Presented by: Shri Bickyforth R. Marak Programme Manager, FFDA
description
Transcript of Presented by: Shri Bickyforth R. Marak Programme Manager, FFDA
Presented by: Shri Bickyforth R. MarakProgramme Manager, FFDA
BAGHMARA & RONGARA C&RD BLOCK
FIELD INSPECTION REPORT ON THE SCHEME IMPLEMENTED UNDER MEGHALAYA STATE AQUACULTURE MISSION THROUGH SPA (2010-11), VALUE
CHAIN (2010-11) & RKVY CORPUS FUND (2011-12), SOUTH GARO HILLS
SPA(2010-11)Special Plan Assistant scheme under Meghalaya State Aquaculture Mission was launched in the year 2012. 100
beneficiaries each from Baghmara and Rongara C&RD Block was selected for
fish pond construction under this scheme.
VALUE CHAIN MANAGEMENT(2010-11)
15 beneficiaries each from Baghmara and Rongara C&RD Block were selected for the Value Chain Management (2010-11) under Meghalaya State Aquaculture Mission. The training has been already given to the beneficiaries but the work order is still to be given to the farmers as the case still pending with concern
bank.
RKVY CORPUS FUND (2011-12)90 beneficiaries were selected from the
South Garo Hills for fish pond construction measuring an area of 0.1ha under RKVY
CORPUS FUND (2011-12), Meghalaya State Aquaculture Mission. The training to the farmers was given last week but the
work order cannot be issued to the farmers due to the implementation of
election code of conduct.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.1 Ha
Crest width 1.5M
Bottom width < 3 M
Slope 1:1
Depth 1-1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Smti. Kish Ch. Sangma
BAGHMARA BLOCK
Feedback: The beneficiary tell us that the sanction amount was not sufficient to construct the required 0.1 ha pond as the daily wages of the labour is higher than the estimated. She completed the construction with her own expenses. Fingerlings were stocked on July 2013.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.15 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth < 1 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Shri Omol M. Sangma
BAGHMARA BLOCK
Feedback: The beneficiary tell us that he uses his money to construct the pond measuring an area of 0.15ha. Low water table has a negative effect on fishes in the pond and the other concern that the beneficiary share is the poaching of fish. Fingerlings were stocked on July 2013.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.1 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth 1-1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Shri Henry B. Marak
BAGHMARA BLOCK
Feedback: The beneficiary finish the construction with his own expenses. Poaching has been a great problem in rearing of fish. Fingerlings were stocked on July 2013.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.08 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth 1-1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Smti. Sushilla B Marak
BAGHMARA BLOCK
Feedback: The beneficiary tell us that she uses her money to finish the construction of the pond measuring an area of 0.1ha. Low water table has a negative effect on the fish in the pond and the other concern which the beneficiary share is the poaching of fish. Fingerlings were stocked on July 2013.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.1 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth 1-1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Smti. Lucy B Marak
BAGHMARA BLOCK
Feedback: Finish the construction of required area 0f .1ha by her own expenses. She is expecting to do the first harvesting of fish from his pond by July 2014. Fingerlings were stocked on July 2013.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.12 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth 1-1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Smti. Marbina R Marak
BAGHMARA BLOCK
Feedback: The beneficiary tell us that she uses her money to finish the construction of the pond measuring an area of 0.1ha. The main concern that the beneficiary share is the poaching of fish. Fingerlings were stocked on July 2013.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.08 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth < 1 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Shri Anot Marak
RONGARA BLOCK
Feedback: The beneficiary tell us that he uses his money to finish the construction of the pond measuring an area of 0.08ha. Low water table has a negative effect on the fish in the pond.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.09 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth < 1 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Shri Benting Marak
RONGARA BLOCK
Feedback: He express his disappointment that sanction amount is not sufficient to construct the required 0.1ha. Low water table has a negative effect on fish culture. Fingerlings were stocked on July 2013.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.07 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth < 1 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Lemish Marak
RONGARA BLOCK
Feedback: She is happy with the department concern for helping them to better their livelihood by doing fish culture.
Name of scheme SPA
Area of the pond (constructed)
0.1 Ha
Actual area constructed 0.08 Ha
Crest width 1-1.5M
Bottom width < 3 M
Slope 1:1
Depth 1-1.5 M
Overflow pipe 4-5 inch
Drain pipe 4-6 inch
Shri Therak Sangma
RONGARA BLOCK
Feedback: The beneficiary tell us that he uses his money to finish the construction of the pond measuring an area of 0.1 ha. and thank the concern department for helping him to do fish culture. Low water table has a negative effect on fish culture.