

    Floor and Carpeting 592

    EC1790 Install Floor and Carpeting 12

    EC1170 Prepare and Solicit Bids for Flooring 24

    EC1250 Review Bids for Flooring 14

    EC1300 Award Contract for Flooring 5

    EC1060 Assemble and Submit Flooring Samples 0

    EC1080 Review and Approve Flooring 28

    EC1310 Fabricate and Deliver Flooring 278

    Carpentry 60

    EC1740 Install Ceiling Grid 36

    EC1800 Finish Carpentry and Millwork 12

    Paint 12

    EC1720 Paint Building Interior 12

  • 7/29/2019 Primavera Workshop

    11/14

    Early Start Early Finish Predecessors Successors

    18-Jan-13 11-Sep-15

    18-Jan-13 11-Sep-15

    18-Jan-13 11-Sep-15

    18-Jan-13 21-Jun-13

    18-Jan-13 5-Apr-13 EC1010 EC10306-May-13 15-May-13 EC1030 EC1160

    16-May-13 21-Jun-13 EC1050 EC1190

    5-Apr-13 6-May-13 EC1000 EC1040, EC1050, EC1060,

    18-Jan-13 EC1000

    6-May-13 22-Nov-13

    6-May-13 EC1030 EC1100

    6-May-13 4-Jul-13 EC1090 EC1230

    5-Jul-13 7-Aug-13 EC1100 EC1320, EC1330

    8-Aug-13 23-Aug-13 EC1230 EC1340

    8-Aug-13 23-Aug-13 EC1230 EC1340

    26-Aug-13 26-Sep-13 EC1320, EC1330 EC1350

    27-Sep-13 30-Oct-13 EC1340 EC1360

    31-Oct-13 15-Nov-13 EC1350 EC1370

    18-Nov-13 22-Nov-13 EC1360 EC1380, EC1390

    22-Nov-13 EC1370

    22-Nov-13 26-Jun-14

    22-Nov-13 29-Jan-14 EC1370 EC1410, EC1420

    29-Jan-14 18-Mar-14 EC1390 EC1430

    18-Mar-14 7-May-14 EC1420 EC1460, EC1470, EC1440,

    26-Jun-14 EC1460, EC1470, EC1480 EC1550

    7-May-14 26-Jun-14 EC1430 EC15407-May-14 10-Jun-14 EC1430 EC1540, EC1520

    7-May-14 10-Jun-14 EC1430 EC1540

    29-Jan-14 EC1390

    24-Jun-13 4-Sep-15

    16-Apr-15 EC1520, EC1680 EC1700, EC1710

    16-May-14 EC1440 EC1680, EC1520

    10-Jun-14 23-Apr-15

    17-Apr-15 23-Apr-15 EC1620, EC1690 EC1820

    10-Jun-14 12-Jun-14 EC1460, EC1490 EC1690

    24-Jun-13 4-Sep-15

    24-Jun-13 12-Jul-13 EC1160 EC1240

    12-Jul-13 25-Jul-13 EC1190 EC1270

    26-Jul-13 2-Aug-13 EC1240 EC1290

    5-Aug-13 18-Mar-15 EC1270 EC1650

    18-Mar-15 3-Apr-15 EC1290, EC1620, EC1630 EC1660, EC1670

    14-Apr-15 16-Apr-15 EC1660, EC1670, EC1490 EC1690

    2-Sep-15 4-Sep-15 EC1820 EC1840

    3-Apr-15 14-Apr-15 EC1650 EC1680

    18-Jun-15 24-Jun-15 EC1740 EC1790

  • 7/29/2019 Primavera Workshop

    12/14

    22-Aug-14 28-Aug-14 EC1620, EC1500 EC1650

    16-May-14 19-Jun-14 EC1440 EC1630, EC1510

    27-Mar-14 6-Apr-15

    3-Apr-15 6-Apr-15 EC1650, EC1640 EC1680

    22-Aug-14 13-Oct-14 EC1620, EC1510 EC1660

    27-Mar-14 16-May-14 EC1430 EC1490, EC1500

    22-May-14 26-May-14 EC1500 EC16406-May-13 22-Aug-14

    22-Aug-14 EC1600, EC1580 EC1630, EC1650, EC1640,

    21-Jul-14 EC1550

    6-May-13 21-Jul-14

    26-Jun-14 21-Jul-14 EC1280, EC1540 EC1590, EC1560, EC1600

    17-Jun-13 8-Jul-13 EC1070 EC1220

    8-Jul-13 26-Jul-13 EC1180 EC1260

    26-Jul-13 2-Aug-13 EC1220 EC1280

    6-May-13 EC1030 EC1070

    6-May-13 17-Jun-13 EC1040 EC1180

    2-Aug-13 5-Aug-13 EC1260 EC1550

    21-Jul-14 22-Aug-14

    21-Jul-14 22-Aug-14 EC1550, EC1580 EC1620

    3-Jul-14 14-Jul-14

    3-Jul-14 7-Jul-14 EC1550 EC1580

    7-Jul-14 14-Jul-14 EC1560 EC1600, EC1620

    6-May-13 11-Sep-15

    17-Apr-15 5-Jun-15 EC1620, EC1690 EC1740, EC1720

    31-Aug-15 2-Sep-15 EC1800, EC1810, EC1710, EC1830

    4-Sep-15 EC1830 EC1850

    4-Sep-15 11-Sep-15 EC1840 EC186011-Sep-15 EC1850

    18-Jun-15 19-Aug-15

    13-Aug-15 19-Aug-15 EC1790 EC1820

    18-Jun-15 29-Jun-15 EC1740 EC1790

    6-May-13 12-Aug-15

    28-Jul-15 12-Aug-15 EC1310, EC1740, EC1760, EC1800, EC1810

    13-Jun-13 17-Jul-13 EC1080 EC1250

    17-Jul-13 7-Aug-13 EC1170 EC1300

    7-Aug-13 13-Aug-13 EC1250 EC1310

    6-May-13 EC1030 EC1080

    6-May-13 13-Jun-13 EC1060 EC1170

    14-Aug-13 8-Sep-14 EC1300 EC1790

    8-Jun-15 28-Aug-15

    8-Jun-15 27-Jul-15 EC1700 EC1760, EC1770, EC1790

    13-Aug-15 28-Aug-15 EC1790 EC1820

    28-Apr-15 13-May-15

    28-Apr-15 13-May-15 EC1700 EC1820

  • 7/29/2019 Primavera Workshop

    13/14

    Resources Budgeted Budgeted Nonlabor At Completion Labo Total Float

    20034 634 20034 0

    20034 634 20034 0

    20034 634 20034 0

    1330 0 1330 0

    Paul Kim, Paul Kim 883 0 883 0Paul Kim 58 0 58 0

    Paul Kim 216 0 216 0

    Paul Kim 173 0 173 0

    0 0 0 0

    4339 0 4339 470

    0 0 0 130

    Excavator 346 0 346 130

    Excavator, Excavator 384 0 384 130

    Plumber, Plumber 192 0 192 130

    Electrician, Electrician 192 0 192 130

    Ironworker, Rough Carpenter, Eq 1152 0 1152 130

    Ironworker, Laborer-Constructio 1152 0 1152 130

    Finish Carpenter, Ironworker, Ro 768 0 768 130

    Excavator, Finish Carpenter, Exca 154 0 154 130

    0 0 0 470

    3878 0 3878 316

    Ironworker, Ironworker 768 0 768 130

    Ironworker, Ironworker, Ironwor 806 0 806 130

    Ironworker, Laborer-Constructio 576 0 576 130

    0 0 0 130

    Ironworker, Laborer-Constructio 576 0 576 130Laborer-Construction 192 0 192 142

    Ironworker, Laborer-Constructio 960 0 960 142

    0 0 0 422

    5280 518 5280 0

    0 0 0 0

    0 0 0 237

    77 0 77 91

    Elevator Installer 38 0 38 91

    Elevator Installer, Elevator Install 38 0 38 220

    4262 518 4262 0

    Project Controls, Project Control 115 0 115 0

    Project Controls, Project Control 77 0 77 0

    0 0 0 0

    Project Controls, Project Control 3379 0 3379 0

    Equipment Operator 96 0 96 0

    Equipment Operator 19 0 19 0

    Equipment Operator, Equipment 38 0 38 0

    Equipment Operator, Electrician, 77 58 77 0

    0 0 0 23

  • 7/29/2019 Primavera Workshop

    14/14

    HVAC Crew, HVAC Crew 77 77 77 143

    HVAC Crew, HVAC Crew 384 384 384 189

    941 0 941 6

    0 0 0 6

    Electrician, Electrician 576 0 576 130

    Equipment Operator 288 0 288 189

    Plumber, , Plumber, 77 0 77 1911277 0 1277 275

    EC1700, EC1710 0 0 0 130

    0 0 0 299

    778 0 778 130

    Laborer-Construction, Laborer-C 269 0 269 130

    Project Controls, Project Control 115 0 115 363

    Project Controls, Project Control 115 0 115 363

    Project Controls, Project Control 38 0 38 363

    0 0 0 363

    Paul Kim 240 0 240 363

    0 0 0 363

    384 0 384 130

    Laborer-Construction, Laborer-C 384 0 384 130

    115 0 115 159

    Finish Carpenter, Finish Carpente 38 0 38 159

    Finish Carpenter, Finish Carpente 77 0 77 159

    3930 115 3930 0

    Finish Carpenter 288 0 288 0

    Finish Carpenter, Laborer-Constr 38 6 38 0

    0 0 0 0

    Painting Crew, Finish Carpenter, 77 13 77 00 0 0 0

    154 0 154 7

    Plumber 38 0 38 7

    Electrician, 115 0 115 21

    2893 0 2893 0

    Floor and Carpet Layer 96 0 96 0

    Project Controls, Project Control 192 0 192 231

    Project Controls, Project Control 115 0 115 231

    Project Controls, Project Control 38 0 38 231

    0 0 0 231

    Paul Kim 224 0 224 231

    Project Controls, Project Control 2227 0 2227 231

    384 0 384 0

    Finish Carpenter 288 0 288 0

    Finish Carpenter 96 0 96 0

    96 96 96 77

    Painting Crew 96 96 96 77