ENGLISH Parean Roadwork sluggish OLEH : XII PEMESINAN 1 ARIF SAEFULLAH as presenter ARIS KRISWANTO as answer question BAMBANG IRIANTO as answer question NOVSA TRISATYA W as answer question NURITA as moderator NUURWENDI as writer Presenting Report (We Stand Up For The Future) BAPERSHAT 4 Presenting

Transcript of presenting report bahasa inggris

Page 1: presenting report bahasa inggris

ENGLISH

“Parean Roadwork sluggish”

OLEH :

XII PEMESINAN 1

ARIF SAEFULLAH as presenter

ARIS KRISWANTO as answer question

BAMBANG IRIANTO as answer question

NOVSA TRISATYA W as answer question

NURITA as moderator

NUURWENDI as writer

SMK NEGERI 1 LOSARANG INDRAMAYUJalan Raya PanturaLosarangTelp. (0234) 507237 Losarang – IndramayuWebsite :www.smkn1losarang.sch.idE-mail : [email protected]

4

Presenting Report

Page 2: presenting report bahasa inggris

Perbaikan di Jalan Parean Dinilai Lambat

KANDANGHAUR – Perbaikan di jalan parean, Desa Kandanghaur,

dinilai lambat. Sampai sekarang, perbaikan jalan di desa Ilir dan desa bulak

masih belum terselesaikan. Jum’at (7/6). Badan pelaksana masih bekerja pada

pengaspalan pekerjaan jalan.

Beberapa pengendara motor berkata, lambatnya perbaikan jalan

berdampak pada kelancaran arus lalu lintas. Selain itu, pengerjaan paving

masih belum selesai dilakukan secara keseluruhan menimbulkan risiko

kecelakaan.

“kondisi jalan raya yang tidak mulus, sementara mengancam keselamatan

pengguna jalan terutama pengendara sepeda motor. Dari mulai dikeruk, saat ini

kondisinya masih tersisa. Setelah selesai pengaspalan tidak secara keseluruhan,”

Ucap Nurkholis (47), salah satu pengendara motor, Jum’at (7/6).

Perbaikan jalan di daerah Kandanghaur panjangnya sekitar dua kilometer.

Perbaikan dilakukan proses pengerukan pada lapisan aspal. Sekarang ini,

Paving baru selesai sekitar 50 persen.

“sudah hampir empat bulan perbaikan masih saja belum selesai. Sekarang

baru desa Ilir dan belum keseluruhannya. Saya fikir, perbaikan jalan lambat

karena perbaikan hanya mengganti lapisan aspalnya saja,” Ucap Santy (33).

Pengguna jalan yang sehari-hari melintasi perbaikan jalan tersebut.

4

Page 3: presenting report bahasa inggris

Parean Roadwork sluggish

KANDANGHAUR – Coast road improvements in the area Parean,

Districts Kandanghaur, considered slow. Untill now, road repair Ilir and Bulak

village have not yet been completed. Friday (7/6), implementing agency is still

working on asphalting of road works.

A number of riders say, the slow pace of road repairing work in the area

impacts on the smooth flow of traffic . Moreover, still not done woth the paving

of the overall risk of accidents.

“the road conditions are not smooth, while threatening the safety of road

users especially motorcyclist. From the strat of dredged, currently still left their

condition. When done asphalting not overall,” said Nurkholis (47), motorcyclist

to rader. Friday (7/6).

Road improvements in the area Kandanghaur length is about two

kilometers. Repairs are carried out dredging process on the asphalt layer.

Current, new paving completed about 50 percent.

“it has been almost four months of repairing not completed. Now just

recently Ilir village and still not whole. I think, the slow road repairs because the

repairs are replacing the asphalt layer only.” Said Santy (33). Road users who

daily cross the road repair.

4

Page 4: presenting report bahasa inggris

Question and Answer

Questions :

1. Dian Setiadi : what will you do if any accidents in the road ?

2. Sayful Alwi : how long normal roadwork in Parean ?

3. Mrs.Ratna : why road is broken ?

4. Rahmat Soleh : what the materials on the contruction to make roadwork, and how can

be a intternational roadway ?

5. Irfan Maulana : why the road is broken ?

6. Rudiman : what will we do when be pass Kandanghaur street to safety ?

Answered :

1. We will be saved the road, and we call the police and hospital for send an ambulance

for handle the accident. Before the police and ambulance come, we will give the

sacrivice a first aid for soften the injury

2. Is normally specifed by the implementing agency, but we already know that within

four months srill can not be resolved

3. (because the queastion charles from Mrs.Ratna (no.3) and Irfan (no.5) same, in charge

of one answer). Because the road can to see from asphalt quality. If asphalt quality is

low, so the road will always broke because through by way of a big cars untill the

road will broke. If the asphalt quality is high so the road can’t will broke.

4. The materials is : asphalt,various types of soil,land,grayel,and other supporting

materials. To become an international standard high way, should be good quality high

way, such a smooth way, there is no congestion on the road, in the inside street there

are many shady trees, and comfort on the highway for motorists.

6. We have to drive no too fast so could an accident. When the drive should focus on

street, must respect each other motorist do not preced each other. If posible there

should be police to secure the high way.