  • Printed copies of this manual are Uncontrolled

    Hardy Machine & Design, Inc.

    5737 Windfern

    Houston, Texas 77041

    QUALITY CONTROL MANUAL

    ASME U STAMP

    FOR

    PRESSURE VESSELS

    MASTER COPY

    February 23, 2004

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 1 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    REVISION SHEET

    REV DATE DESCRIPTION BY CHECKED

    Q.A.M Approved By: ____________________ Date: ____________________

    A.I. Accepted By: ____________________ Date: ____________________

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 2 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    Table of Contents

    1. GLOSSARY .................................................................................................................................. 3

    2. STATEMENT OF POLICY AND AUTHORITY ..................................................................... 7

    3. MANUAL CONTROL ................................................................................................................. 8

    4. DRAWING, DESIGN CALCULATIONS AND SPECIFICATION ........................................ 9

    5. MATERIALS CONTROL ........................................................................................................ 12

    6. EXAMINATION AND INSPECTION PROGRAM ............................................................... 14

    7. CORRECTION OF NONCONFORMITIES .......................................................................... 18

    8. WELDING CONTROL ............................................................................................................. 20

    9. NON DESTRUCTIVE EXAMINATION - NDE ..................................................................... 25

    10. POSTWELD HEAT TREATMENT ........................................................................................ 27 28

    11. CALIBRATION OF MEASUREMENT AND TEST EQUIPMENT .................................... 29

    12. RECORDS RETENTION ......................................................................................................... 30

    13. AUTHORIZED INSPECTOR .................................................................................................. 31

    14. ANNUAL AUDIT ....................................................................................................................... 33

    15. CONTROL OF CODE STAMP ................................................................................................ 34

    16. ORGANIZATIONAL CHART ................................................................................................. 35

    17. NATIONAL BOARD OF REGISTRATION ........................................................................... 36

    18. EXHIBITS .................................................................................................................................. 37

    Q.A.M Approved By: ____________________ Date: ____________________

    REV.

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 3 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    A.I. Accepted By: ____________________ Date: ____________________

    1. GLOSSARY

    As used in the quality Control Manual, the following terms and abbreviations are defined:

    AI

    Authorized Inspector from the ASME accredited Authorized Inspection Agency for Code

    items.

    Approve

    Signature/initials including date of acceptance as being in compliance with Code and

    Client Requirements.

    ASME

    American Society of Mechanical Engineers

    ASNT

    American Society for Nondestructive Testing

    Code

    The Applicable Codes and Standards to which work is being performed. This may be the

    ASME Boiler and Pressure Vessel Code, Sections I, V, VIII DIV. 1 and IX and associated

    ANSI Standards or Local Jurisdictional codes also National Board requirements.

    Client

    The contract requirements supplied by the Client to which Hardy Machine & Design is

    responsible for compliance. Client Requirements may include design specifications or

    drawings or applicable data from specifications as necessary for Hardy Machine & Design

    to perform fabrication and installation in compliance with the Code(s).

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 4 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    Customer/Client

    The organization that has instructed, by Contract, that Hardy Machine & Design furnishes

    fabrication services. Also applies to designees or representatives of the customer.

    Data Report

    Appropriate Code Form completed by the fabricator certifying Code compliance and

    certified by Authorized inspector.

    Department

    When department is specified, it shall be interpreted as being the manager of that

    department's responsibility or his designated representative.

    Design

    The basic owner document including specifications, drawings and calculations, which are

    required.

    Document

    A drawing, calculation, specification, procedure, instruction or other controlled printed

    information.

    Documentation

    Any form, record, or drawing that contributes to traceability or verification.

    Example Forms

    Attachments to this manual for "as-is" use or modification to project forms.

    Items

    Material, parts, sub-assemblies, components or services.

    Manual

    This Quality Control Manual.

    MT

    Magnetic Particle Examination (a form of NDE)

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 5 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    NBIC

    National Board Inspection Code

    NDE

    Nondestructive Examination - A method of indicating flaws in material or parts without

    altering effective use of the material or parts. Examples are: RT, UT, MT, PT, VT.

    PT

    Liquid Penetrant Examination (a form of NDE)

    Project Document

    A document prepared for a specific project either totally or by modification of a generic

    document.

    Q.A.M.

    Quality Assurance Manager

    Q.C.

    Quality Control

    QCSM

    Quality Control System Manual

    Repair

    Process of restoring a nonconforming characteristic to a condition so that the capability of

    an item to function reliably and safely is unimpaired, even though that item still may not

    conform to the original requirement. However, in all cases, it must conform to the Code as

    required.

    Rework

    Process by which a nonconforming item is made to conform to a prior specified

    requirements by completion, re-machining, reassembling, or other corrective means.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 6 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    RT

    Radiographic Examination (a form of NDE)

    SNT-TC-1A

    ASNT Recommended Practice SNT-TC-1A Code Accepted Condition

    UT

    Ultrasonic Examination (a form of NDE)

    Vendor

    A material manufacturer, material supplier, or subcontractor providing services.

    WPS

    Welding Procedure Specification

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 7 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    2. STATEMENT OF POLICY AND AUTHORITY

    2.1. This Quality Manual documents the quality system for manufacturing, fabricating and

    assembling of pressure vessels by Hardy Machine & Design which will meet all the

    requirements of the AMERICAN SOCIETY OF MECHANICAL ENGINEERS Boiler &

    Pressure Vessel Code Section VIII, Division 1.

    2.2. Hardy Machine & Design management is totally committed to the execution of the

    procedures established in this Quality Assurance System and in complete compliance with

    A.S.M.E. Boiler & Pressure Vessel Code Section VIII, Division 1.

    2.3. The Quality Assurance Manager of Hardy Machine & Design is delegated with authority

    and responsibility to establish, maintain, administer and audit this Quality Assurance

    System. It is his responsibility to formally report the findings, advise regarding corrective

    action and monitor that the proposed corrective action has been effectively implemented.

    2.4. If during the implementation, conflicts arise regarding Code compliance between the

    Quality Assurance Manager and other departments, it will be resolved by the Manager and

    will not negate the Code rules.

    2.5. The Quality Assurance Manager at Hardy Machine & Design is responsible for

    implementing this Quality Assurance System.

    2.6. This Quality Manual will be printed and distributed only in the English language.

    _____________________________

    Ravi Goel

    President, Hardy Machine & Design

    Date: ________________________

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 8 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    3. MANUAL CONTROL

    3.1. This Quality Manual has been prepared by Hardy Machine & Design. The Quality

    Assurance Manager is responsible for the Manual's compliance with the current A.S.M.E.

    Code. The Quality Assurance Manager is responsible for the initial issue of this Manual

    and any subsequent revisions.

    3.2. Revisions are approved by the Quality Assurance Manager and submitted to the Authorized

    Inspector for review and acceptance, prior to inclusion into the Manual and subsequent

    implementation. The Quality Assurance Manager and the Authorized Inspector will

    document their approval and acceptance on the Table of Contents. This Manual shall not

    be revised to meet client requirements. Client specifications shall be addressed via an

    addendum outside the scope of this Manual. Whenever revisions are made, the part of the

    manual that is being revised will be identified by the symbol < > adjacent to the paragraph

    revised at the left-hand margin.

    3.3. A controlled copy of the Quality Manual is available for the Authorized Inspector at the

    Shop.

    3.4. The Quality Assurance Manager will issue controlled and uncontrolled copies of the

    Manual in accordance with the list of Manual holders maintained by him as per exhibit

    number 1 (QCSM DISTRIBUTION LOG). Each Manual will bear the same control

    number on its title page as is shown on the list. Only controlled copies shall be issued

    within the Hardy Machine & Design organization.

    3.5. No part of this Manual may be reproduced or transmitted in any form or by any means

    including photocopying and recording without the written permission of Hardy Machine &

    Design.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 9 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    3.6. The Quality Assurance Manager will review Code addenda to determine if this Quality

    Manual is affected. Required revision will be made and implemented within six months of

    the addenda issue date and maintained in the QCSM Revision Log as per exhibit number 2.

    4. DRAWING, DESIGN CALCULATIONS AND SPECIFICATION

    4.1. Document Distribution (Pre-fabrication)

    4.1.1. Upon being awarded the project, the Project Manager obtains a unique project job

    number. The Project manager will then notify the Design Engineer, and all others in

    operations the identity of the job number.

    4.1.2. The Design Engineer is responsible for the distribution of all documents relative to the

    project as per exhibit number 3 (DRAWING TRANSMITTAL FORM).

    4.1.2.1. Client data sheet(s), drawing(s), and specification(s) shall be distributed to the Design

    Engineer, QA/QC Department and Shop to begin job preparation.

    4.1.2.2. The Design Engineer is responsible for issuing the latest revision(s), addendum (a) or

    change(s) of the specifications and drawings to all defined document holders.

    4.2. Drawing & Design Calculation Approval

    4.2.1. The Design Engineer is responsible for the approval process of all drawings and

    calculations as specified herein.

    4.2.1.1. The Design Engineer upon receipt of the client documents, begins preparation of the

    Design Calculations and drawings material list.

    The drawings shall include all data, informations and details required by the ASME

    Code as follows:

    1) The applicable Code edition and addenda.

    2) Identification Number

    3) Bill of Materials as per exhibit number 4 with ASME material specification including

    nominal size, grade/type, classification number and special material requirements, if

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 10 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    any, NDE or impact test requirements.

    4) Dimensions and Tolerances

    5) Weld joint configurations and/or symbols.

    6) Hydrostatic/Pneumatic Test Pressure.

    7) Reference to applicable approved procedure (WPS).

    8) Minimum Design Metal Temperature.

    4.2.1.2. One (1) set of documents are transmitted by the Design Engineer to the Client and

    Authorized Inspector for review and comments.

    4.2.1.2.1. The Design Engineer shall be responsible for pursuing a timely response to the

    documents from all parties. Any comments shall be evaluated prior to being

    incorporated into the design documents or drawings.

    4.2.1.2.2. Upon incorporation of comments all documents shall be returned back to all parties

    with final revision.

    4.2.2. The "original" documents are returned to the Design Engineer and shall be stamped or

    marked "Approved for Construction" on each drawing. A reproducible copy will be

    transmitted to the Project Manager for Official distribution and retention.

    4.3. Distribution & Revision of Drawings & Design Calculations

    4.3.1. The Design Engineer is responsible for the distribution of drawing and/or revisions.

    4.3.1.1. If during fabrication, changes to the drawing(s) are required, the proposed revision shall

    be reviewed by the Design Engineer, who will submit for review to the client for

    approval.

    4.3.1.1.1. After the client approval of the revised drawings, the drawing(s) shall reflect the

    changes and revision(s) and shall be noted in the revision blocks provided on drawing.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 11 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    4.3.1.1.2. Design calculations to support the revision (change or alteration of Design) may be

    required. The Design Engineer shall provide the calculations required.

    4.3.2. Standard and Computer Aided Designs:

    4.3.2.1. When standard or computer-aided design calculations and drawings are used, the Design

    Engineer is responsible for the input of correct design data and the verification that the

    correct output has been obtained.

    4.3.2.2. The Design Engineer will review Code addenda to determine if standard designs or

    programs are affected. Required revisions will be made and implemented within six

    months of the addenda issue date.

    4.3.2.3. All revisions are documented, signed by the Design Engineer and recorded on each

    affected document or in computer program documentation.

    4.3.2.4. Standard and computer-aided drawings and calculations output is available for review

    and acceptance by the AI. The Design Engineer provides the AI with any manual

    calculations he requests to verify computer output.

    4.3.3. Design Calculations shall be prepared and issued by the Design Engineer.

    4.3.3.1. The design calculation shall be completed by the Design Engineer.

    4.3.3.2. He shall also be responsible for the calculations and drawings, control of the changes

    and dated record of the changes.

    4.3.3.3. Design calculations that require revisions shall be performed and/or verified by the

    Design Engineer.

    4.3.4. The Design Engineer prepares a Bill Of Materials as per exhibit number 4 for the entire

    job based on the approved drawings.

    4.3.4.1. The Bill Of Materials is distributed along with contract drawings and design

    calculations.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 12 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    4.3.4.2. As contract drawings are revised, so shall the Bill Of Materials to reflect such changes.

    4.3.4.3. The Bill Of Materials shall specify Code materials in accordance with ASME Section

    VIII Division 1 and ASME Section II specifications to the required edition and

    addendum or identical ASTM specifications per Appendix A in Section II.

    5. MATERIALS CONTROL

    5.1. The Project Manager is responsible for obtaining Code materials as specified on the Bill Of

    Materials as per exhibit number 4 and for all materials. Welding materials may be ordered

    verbal or by use of a Purchase Order Exhibit 5

    5.2. The Project Manager will first source from stock inventory meeting ASME Code

    Specifications.

    5.2.1. Code materials available in stock inventory shall be identified and their mill certificates

    retrieved.

    5.2.2. Code materials determined acceptable and in conformance to Code requirements shall be

    identified with green mark. Materials not in conformance to Code requirements shall be

    identified with red mark.

    5.3. Preparations of material Purchase Order as per exhibit number 5 based on the material lists

    are the responsibility of the Project Manager.

    5.3.1. Completed Purchase Order is reviewed for Code compliance by and updated with any

    required corrections. It is then signed and dated.

    5.3.2. The Project Manager will approve the Purchase Order.

    5.4. The Project Manager is responsible for purchasing all materials, consumables and supplies

    in accordance with specifications. Any special ordering information must be noted on the

    Purchase order such as UCS-79(d), UG-80 on request for mill test reports.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 13 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    5.4.1. A copy of the Purchase Order with suppliers documentation shall be sent to the QC

    Department for review.

    5.5. Free issue material or customer supplied material must meet all Code requirements of

    ASME Section II and Section VIII, Division 1. Received material shall be documented on

    the Material Examination Report as per exhibit number 6.

    5.6. The QC Inspector is responsible for the inspection and verification of all materials

    including consumables received and/or issued to be in accordance with Code compliance.

    5.6.1. All materials are inspected visually, dimensionally and readily traceable to the mill

    certificates. The QC Inspector shall inspect and verify for conformance to the

    requirements. Material received and inspected shall be transferred to shop with all

    original receiving and inspection reports. All original records of vessel material shall be

    kept by shop. Mill test report review and acceptance will be documented by initial and

    date of the QC Inspector on the mill test report.

    5.6.2. A copy of all documentation is retained in a job file for reference fabrication.

    5.6.3. Substitution of material shall only be made with the review and approval of the Client,

    Design Engineer and Authorized Inspector.

    5.7. Material traceability shall be verified and recorded by the QC Inspector.

    5.7.1. Prior to cutting Code material, the material traceability number shall be transferred to

    each pre-determined piece to maintain traceability to cutting.

    5.7.2. All drop-off materials shall be positively identified.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 14 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    6. EXAMINATION AND INSPECTION PROGRAM

    6.1. Vessel Fabrication Stage Inspection

    6.1.1. The Examination and Inspection of ASME Code Pressure Vessels is the responsibility of

    the QC department.

    6.1.2. Stage Inspection of pressure vessels is controlled by means of a Inspection Traveler

    Sheets as per exhibit number 7 prepared from the shop drawings by the QC Inspector who

    shall assign his QC Inspection points, Hold (H), Witness (W), Review (R) or Monitor

    (M) points and sign and date the quality plan. The QC Inspector shall submit the

    Inspection Traveler Sheet to the AI prior to fabrication for his designation of inspection

    points. AI inspection points shall be noted by *.

    6.1.3. The Shop Foreman shall review the sequence of the activities provided on the Traveler

    Sheet. The sequence includes examination and inspection activities.

    6.1.4. When fabrication is complete, the QC Inspector shall perform his final inspection. If

    acceptable, he shall signify his approval by initialing and dating the Inspection Traveler

    Sheet when he has ascertained that all Code requirements have been met and shall submit

    to the Authorized Inspector and Client for approval.

    When a pressure vessel is not provided with an opening or other means of access to

    inspect internal surfaces, an inspection point for the QC Inspector, client and AI will be

    shown to permit internal inspection before starting final closure weld or bolted joint.

    6.2. Pressure Testing

    6.2.1. Pneumatic tests as prescribed in this paragraph may be used in lieu of hydrostatic testing

    or when specified, except when the Code requires hydrostatic testing.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 15 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    6.2.1.1. The QC Inspector and Authorized inspector/Client shall witness the test. They shall

    affix their initials and date onto the test chart.

    6.2.1.2. The test pressure for pneumatic testing shall be 1.25 times the Maximum Allowable

    Working Pressure (MAWP).

    6.2.1.3. The pressure shall be gradually increased to not more than half of the test pressure (1.25

    X MAWP). Thereafter, the pressure shall be increased in step one-tenth up to the test

    pressure.

    6.2.1.4. Then the pressure shall be reduced to four-fifths of the test pressure and held for

    sufficient time to permit inspection.

    6.2.1.5. When accepted, the QC Inspector/Client and Authorized Inspector shall sign and date

    the Pneumatic Test Record.

    6.2.2. Hydrostatic tests will be conducted as per ASME Code Requirements. The gauge should

    be rated over a range twice the intended test pressure but in no case less than 1-1/2 the

    test pressure or more than 4 times the test pressure.

    6.2.2.1. The temperature of the water shall be maintained as per Code requirements.

    6.2.2.1.1. For Section VIII, Division 1 vessels, they shall be subjected to a hydrostatic test

    pressure which at every point in the vessel is at least equal to 1-1/2 times the

    maximum allowable working pressure to be marked on the vessel multiplied by the

    lowest ratio (for the materials of which the vessel is constructed) of the stress value S

    for the test temperature on the vessel to the stress value S for the design temperature.

    All loading that may exist during this test shall be given consideration.

    6.2.2.1.2. It is recommended that the test pressure shall not be applied until the vessel and its

    contents are at about the same temperature. If the test temperature exceeds 120

    degrees F, it is recommended that inspection of the vessel be delayed until the

    temperature is reduced to 120 degrees F or less.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 16 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    6.2.2.2. The QC Inspector/Client shall affix his initials and date onto the test chart.

    6.2.2.3. The test pressure for hydrostatic testing shall be at least equal to 1.5 times the Maximum

    Allowable Working Pressure (MAWP).

    6.2.2.4. After successful application of the test pressure, it is reduced to two-thirds for a close

    examination of all welds.

    6.2.2.5. When accepted, the QC Inspector and Authorized Inspector/Client shall sign and date

    the Inspection Traveler Sheet.

    6.3. Data Reports

    6.3.1. Upon completion of a vessel the applicable Manufacturer's Data Report shall be prepared

    as completed from the final records by the QA Manager.

    6.3.2. The completed Manufacturer's Data Report, together with the final records, shall be

    presented to the Authorized Inspector for his review. When he is satisfied that all Code

    requirements have been met as per the Code, he will sign and date the Manufacturer's

    Data Report.

    6.3.3. The Authorized Inspector shall verify the application of the Code Symbol U-Stamp to the

    nameplate.

    6.3.4. The National Board serial numbers shall be controlled and issued by the Q.A.M.

    6.3.4.1. A record of issuance shall be kept showing date issued, type of vessel to be used upon,

    and manufacturer's serial number and date sent to the National Board.

    6.3.4.2. All pressure vessels meeting all Code requirements of the Code shall be stamped with

    the ASME Code Stamp.

    6.3.4.3. The Project Manager shall submit to the National Board the original and one legible

    copy of all Manufacturer's Data Reports required for the stamped vessel (See Section

    18).

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 17 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    6.3.5. All documentation shall be retained on file.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 18 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    7. CORRECTION OF NONCONFORMITIES

    This section describes the methods used to control and resolve nonconforming conditions

    found in material, fabrication, documentation or construction.

    7.1. Definition

    Nonconformance - is a deficiency in characteristic, documentation or procedure which

    renders the quality of an item unacceptable or indeterminate and not in compliance with the

    ASME Code and this Manual.

    7.2. Responsibility

    All personnel have the responsibility to report any non-conforming conditions, which

    they have knowledge of.

    7.2.1. It is the QC Inspector's responsibility to initiate and issue the Non-Conformance Report

    as per exhibit 8.

    7.2.2. The QC Inspector shall prescribe a recommended corrective action.

    7.3. Procedures

    Deviations will be handled by the QC Inspector.

    7.3.1. When nonconformity is found, if it cannot be immediately resolved by the QC Inspector,

    it shall be identified.

    7.3.2. A Non-Conformance Report shall be prepared for non conforming items by the QC

    Inspector

    7.3.3. Copies of the Non-Conformance Report are issued to the Addressee, Authorized

    Inspector, Project Manager Client and Shop Foreman. The original shall be retained in

    the Job File. In case of repair to the base material, the Authorized Inspector/Client will

    be notified for his concurrence and designation of his 'hold' points. All use as is

    dispositions shall be notified to the AI prior to implementation.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 19 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    7.3.4. The Project Manager shall be responsible for the final rectification of the

    nonconformance. When corrective action has been completed/accepted by the QC

    Inspector and AI, the QC Inspector and AI shall sign and date.

    7.3.5. The QC inspector shall verify that the corrective action taken has satisfactorily restored

    the condition to within compliance of the Code.

    7.3.5.1. Satisfactory results shall be documented by the Project Manager. Copies shall be

    distributed and the original retained in the file.

    7.3.5.2. Unsatisfactory results that have been ineffective in correcting the non-conformance shall

    be re-addressed by issuing a revised Non-Conformance Report.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 20 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    8. WELDING CONTROL

    8.1. General

    8.1.1. All welding on Code vessels shall comply with a written Welding Procedure

    Specification (WPS) in accordance with ASME Section IX.

    All welding on Code vessels shall be performed by qualified welders and/or operators in

    accordance with ASME Section IX.

    8.1.2. Welder(s) and Welding Operator(s) are qualified and certified to the essential variables by

    the Project Manager.

    8.2. Project Planning (Pre-Fabrication)

    8.2.1. When documents are received from the Design Engineer, the Project Manager reviews

    the drawings and specifications from which he prescribes appropriate Welding Procedure

    Specification (WPS) and Welder Qualifications for the Project.

    8.2.2. Welding Procedure Specification(s) (WPS) shall be sourced from the Design Engineer

    files to meet project requirements. Should project requirements fall outside the limits of

    the variables expressed in the Welding Procedure Specification, a new Procedure will be

    required to meet these requirements. However, if only nonessential variables are

    changed, then the WPS can be revised to reflect that change.

    8.2.3. Only qualified welders will be used for welding of Code items.

    8.2.4. Copies of the applicable Welding Procedure Specification(s) (WPS), and Welder's

    certificate shall be submitted to client through Project Management. These documents

    will be available for review to the Authorized Inspector at all times.

    8.3. Qualification of Welding Procedures

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 21 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    8.3.1. The Project Manager is responsible for conducting the qualification of procedures and

    certifying the procedure qualification record.

    8.3.2. Materials and Consumables required are sourced as per engineering requirement.

    8.3.3. Qualification and documentation of the welding procedure shall be in accordance with

    ASME IX.

    8.3.4. WPS shall be submitted to the A.I. upon request. The AI may require re-qualification of

    welders or procedures for just cause.

    8.4. Welder and Welding Operator Renewal

    8.4.1. The Project Manager will have ultimate responsibility for the maintenance of welders and

    welding operator's qualification. Qualified welders and operators continuity is

    documented on the Welders Performance Record Exhibit #9.

    8.4.2. The performance qualification of a welder or welding operator shall be affected when one

    of the following condition occur:

    8.4.2.1. When he has not welded during a period of 6 months or more using a specific process.

    8.4.2.2. When there is a specific reason to question his ability to make welds that meet the

    specification, the qualifications which support the welding he is doing shall be revoked.

    All other qualifications not questioned remain in effect.

    8.4.3. Adequate proof of documentation that supports the effective use of a welding process by

    the welder shall renew that welders qualification for another period.

    8.4.3.1. Welders that have inadequate proof of documentation or have exceeded the limits shall

    require requalification.

    8.5. Qualification of Welders and Welding Operators

    8.5.1. The Qualification of welders shall be the responsibility of the Project Manager.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 22 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    8.5.2. Welders and welding operators are qualified by any of the two methods listed below:

    test coupon

    or Production test (If not GMAW Short circuiting)

    8.5.3. Qualification of Welders and Welding Operators shall be in accordance with ASME IX.

    8.6. Production Welding

    8.6.1. The QA Manager is responsible for verifying that all production welders are qualified,

    and the Shop Foreman is responsible for instructing each welder in the appropriate WPS

    he shall use.

    8.6.2. Each welder and welding operator shall stamp or stencil the identifying number, letter, or

    symbol, assigned by the QA Manager, adjacent to and at intervals of not more than 3 ft.

    along the welds which he makes in steel plates 1/4 in. and over in thickness and in

    nonferrous plates 1/2 in. and over in thickness; or a record shall be kept by the QA

    Manager of welders and welding operators employed on each joint which shall be

    available to the Inspector. For identifying welds on vessels in which the wall thickness is

    less than 1/4 in. (6mm) for steel material and less than 1/2 in. (13mm) for nonferrous

    material, suitable stencil or other surface markings shall be used; or a record shall be kept

    of the welders and welding operators employed on each joint by the QA Manager which

    shall be available to the Authorized Inspector/Client.

    8.6.3. The appropriate Welding Procedure Specification (WPS) use shall be determined by the

    QA Manager after consultation with the Shop Foreman. The procedures will be noted on

    the "Approved for Construction" drawings (AFC).

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 23 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    8.6.4. Tack welds shall be made in accordance with qualified procedures and welders; all tack

    welds, which are not, removed, shall be feather ground and visually inspected for defects

    by the Shop Foreman. Tack welds made by subcontractors shall be removed. However,

    they shall be made in accordance with a qualified procedure approved by the Q.A.M.

    8.6.5. Welder and Welding Operators I.D. numbers are recorded onto the Welders Performance

    Record. This record is retained on file.

    8.6.6. The QC Inspector shall audit the welding in compliance to the WPS.

    8.7. Welding Material

    8.7.1. All welding filler metals and fluxes are purchased as per requirements either verbally or

    by use of a Purchase Order.

    8.7.2. All welding materials are received as per requirements.

    8.7.3. Welding materials are to be stored in accordance with the Code and Filler Metal

    Manufacturing Recommendations.

    8.7.4. It is the Shop Foremans responsibility to ensure correct Welding Consumables are used in

    accordance with the applicable Welding Procedure Specification (WPS). Sufficient

    quantity is issued to the welders to complete the welding job by the Shop Foreman who

    then instructs the welders of the correct WPS to be used. WPS are made available to all

    welders/welding operators.

    8.8. Equipment Maintenance

    8.8.1. All welding leads, cutting torches and other apparatus shall be kept clean and free of

    unnecessary dirt, grease, moisture or any other foreign matter.

    8.8.2. Welding machines shall be blown free of dust.

    8.8.3. Electrode Holding and Storage Ovens shall utilize thermostats to ensure proper

    temperature control.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 24 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    8.9. Authorized Inspector

    8.9.1. The WPS and the Welder/Welding Operator shall be requalified when required by the AI.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 25 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    9. NON DESTRUCTIVE EXAMINATION - NDE

    9.1. General

    9.1.1. All NDE shall be performed by a qualified examiner or outside company, under the

    direction of a written procedure, using calibrated equipment in accordance with ASME

    Section V and VIII, Division 1.

    9.2. Project Planning (Pre-Fabrication)

    9.2.1. When documents are received from the Design Engineer, the Project Manager reviews

    the drawings and specifications from which he prescribes the appropriate NDE

    Procedures.

    9.3. The NDE requirements of pressure vessels are noted on the fabrication drawings by the

    Engineering Manager.

    9.4. Non Destructive Examination (NDE) performed on the Code Vessels shall be conducted in

    accordance with a written procedure certified by the Level III personnel, who shall be

    qualified in accordance with written practice. SNT-TC-1A

    9.4.1. All NDE reports including radiographic film shall be reviewed for Code compliance by

    the QA Manager.

    9.4.2. Should the examiner have any doubt, he shall consult with the QC Inspector.

    9.5. Documentation & Reporting

    9.5.1. The NDE As-built drawings of the Code vessels shall be maintained by the QC Inspector

    for documentation purposes.

    9.5.2. Any or all NDE Documentation shall be made available for review to the Authorized

    Inspector/Client.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 26 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    9.5.3. All NDE Documentation shall be retained on file.

    9.6. Subcontracting

    9.6.1. The subcontractor is to perform all NDE testing. The QA Manager shall appoint by letter

    a Level III to act on behalf of Kamgage for all NDE. The Level III shall accept this

    appointment by letter.

    9.6.2. The subcontractor shall submit the calibration of his equipment and procedures for QA

    Manager's approval. All NDE personal shall be qualified in accordance with SNT-TC-1A

    Code accepted edition.

    9.6.3. Materials sent to the subcontractor's facility shall be properly identified/marked and

    inspected upon return from the vendor for proper identification and damage.

    9.6.4. As a minimum, a calibrated density strip and a film viewer will be available.

    9.6.5. The A.I. may call for requalification of procedures or personnel for just cause.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 27 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    10. POSTWELD HEAT TREATMENT

    10.1. General

    10.1.1. Postweld heat treatment shall be performed in accordance with a procedure approved by

    the QC Inspector. The requirements of the applicable sections of ASME Section VIII

    Division 1 shall be met.

    10.2. Project Planning (Pre-Fabrication)

    10.2.1. Before preparing the vessel for stress relieve the final visual and dimensional checks

    should be carried out. When it is found to be satisfactory, the QC Inspector shall sign the

    final inspection reports and the release for stress relieve.

    10.2.2. The QA Manager shall review the Postweld Heat Treatment Procedure and the Approved

    for Construction (AFC) drawings to establish the vessel thermocouple assignment.

    10.2.3. The QA Inspector and Shop Foreman shall review the thermocouple arrangement

    drawings and mark the location on the vessel.

    10.2.4. After the clamps have been welded in place in accordance with a qualified welding

    procedure, the QC Inspector shall inspect the location of the clamps prior to furnace start

    up to assure correct thermocouple location. Clamps shall be welded by Kamgage and

    shall be of appropriate material.

    10.3. Subcontracting

    10.3.1. The subcontractor is to perform a postweld heat treatment operation. The QC Inspector or

    the Project Manager will review the procedure with the subcontracting company

    representative.

    10.3.2. The subcontractor shall submit the calibration certificate of the recorder to the QA

    Manager for the approval.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 28 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    10.3.3. Materials sent to the subcontractor's facilities shall be properly identified/marked and

    inspected upon return from the vendor for proper identification and damage.

    10.4. Documentation & Records

    10.4.1. All postweld heat treatment documentation shall be signed and dated by the

    subcontractor.

    10.4.2. Visual inspection of the internals after PWHT shall be carried out by the QC Inspector.

    10.4.3. The documentation shall be presented to the Authorized Inspector/Client for his review.

    10.4.4. All documentation shall be retained on file.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 29 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    11. CALIBRATION OF MEASUREMENT AND TEST EQUIPMENT

    11.1. All test equipment, including subcontractors used for verifying Code items shall be

    calibrated in accordance with this section and Gauge Calibration Log maintained as per

    exhibit 10.

    11.2. Each item of measurement, test and examination equipment which requires calibration

    shall be identified by marking with a serial number and calibration date.

    11.3. The QC Inspector is responsible for ensuring that all equipment is maintained in current

    calibrated condition.

    11.4. Calibration may be performed by a qualified testing laboratory, having adequate standards

    traceable to the National Standards or similar, and able to provide certificates of

    calibration.

    11.5. Mechanical Test Equipment (Laboratory) shall be calibrated in accordance with ASME SA

    370.

    11.6. Each calibrated item shall have a Calibration Record maintained by the QA Manager or his

    designee in the calibration file.

    11.7. Calibration record shall be available for review.

    11.8. When instruments are found out of calibration, the QC Inspector or his designee will

    remove it from the work area and arrange for its calibration or replacement.

    11.9. Calibration of all measurements and test instruments are controlled. There will be

    calibrations on an annual basis.

    11.10. Micrometers and/or calipers shall be checked for accuracy before and after each use to a

    test block of a known thickness. These verifications will not be recorded.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 30 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    12. RECORDS RETENTION

    12.1. All documentation described in this manual is collated at the completion of the job, and

    reviewed for completeness, prior to preparation of the Manufacturer's Data Report.

    12.2. Manufacturer's Data Reports, upon certification by the QAM and AI, shall be furnished to

    the user or his agent, and to the Authorized Inspector if required.

    12.3. All documentation for the job shall be assembled into a Job Data Book. The original data

    book will be retained by the company and copies of which will be distributed to the client.

    12.4. Manufacturer Data Reports shall be retained for a minimum of five (5) years if not

    registered with the National Board.

    12.5. The National Board serial numbers shall be controlled and issued by the Project Manager.

    All pressure vessels will be stamped with the A.S.M.E. Code Symbol Stamp upon

    satisfactory completion.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 31 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    13. AUTHORIZED INSPECTOR

    13.1. The Authorized Inspector is the Inspector required by Code, who is employed by an

    ASME, accredited Authorized Inspection Agency.

    13.2. When requested by the Authorized inspector, hold witness and review points shall be

    identified on the checklist for those activities he wishes to witness and verify.

    13.3. The QC Inspector is the liaison with the Authorized Inspector, and is responsible for

    keeping him advised of the progress of the work.

    13.4. The Authorized Inspector shall have access to and be furnished with all drawings,

    calculations, specifications, procedures, repair procedures, records, test results and any

    other documents as required performing his duties.

    13.5. All non-conformance and corrective actions shall be submitted to the Authorized Inspector

    for his review.

    13.6. The QA Manager shall notify the Authorized Inspector sufficiently in advance of pressure

    tests so that he may be present to witness them.

    13.7. The final records, together with the completed Manufacturer's Data Report shall be

    submitted to the Authorized Inspector for his review and signature. The Authorized

    Inspector shall sign the Manufacturer's Data Report when he has satisfied himself that all

    Code requirements have been met.

    13.8. The QC Inspector shall provide a controlled copy of the Quality Manual for the Authorized

    Inspector at all times.

    13.9. The Authorized Inspector will review and accept all changes to the Quality manual prior to

    distribution to manual holders.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 32 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    13.10. The Authorized Inspector and/or the AI's Supervisor shall have free access to all parts of

    the Shops, suppliers or material manufacturers where work is being performed.

    13.11. The Authorized Inspector shall be responsible for his inspection requirements as ASME

    Section VIII Specifies.

    13.12. The QC Inspector will provide necessary assistance to the Authorized Inspector during

    the Annual Audit required by the National Board rules and regulations and ASME QAI-1.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 33 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    14. ANNUAL AUDIT

    14.1. An Annual Audit of the Quality Control System may be made by an independent person

    within Hardy Machine & Design, Inc., if deemed necessary by the QAM.

    14.2. The Audit shall verify implementation of the entire Quality Control System and report

    findings.

    14.3. Audit Reports are submitted to the Quality Assurance Manager for review and copies shall

    be forwarded to the affected department.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 34 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    15. CONTROL OF CODE STAMP

    15.1. The Hardy Machine & Design policy is to maintain control over the Code Symbol Stamp

    and to assure its proper use.

    15.2. Procedures

    15.2.1. The Code Symbol Stamp is controlled by the Quality Assurance Manager. All requests

    for the use of the Code symbol stamp shall be made directly to the Quality Assurance

    Manager.

    15.2.2. The Project Manager, prior to start of work, shall obtain from the client, and prepare from

    drawings and/or specifications, a list of the items or systems that will be required to be

    stamped and stamping to be witnessed by the Authorized Inspector.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 35 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    16. ORGANIZATIONAL CHART

    Kamgage Fabrication

    Company Secretary

    Design Engineers

    & CAD Drafting

    Estimating

    Technical/Sales

    QC Inspector

    QA Manager

    Procurement

    Project Managers

    NDE X-Rays

    Postweld Heat-treating

    Subcontractors Manager

    Shop Welders

    Shop Foreman

    Operating Officer

    President

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 36 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    17. NATIONAL BOARD OF REGISTRATION

    Items that require National Board numbers shall be issued in numerical order without skips

    or gaps by the QA Manager. The QA Manager shall maintain a record, which includes date

    of issue, type of item and manufacturers serial number, and date sent to National Board,

    which will be transmitted within 90 days of issuance.

    The QA Manager shall submit to the National Board the original and one legible copy of all

    Manufacturers Data Reports required for Code items. The arrangement of nameplate

    marking is indicated on Exhibit #11.

  • Hardy Machine & Design, Inc. February 23, 2004

    Quality Assurance Manual Page 37 of 47

    Printed copies of this manual are Uncontrolled Rev. 1

    Printed copies of this manual are Uncontrolled

    18. EXHIBITS

    EXHIBIT NO. 1: Q.C.S.M DISTRIBUTION LOG

    EXHIBIT NO. 2: Q.C.S.M. REVISION LOG

    EXHIBIT NO. 3: DRAWING TRANSMITTAL FORM

    EXHIBIT NO. 4: BILL OF MATERIAL

    EXHIBIT NO. 5: PURCHASE ORDER

    EXHIBIT NO. 6: MATERIAL EXAMINATION REPORT

    EXHIBIT NO. 7: INSPECTION TRAVELER SHEET

    EXHIBIT NO. 8: NON-CONFORMANCE REPORT

    EXHIBIT NO. 9: WELDERS PERFORMANCE RECORD

    EXHIBIT NO. 10: GAUGE CALIBRATION LOG

    EXHIBIT NO. 11: STAMPING ARRANGEMENT

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 1

    Q.C.S.M DISTRIBUTION LOG

    NUMBER ISSUED TO SIGNATURE TITLE DATE

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 2

    Q.C.S.M. REVISION LOG

    REVISON SUMMARY Q.C.M

    SIGNATURE & DATE

    A.I.

    SIGNATURE & DATE

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 3

    DRAWING TRANSMITTAL

    TO: _________________________________ WORK ORDER NO: ____________________

    ATTACHED ARE THE FOLLOWING:

    THESE ARE TRANSMITTED FOR:

    BY: _______________________________________________ DATE: __________________

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 4

    BILL OF MATERIALS

    DATE

    BILL OF MATERIALS NO.

    TO:

    QTY. DESCRIPTION UNIT

    WEIGHT

    TOTAL

    WEIGHT

    UNIT

    PRICE

    TOTAL

    PRICE

    Hardy Machine & Design

    5737 Windfern St.

    Houston, TX 77041

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 5

    PURCHASE ORDER

    ISSUE DATE PURCHASE ORDER NO.

    SUPPLIER: SHIP TO:

    Contact Phone : Contact

    Phone :

    Fax : Fax :

    REQD DELIVERY DATE SHIPPING METHOD TAXABLE PAYMENT TERMS SIGNATURE & DATE

    YES NO

    ITEM NO. DESCRIPTION QTY UNIT

    WEIGHT

    UNIT

    PRICE

    TOTAL

    PRICE

    TAX

    TOTAL

    5733 Windfern Rd.

    Houston, TX 77041

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 6

    MATERIAL EXAMINATION REPORT

    P.O.________________________________ SHOP ORDER____________________________

    ITEM NO.___________________________ DESCRIPTION___________________________

    CHECK LIST

    1. APPEARANCE: ______________________________________________________

    2. THICKNESS: ______________________________________________________

    3. DEFECTS: ______________________________________________________

    4. TRACEABILITY: ______________________________________________________

    5. HEAT NUMBERS: ______________________________________________________

    6. MATERIAL ID: ______________________________________________________

    7. DIMENSIONS: ______________________________________________________

    8. MISCELLANEOUS:_____________________________________________________

    MATERIAL RECEIVED BY: ________________________________ DATE: ___________

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 7-1

    Job Number:__________

    SECTION:

    INSPECTION TRAVELERS SHEET

    O.D. ________________ I.D. _______________

    VESSEL ____________ PIPE ______________ CUSTOMER/INSPECTO

    R Q.C. A.I.

    REMARKS

    *A.I. HOLD

    POINTS

    CALCULATIONS

    SERIAL NUMBER

    DRAWING NUMBER

    NATIONAL BOARD NUMBER

    DATA REPORT

    MILL TEST REPORTS

    SHELL THICKNESS

    HEAD THICKNESS

    FORMED SECTIONS

    HEAT NUMBER, SHELL

    HEAT NUMBER, HEAD

    GRADE OF MATERIAL, SHELL

    GRADE OF MATERIAL, HEAD

    CUT EDGES

    PIPE SURFACE

    PLATE SURFACE

    INSPECTION FITTINGS

    ALIGNMENT

    WELDING PROCEDURE

    WELDER QUALIFICATION

    WELDER SYMBOLS

    PREHEAT

    WELDING APPEARANCE

    POST WELD HEAT TREATMENT

    X-RAY, R-1, R-2, R-3, R-4

    MAGNA FLUX-DYE PENETRANT

    HYDRO TEST

    NAME PLATE, STAMPED OR ATTACHED

    TEST GAUGE NUMBER

    INTERIOR OR EXTERIOR COATING

    CUSTOMER ______________________________________ P.O. # __________ ITEM # _______

    SHIP TO: ______________________________________________________________________________

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 7-2

    JOB # CUSTOMER: DESCRIPTION:

    MATERIAL IDENTIFICATION

    ITEM HEAT NO. MNFR SLAB MIKE

    H-

    H-

    RG-1

    RG-2

    RG-3

    RG-4

    RG-5

    FLANGES AND COUPLINGS

    MK MFG MK MATL. MK MFG MK MATL.

    SPECIAL NOTES:

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 7-3

    JOB # CUSTOMER: DESCRIPTION:

    PART FUNCTIONS IN PROCESS FABRICATION & INSP.

    & L.O. PREP FORM FIT WELD X-RAY NDE

    ITEM QC AI QC AI QC AI QC AI QC AI QC AI QC AI

    SPECIAL NOTES:

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 8

    NONCONFORMANCE REPORTS

    WORK ORDER NO: REPORT NO.

    CUSTOMER:

    DESCRIPTION OF NONCONFORMITY:

    SIGNED: ___________________ QC INSPECTOR

    RECOMMENDED DISPOSITION

    USE-AS-IS REPAIR/REWORK SCRAP/RETURN TO VENDOR

    SIGNATURE & TITLE:

    DATE:

    DISPOSITION APPROVAL:

    DESIGN ENGINEER: DATE:

    Q.C. MANAGER: DATE:

    AUTHORIZED INSPECTOR: DATE:

    DISPOSITION VERIFIED:

    INSPECTED BY: DATE:

    AUTHORIZED INSPECTOR REVIEW:

    ACCEPTED

    REJECTED

    SIGNED: DATE:

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 9

    WELDERS PERFORMANCE RECORD

    DATE: ______________

    NAME: _______________________ STAMP NO.: ________________ YEAR: ___________

    CHECK THE MONTHS DURING WHICH THE WELDER WELDED UNDER THE

    FOLLOWING PROCEDURE:

    WPS _____________________________________

    PROCESS ________________________________

    JANUARY ______________ FEBRUAURY ___________ MARCH ____________

    APRIL ______________ MAY ___________ JUNE ____________

    JULY ______________ AUGUST ____________ SEPTEMBER ____________

    OCTOBER ______________ NOVEMBER ___________ DECEMBER ___________

    _____________________________

    PRODUCTION MANAGER

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 10

    GAUGE CALIBRATION LOG

    NAME OF EQUIPMENT______ MODEL NO. _______________ SERIAL NO. ________

    SIZE AND TYPE ____________ MANUFACTURER __________ ACCURACY ________

    DATE ACQUIRED __________ CALIBRATION FREQUENCY ______________________

    STATUS

    CALIBRATED RESULTS DATE CHECKED BY DATE DUE DATE

    MAINTENANCE HISTORY

  • Printed copies of this manual are Uncontrolled

    EXHIBIT NO. 11

    Stamping Requirements

    Facsimile of Required Stamping for National Board Registration

    Acceptable forms of National Board marking:

    NATL BD. NATL BD

    NATIONAL BD

    NATIONAL BOARD

    The size of the National Board stamping shall not be less than that required by the applicable

    code of construction for the item being stamped.

    National Board markings shall appear only on pressure retaining items registered with the

    National Board.

    * NATL BD. (National Board Serial Number)

    Stamping in this area shall comply with the requirements of the applicable