PIONIER eInfrastructure for research
and new services development
Robert Pękal, Maciej Stroiński
Poznań Supercomputing and Networking Center
17-21.04.2011, Spring 2011 Internet2 Member Meeting
Poland in European Union
European & Polish Models of e-Infrastructure
European Model Polish Model Responsible Intitutions
• Local dark fibre investment and ownership
• Delivering IP based & VPN services
• Cost sharing (recovery) model for academic community
• Testbeds in new technologies
• Taking part in Regional Development Plan setup
• R&D regional IT infrastructure development coordination
Academic MAN activity
• Is acting under the umbrella of the legal entity of university or R&D institution
• Is obliged to service regional academic community
• Has a legal permission to act as IT operator or ISP
• Is authorized to apply for Ministry of Science grants to develop new services
• Is co-operating closely with local community
• Is a member of the Polish national PIONIER Consortium
Every academic MAN:
PIONIER - National Research and Education Network
• Area 312k sq km
• Population 38M
• Main academic centers 21
• State universities 165+
• Students 2M+ • R&D institutions and Univ. interconnected via PIONIER network 700+
22 MANs and 5 HPC Centers in PIONIER Consortium with PSNC as Operator
How PIONIER is constructed?
6169 km of fiber infrastructure in Poland 763 km of fiber in Germany (IRU)
6932 km of fiber in total
3 different models of development and ownership
pipes and cables ownership
(mutual investment)
fibers in a common cable
fiber cable ownership
How PIONIER is constructed?
PIONIER fiber optics
technologies
ground
ground, along railways
power distribution system
PIONIER teletransmission
ZIELONA GÓRA
KATOWICE
KRAKÓW
LUBLIN
WARSZAWA
BYDGOSZCZ
TORUŃ
CZĘSTOCHOWA
BIAŁYSTOK
OLSZTYN
RZESZÓW Bielsko-Biała
KOSZALIN
SZCZECIN
WROCŁAW
ŁÓDŹ
KIELCE
PUŁAWY
OPOLE
RADOM
CESNET; SANET 2x10 Gb/s
GÉANT2 10+10 Gb/s
CBDF 10Gb/s
Zamość
UKRAINE 1x10 Gb/s
Gorzów
PIONIER network node
2 x 10 Gb/s (2 lambdas)
POZNAŃ
Elbląg Suwałki
LITHUANIA 1 x 10 Gb/s
BIELARUS 1 x 10 Gb/s
GDAŃSK
RUSSIA (Kaliningrad) 1 x 10 Gb/s
Colorless and directionless 80ch DWDM system
Sochaczew
Hamburg (Surfnet, Nordunet) 4x10 Gb/s
Network Operation Center
• Operate 24 / 7 / 365
• 2 Network Operation Centers
– Poznan
– Lodz
• Out-of-band management
• Monitoring facilities
• Full set of measurement
equipment
Result: 99,99% reliability in Pionier
• Science institutions – 198
• Universities – 165
• Public institutions– 158 • include: Police offices – 18, Fire Guard offices – 10, public TV offices – 11
• Public authorities – 105, include: • Marshall offices – 13 • Voivodship offices – 13 • City Hall offices – 20
• Białystok (6), Bydgoszcz (8), Kielce (2), Koszalin (2), Kraków (10), Lublin (3), Łódź (11), Opole (2), Poznań (16), Wrocław (2), Zielona Góra (3)
• Colleges and comprehensive schools – 115
• Libraries, Museums, Archieves – 134
• Hospitals – 95
PIONIER & MAN’s environment:
• PIONIER is a consortium of 22 academic MANs and HPCs
• PIONIER is supervised by PIONIER Board consisting of 22 representatives, 4 from them creates Executive Committee
• PIONIER network is financed from the member fee
• Member fee is based on the cost sharing model
• Each year PIONIER Board take a decision about the framework and parameters of a cost sharing model
• One member is selected to play the role of the PIONIER network operator (PSNC)
How PIONIER is organized:
Cross Border Fibers
Direct Fiber connections to NRENs
Geant connections
GLIF connections
Research
PIONIER infrastructure as an integral part of ERA
Innovation Education
100G in PIONIER network – logical connections
May I answer Your questions? Thanks for Your kind attention