FLOOD CBA SEMINAR Lisbon, january 21, 2014 Prevention l Planning l Helping PREVENT FLOODING IN LISBON CITY 2014 Câmara Municipal de Lisboa | Serviço Municipal de Proteção

description

PREVENT FLOODING IN LISBON CITY 2014. Câmara Municipal de Lisboa | Serviço Municipal de Proteção Civil. SUMARY. LISBON INDICATORS BY GIS LISBON'S CIVIL PROTECTION SERVICE EXPECTED RISKS IN LISBON CITY urban floods PREVENTION MEASURES USED TO MITIGATE FLOOD CONSEQUENCES: - PowerPoint PPT Presentation

Transcript of PREVENT FLOODING IN LISBON CITY 2014

Page 1: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

PREVENTFLOODING IN LISBON CITY

2014

Câmara Municipal de Lisboa | Serviço Municipal de Proteção Civil

Page 2: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

LISBON INDICATORS BY GIS LISBON'S CIVIL PROTECTION SERVICE EXPECTED RISKS IN LISBON CITY

urban floods PREVENTION MEASURES USED TO MITIGATE FLOOD CONSEQUENCES:

forecasting and warning risk analysis/emergency planning technical and scientific

collaboration public information

FUTURE CHALLENGES CONCLUSION

SUMARY

Page 3: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l HelpingFonte: Atlas da AML 2003 e www.aml.pt

LISBON IN NUMBERS (2011): CITY AREA: 84,4 km2

(2,8% of the Lisbon Region)(7,5% flood hazard)RESIDENT POPULATION:547.733 inhabitants(19,3% of Lisbon Region population);DURING DAY: one million people POPULATION DENSITY 6463 inhabit/km2

NATIONAL EMPLOYMENT: 32,7%GDP: 46%BUILDINGS: 52.496 LODGINGS: 323.076

LISBON INDICATORS BY GIS

Page 4: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

LISBON IN MAPS (GIS Support)LISBON INDICATORS BY GIS

Location Hypsometry Hydrology

Geology Inhabitants Streams

Page 5: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

in 1985, after the 1983 floods

by resolution of the municipal council 331/AML/85 (November 28th)

LISBON CIVIL PROTECTION was created:

Praça Dom Pedro IV Rua do Comércio Rua de São Paulo

LISBON'S CIVIL PROTECTION SERVICE

Page 6: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

The Civil Protection Department (CPD) is a service of the Lisbon Municipality, responsible for the management of the city during crisis and exceptional conditions, in articulation with the National and District Authorities for Civil Protection.According to the Portuguese law, the main mission of CPD is the prevention of collective risks and their effects in case of disaster or accident with likelihood of occurrence inside the geographical limits of Lisbon city.

MISSION

www.cm-lisboa.pt

LISBON'S CIVIL PROTECTION SERVICE

Page 7: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

CPD MANAGMENT CYCLEPREVENTION

MITIGATION

DAILY EMERGENCY RESPONSE

RECOVERY

LISBON'S CIVIL PROTECTION SERVICE

Page 8: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

Low Medium Raised ExtremeEpidemics

Environmental | ecological disasters Terrorism, public disorder

SabotageForest fire

Building collapse Urban fire

Industrial accidents

Infrastructure collapse Transport of dangerous goods| gas stations

Train AccidentsRoad traffic accidents Accidents in the River

Air AccidentsLandslideTsunamis

Earthquakes Floods

Strong fluvial agitation| storm surgesPrecipitation

Wind speed and gusts, thunderstormCold waveHot wave

MULTI-RISKIntense precipitation or persistence of rainy days can cause urban flood events by the abnormal flux of pluvial waters.The Elevated Storm Surge combined with the High Astronomic Tide and moments of heavy rain are the principal causes of Lisbon floods.Other expected causes are the occurrence of a tsunami. These situations will be more dangerous in the lower parts of the city, near the Tagus Estuary.

EXPECTED RISKS IN LISBON CITY

Page 9: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

URBAN FLOODS EXPECTED RISKS IN LISBON CITY

URGENT ROAD DRAINAGE

MAINTENANCE INFRASTRUCTURE FAILURE

ROADS CLOSED –

TRAFFIC DISRUPTION

A CITY AT RISKINFRASTRUCTURE FAILURE

Page 10: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

Fonte: CML/Departamento de Saneamento

FLOODS IN LISBON CITY

URBAN FLOODS2nd November 1997

Xabregas

Page 11: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

Fonte: CML/Departamento de Saneamento

Alcântara

Campo Grande(tunnel)

Av. República

FLOODS IN LISBON CITY

URBAN FLOODS18th February 2008

Page 12: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

Fonte: CML/Departamento de Saneamento

Calç. Carriche/ Est. Desvio

Est. Chelas/Calç. Picheleira

FLOODS IN LISBON CITY

URBAN FLOODS18th February 2008

Page 13: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

Fonte: CML/Departamento de Saneamento

Sete Rios

2ª Circular

FLOODS IN LISBON CITY

URBAN FLOODS

18th October 2008

Page 14: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

Rossio/Portas de Santo Antão

R. São José

FLOODS IN LISBON CITY

URBAN FLOODS29th October 2010

Page 15: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

HISTORICAL SITUATIONS OF HEAVY

RAIN THAT CAUSED FLOODS IN LISBON

Lisbon had some episodes of severe storm weather situations with damages that should not be underestimated (like the tornado on the14th April 2010 and some flood situations).

DATE Return period for 1hour

19-11-1983

500 52.7mm (G)

60.3mm (GC)26-11-1967

 10043.4mm (G) 49mm (GC)

08-11-198318-10-199702-11-199718-10-1997

29-10-2010

50 39.4mm (G) 44.2mm (GC)

26-11-198520

34.1mm (G) 37.8mm (GC)

12-05-199327-07-199920-10-199924-12-200225-09-1976

1030mm (G)

32.7mm (GC));

10-02-197927-12-198128-08-198724-11-199718-10-2008(G); (GC) - Meteorological Ground Stations

Page 16: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

CPD is linked to the national

meteorological organization, Civil

Protection authorities and universities in

order to receive warnings,

forecasts (in 7 days in advance)

and real time data.

The CPD daily analyse in REAL TIME information

for:weather

tide levelfluvial and

maritime agitation

The network system aims to integrate multiple sources of information, allowing an efficient and promptly evaluation of the alert level to issue.

FORECASTING AND WARNING

For the weather - access to MM5 and WRF models running at ISTFor Tide level and storm surge – access to the model used by FCUL

WARNINGS 2011  LEVEL TOTAL

FLUVIAL MARITIME

AGITATION

29132

PRECIPITATION 

2930

PREVENTION MEASURES

Warning levels Alert levels

Page 17: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

FLOODS VULNERABILITY study consist in:

IV - EMERGENCY PLANNING (based on the treatment of these

inputs)

III – Appling MULTI RISK MATRIX (based on risk scenarios)

II - Mapping SENSITIVE AREAS (according to vulnerability levels)

I - CROSSING information with a GIS application - flood hazard

Cartographic data

alphanumerical data

PREVENTION MEASURES

Page 18: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

INPUTS: Precipitation data, IPMA Tide – high waterDaily incidents, RSB Sewer pipe cleaning/critical areas, DHUDaily news Slopes, hypsometry, hydrology,geology, land use…Storm surge, FCUL Tsunami scenarios, FCUL-IST

PREVENTION MEASURES

PRINCIPAL INTERFACE FLOOD HAZARD

2008 - university (IST) collaboration

In update

CROSSING INFORMATION WITH A GIS APPLICATION

Page 19: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

drainage problems building's conservation problems unknown reasons other situations

MUNICIPALITY FIRE DEPARTMENT HISTORICAL FLOOD DATA

BibliotecaNacional

GEODATABASE

THE FUTURE BRINGS INCREASING FLOOD RISK!

12.720 incidents (1972-2011)

PREVENTION MEASURES

Page 20: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

FLOODING VULNERABILITY

TIDE LEVEL (5m)

MAPPING SENSITIVE AREAS

PREVENTION MEASURES

Page 21: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

Municipal Master Plan (MMP) includes for the first time a map and an article that intends to implement measures to mitigate flood hazard. http://pdm.cm-lisboa.pt/

Municipal Emergency Plan (to be approved since 2012). This document defines the role of the Municipal Civil Protection System for the imminence or occurrence of a serious accident or disaster that affects the normal functioning of the city. http://cm-lisboa.pt/

EMERGENCY PLANNING

EMERGENCY PLAN never was activated

IN APPLICATION since 2012

PREVENTION MEASURES

Page 22: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

TECHNICAL REPORTS some examples included in Local Land Use Plans, Urban Recovery Programs or other instruments

(since 2009)

PREVENTION MEASURES

Page 23: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

PROJECTS AND INTERNATIONAL NETWORK COLABORATIONPROJECTS RESPONSABILITY/PARTNERS SUBJECT

UCCLA União das Cidades Capitais Luso-Afro-Americo-Asiáticas

Civil Protection

Cidades Educadoras International Association of Educating Cities

Education / Preparedness

Cidades Resilientes UNISDR – United Nations Office for Disaster Risk Reduction

Resilience / Risk / Hazard

CERU European Center on Urban Riscks

Council of Europe Urban Risks

Urban Heat Islands and Urban Thermography Project

ESA Weather / Climate

SISTEMA OPERACIONAL INTEGRADO PREVENÇÃO RISCO METEOROLÓGICO LISBOA

POVT/QREN Forecasting and meteorological warning

CRISYS EOS - European Organisation for Security

Crisis managementCritical Response in Security and Safety Emergencies

Alert4All DLR - German Aerospace Center

Warning and alert

Prepared LNEC, SINTEJO , EPAL CML Water cycle safety planningPOP – ALERT EOS - European Organisation

for Security …Population Alerting: Linking Emergencies, Resilience and Training

Floods CBA Universidade Nova – FCSH … Knowledge Platform for assessing the costs and benefits of flood prevention measures

PREVENTION MEASURES

Page 24: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

http://meetingorganizer.copernicus.org/EGU2013/session/11836.

CIENTIFIC AND TECHNICAL SUPPORT

2013

PREVENTION MEASURES

Page 25: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

PUBLIC INFORMATION AND AWARENESSPrepare and organize the population and the Civil Protection VolunteeringSpread the civil protection system’s mission and structureSupport to the development of internal security plans

PREVENTION MEASURES

Page 26: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

Elaborate and prepare pedagogic and public publications

Support the definition of which wards or squares should be prioritized in

public information campaigns

PUBLIC INFORMATION TO THE COMMUNITYPREVENTION MEASURES

Page 27: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

FACEBOOK WEBPAGE BLOG

PUBLIC INFORMATION TO THE COMMUNITYPREVENTION MEASURES

Page 28: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

ELECTRONIC OUTDOOR PANELS

These panels are situated around the city and spread information of self-protection measures, in case of risk situation such as floods, wind speed and gusts or heavy rain.

HOW TO PREVENT

HOW TO ACT

PREVENTION MEASURES

Page 29: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

FUTURE CHALLENGES

It´s urgent to invest in this area and work together with expertise, stakeholders deciders and the community. We must speak all the same language (European policies, laws, concepts, universally symbols/icons, methodologies …). In the future, CPD must continue to integrate in an unique web platform data from different sources and linked to an integrated operational system of communications, supported by sms, cellular or satellite phones.Other priorities are: Approval the Municipal contingency plan for meteorological extreme conditions Produce new interactive materials for public information and awareness Support and participate in municipal, national and international programs, projects and studies like flooding by tsunamis.http://reliefweb.int/map/world/world-humanitarian-and-country-icons-2012

THE FUTURE BRINGS INCREASING FLOOD RISK TO DIFFERENT CITIES. Lisbon isn’t different.

Page 30: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

CONCLUSION

DISSEMINATION INFORMATION

RESPONSABILIZING AND PREPAREDNES

ALL COMUNITY

MINIMIZE EFFECTS/LOSSES

(DIRECT AND INDIRECT) OF RISK SITUATIONS

Sharing and providing this information with different organizations, entities and investigators is the first step in order to give answers to daily emergency or to a Catastrophe that can occur in Lisbon. In its desire to guarantee the safety and well-being of its inhabitants, Lisbon Municipal Council can intervene systematically in order to aware the population who will share responsibility and be capable of reproducing messages and behaviors that can contribute to the minimization of risk conditions.

Page 31: PREVENT FLOODING IN  LISBON CITY 2014

FLOOD CBA SEMINARLisbon, january 21, 2014

Prevention l Planning l Helping

[email protected]@cm-lisboa.pt

THANK YOU!Emília Castela, Luísa Coelho, Maria João Telhado, Sofia Baltazar