Primavera Data Integrity When Performing Imports 4-30-13

80
Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 1

description

import

Transcript of Primavera Data Integrity When Performing Imports 4-30-13

Page 1: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 1

Page 2: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 2

FYI: New Portal with same DocID

Archive

740964.1

Schedule

740966.1

Generic Advisor

Webcast Note

740966.1

before

now

Page 3: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 3

Data Integrity When Performing P6 Imports

Teleconference Access: US & Canada: 888-259-4812 Toll Number: 706-679-4880 Password: AdvisorPG Current Advisor Webcast Schedule and Archived Download – DOC#740966.1

Upcoming live webcasts and recent recordings:

April 25, 2013: PeopleSoft Payroll for North America and Benefits Release

9.2 – Empowering Employees with Employee Self Service

April 25, 2013: PeopleSoft: Your Upgrade: Preparing for Platform Changes

April 25, 2013: JDE E1: Change Assistant: Overview and Benefits

April 25, 2013: Database: Automation of patch conflict resolution and

deployment through EM 12c

April 25, 2013: EBS – MFG: ASCP-Rapid Planning Integration

April 30, 2013: FM: Diagnostics Enhancements in SOA Suite 11g PS6

(11.1.1.7)

April 30, 2013: Mutexes in Oracle Database

April 30, 2013: Demonstration of the benefits of PeopleSoft ePerformance

9.2

May 1, 2013: What’s New in PeopleSoft Recruiting Solutions 9.2

May 2, 2013: Campus Solutions: Financial Aid Regulagtory 2013-2014

Release 3 (9.0 Bundle #29)

May 2, 2013: PeopleTools: Search Framework Introduction and Setup

May 7, 2013: Upgrading to PeopleTools 8.53

May 7, 2013: Oracle Systems: Best Practices for Migrating to Oracle

Solaris 11

May 7, 2013: Proactive Capabilities in MOS for JD Edwards EnterpriseOne

Page 4: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 4

The following is intended to outline our general

product direction. It is intended for information

purposes only, and may not be incorporated into

any contract. It is not a commitment to deliver any

material, code, or functionality, and should not be

relied upon in making purchasing decision. The

development, release, and timing of any features

or functionality described for Oracle’s products

remains at the sole discretion of Oracle.

Safe Harbor Statement

Page 5: Primavera Data Integrity When Performing Imports 4-30-13

<Insert Picture Here>

Data Integrity When Performing P6 Imports

Ifeanyi Enigwe

Technical Support Engineer

Page 6: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 6

AGENDA

Today’s presentation will cover the following:

Project level Import Actions

Activity level Import Actions

Activity Costs

Activity Relationships

Resource Assignments

Activity Codes

Reflection Projects

Page 7: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 7

AGENDA (cont’d)

Today’s presentation we will cover the following:

P6 Pro vs. P6 Web import options

XML vs. XER Differences

XML Web Import

P6 R8.3 XML Import Improvements

Page 8: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 8

Project Level Import Actions

Add Into Existing Project

Create New Project

Ignore this Project

Replace Existing Project

Update Existing Project

Page 9: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 9

Project Level Import Actions (cont’d)

Add Into Existing Project

Purpose: Merge Project Data

Page 10: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 10

Project Level Import Actions (cont’d)

Add Into Existing Project

Page 11: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 11

Project Level Import Actions (cont’d)

Real World Example: Add Into Existing Project

Scheduler has a master schedule.

Outsources WBS nodes to different contractors

Merge these WBS nodes into the Master schedule.

Page 12: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 12

Project Level Import Actions (cont’d)

Create New Project

Page 13: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 13

Project Level Import Actions (cont’d)

“Create New Project”

Project IDs remain unique

Project IDs can be changed

Page 14: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 14

Project Level Import Actions (cont’d)

Real World Example

Preserve the existing project in the database.

Create a new project based on an existing

schedule.

Page 15: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 15

Project Level Import Actions (cont’d)

Ignore This Project

Page 16: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 16

Project Level Import Actions (cont’d)

Replace Existing Project

Page 17: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 17

Project Level Import Actions (cont’d)

Replace Existing Project: Real World Example:

Page 18: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 18

Project Level Import Actions (cont’d)

Update Existing Project

Adds New Data if the Data does not currently

exist.

Page 19: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 19

Project Level Import Actions (cont’d)

Real World Example: Update Existing Project

Master Schedule the same activities as update

file

Update file has logic ties that aren’t in Master

Schedule

Page 20: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 20

Activity Level Import Actions

Do Not Import

Insert New

Keep Existing

Update Existing

Page 21: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 21

Activity Level Import Actions (cont’d)

Page 22: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 22

Activity Level Import Actions (cont’d)

Page 23: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 23

Activity Level Import Actions (cont’d)

Existing Data No Data

Page 24: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 24

Activity Level Import Actions (cont’d)

“Do Not Import”

The record is not imported. No changes are

made to the existing record.

Page 25: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 25

Activity Level Import Actions (cont’d)

“Insert New”

A new record is added to the database.

With Data

Page 26: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 26

Activity Level Import Actions (cont’d)

“Insert New”

A new record is added to the database.

Without Data

Page 27: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 27

Activity Level Import Actions (cont’d)

“Keep Existing”

No Changes made to import file or database.

A new record is added to the database

With Data

Page 28: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 28

Activity Level Import Actions (cont’d)

“Keep Existing”

A new record is added to the database

Without Data

Page 29: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 29

Activity Level Import Actions (cont’d)

“Update Existing”

Data associated with the record is updated.

Record added to the database.

With Data

Page 30: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 30

Activity Level Import Actions (cont’d)

“Update Existing”

Record added to the database.

Without Data

Page 31: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 31

Activity Costs

Expense Costs

Resource Costs

Page 32: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 32

Activity Costs (cont’d)

Expense Costs

Expenses assigned to activities will import with

the project.

Page 33: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 33

Activity Costs (cont’d)

Resource Costs

Page 34: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 34

Activity Costs (cont’d)

Resource Costs

Price / Unit

Decimals

Exchange Rate

Page 35: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 35

Activity Costs (cont’d)

Resource Costs

Page 36: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 36

Activity Costs (cont’d)

Resource Costs

Price/Unit

Calculate Cost from Units Tab

Rate Source

Page 37: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 37

Activity Costs (cont’d)

Resource Costs

Page 38: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 38

Activity Costs (cont’d)

Resource Costs

Page 39: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 39

Activity Costs (cont’d)

Resource Costs

Page 40: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 40

Activity Costs (cont’d)

Resource Costs

Page 41: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 41

Activity Costs (cont’d)

Resource Costs

Page 42: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 42

Resources Assignments

Page 43: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 43

Resources Assignments (cont’d)

Page 44: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 44

Importing Activity Relationships

How Does P6 Handle the Import of External

Relationships?

Keep Existing

Update Existing

Insert New

Do Not Import

Delete

Page 45: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 45

Importing Activity Relationships (cont’d)

How Does P6 Handle the Import of External

Relationships?

Keep Existing

Update Existing

Insert New

Do Not Import

Delete

Page 46: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 46

Importing Activity Relationships (cont’d)

How Does P6 Handle the Import of External

Relationships?

Important Information Regarding the Import Process

Project ID, Activity ID, and Relationship Type.

“Edit Project Activity Relationships” privilege

“Add/Edit Project Activities Except Relationships” privilege

External project/external activity not in database.

The “Delete field”

Page 47: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 47

Activity Codes

EPS Codes

Secure Codes

Page 48: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 48

Activity Codes (cont’d)

EPS Codes

Page 49: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 49

Activity Codes (cont’d)

EPS Codes

Page 50: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 50

Activity Codes (cont’d)

EPS Codes

Page 51: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 51

Activity Codes (cont’d)

EPS Codes

Page 52: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 52

Activity Codes (cont’d)

EPS Codes

Page 53: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 53

Activity Codes

Secure Codes

Page 54: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 54

Reflection Projects

Page 55: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 55

Reflection Projects (cont’d)

Page 56: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 56

Web & Client Differences

P6 Client Import Options

Page 57: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 57

Web & Client Differences (cont’d)

P6 Web Import Options

Page 58: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 58

Web & Client Differences (cont’d)

P6 Web Import Options

Page 59: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 59

XML & XER Differences

Wizard

Data

Page 60: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 60

XML & XER Differences: Wizard

Import Based on Security

Resource/Role Imports

Individual Data Types

Multiple Projects

Methodology Manager

Import Options

Page 61: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 61

XML & XER Differences: Wizard (cont’d)

Import Product and Documents

Import Exclusive Access

Published Schema vs. Proprietary Format

Matching options on all business objects

Limit Project Data

Calculated Fields & Physical Fields.

Performance(Speed)

Page 62: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 62

XML & XER Differences: Wizard (cont’d)

Files Versions

Global Data

Matching Data Level

Shifts

External Relationships

Page 63: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 63

XML & XER Differences: Wizard (cont’d)

Modify Option for Code Assignments

Past Period Actuals (PPA)

Effect Dates

Page 64: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 64

XML & XER Differences: Data

Business Rules/Errors

WP and Documents

Bucket Planning

Taskuser table

Admin Preferences

PPA values/Financial Periods

Page 65: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 65

XML & XER Differences: Data (cont’d)

Duplicate Resource Assignments

Issue Codes

Secure codes

Calendar Data

Page 66: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 66

XML & XER Differences: Data (cont’d)

EPS Codes

Codes Length

WBS RSRC category table

Page 67: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 67

XML & XER Differences: Data (cont’d)

Resource Security

Honors Resource Security

Resource not in user’s Security node

Users with ‘View Privileges’

Page 68: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 68

XML & XER Differences: Data (cont’d)

Issue History

Activity Owner

Responsible Manager (OBS)

Resource Dictionary/Assignments

Page 69: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 69

P6 R8.3 XML Import Granularity

XML Import Improvements

Multi Project XML

Handling of Global Data

Codes

UDFs

Calendars

Resources

Import Templates

Log File

Page 70: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 70

P6 R8.3 XML Import Granularity (cont’d)

XML Import Improvements - Codes

Page 71: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 71

P6 R8.3 XML Import Granularity (cont’d)

XML Import Improvements – User Defined Fields

Page 72: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 72

P6 R8.3 XML Import Granularity (cont’d)

XML Import Improvements – Calendars

Page 73: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 73

P6 R8.3 XML Import Granularity (cont’d)

XML Import Improvements – Resources

Page 74: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 74

P6 R8.3 XML Import Granularity (cont’d)

XML Import Improvements – Log File

Page 75: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 75

P6 R8.3 XML Import UN/CEFACT Support

Schedule formats

Export Only

Desktop Client and P6 Web

Page 76: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 76

Conclusion

References

KM Budgeted Costs Are Not Imported Correctly When Importing An XER Into A Different Database [Article ID 897284.1]

KM Considerations For Importing Microsoft Project Files (MPP, MPX, XML) Into P6 And Contractor [ID 903268.1]

KM Unable to Import P3 Project Directly into P6 [ID 910992.1]

KM Differences Between XML and XER Import / Export in Project Management [ID 907653.1]

KM How To Import EPS Activity Code Assignments From An XER File [ID 901318.1]

Page 77: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 77

Conclusion (cont’d)

Q & A Q: Is there any resume table for XML and XER differences?

A: See KM: Differences Between XML and XER Import / Export in

Project Management [ID 907653.1]

Q: Does XML support multiple project imports?

A: Yes

Q: If the user does not have the ability to add resources, does the

XML import utility gray out the resources selections; since the user

does not have the ability to import resources through security?

A: Yes

Q: Is Microsoft project 2010 supported by 8.3?

A: Yes, but only in XML format.

Q: If you setup a XML import template in EPPM is that template

visible in P6 professional?

A: Yes

Page 78: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 78

Are You Ready To Get Proactive?

Avoid the unexpected

Don’t leave value on the table

Lower overall organizational costs through preventative

maintenance

Reduce risks and maximize uptime

Achieve resolution faster

Streamline and simplify your daily operations

Get even more through connection

Page 79: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 79

Page 80: Primavera Data Integrity When Performing Imports 4-30-13

Copyright © 2013, Oracle and/or its affiliates. All rights reserved. 80

THANK YOU