PRESENTED BY

DIDDY RUSDIANSYAH A.D

(HEAD OF REGIONAL INVESTMENT AND PERMITTANCE BOARD OF EAST KALIMANTAN)

COAL MINING POTENCIES

IN EAST KALIMANTAN

BRIEF PROFILE OF EAST KALIMANTAN

Total area of Kalimantan Timur is

125.336,81 km square (or

12,726,752 hectares), consists of :

- 3 (three) Cities :

1. Samarinda

2. Balikpapan

3. Bontang

- 7 (seven) Regencies :

4. Kutai Kartanegara

5. Kutai Timur

6. Kutai Barat

7. Berau

8. Penajam Paser Utara

9. Paser

10. Mahakam Hullu

Its population up to 2014 is 3,508 million inhabitants, with the result that the average

population density is 26,14 inhabitants/km square

From geological point of view, East

Kalimantan is located in three

major tertiary sedimentary basins

which have major impact on the

process of mineral resources

formation in the region. The three

basins are :

Kutai Basin which covers the

area of Mahakam Hilir and

Mahakam Hulu.

Pasir Basin which covers the

area of Paser.

Tarakan Basin which covers

the area of Tarakan, Berau, and

Bulungan.

REGIONAL GEOLOGY .......

Coal Bearing Formations in

Kalimantan Timur are :

Balikpapan Formation

Pulaubalang Formation

Pamaluan Formation

Kuaro Formation

Wahau Formation

Batuayau Formation

Tanjung Formation

Warukin Formation

Telakai Formation

Birang Formation

Latih Formation

COAL BEARING FORMATION

COAL RESOURCES AND RESERVES IN EAST

KALIMANTAN IN 2012 – 2014

Coal Calorie 5000 up to 7000 Ccl and Sulphur 0,8 up to 1,5

Description 2012 2013 2014

Resources(MT)

31.817.269.817 32.258.774.367 30.651.444.628

Reserves(MT)

9.244.407.452 9.525.868.005 8.826.730.632

Note : Coal Resources and Reserves for 2014 only in the area of East

Kalimantan, excluding the area of North Kalimantan

COAL RESOURCES AND RESERVES IN EAST

KALIMANTAN IN 2015

NO REGENCY/CITY

RESOURCES RESERVES

INFERRED INDEXED MEASURED TOTAL ESTIMATED PROVEN TOTAL

1 SAMARINDA 331.185.099 267.828.597 154.989.788 754.003.484 48.249.074 140.678.674 188.927.748

2KUTAI

KARTANEGARA1.918.871.428 1.751.424.000 2.889.348.946 6.559.644.374 247.657.332 1.406.672.887 1.654.330.219

3PANAJAM

PASER UTARA0 9.067.682 1.007.520 10.075.202 0 7.922.311 7.922.311

4 PASER 363.472.020 646.338.610 248.257.078 1.258.067.708 182.775.400 576.787.640 759.563.040

5 KUTAI BARAT 826.226.133 640.781.169 931.010.716 2.398.018.018 65.238.769 256.697.062 321.935.831

6 KUTAI TIMUR 6.849.597.912 6.581.469.841 6.999.080.897 20.430.148.650 3.419.535.659 1.758.560.278 5.178.095.937

7 BERAU 738.005.610 1.093.377.488 563.205.213 2.394.588.311 356.593.000 246.014.331 602.607.331

TOTAL 11.027.358.202 10.990.287.387 11.786.900.158 33.804.545.747 4.320.049.234 4.393.333.183 8.713.382.417

COAL MINING

MANAGEMENT POLICIES IN

EAST KALIMANTAN

THE IMPLICATION OF THE ENACTMENT OF THE LAW NO.

23 OF 2014 ON LOCAL GOVERNMENT (UNDANG-UNDANG

N0. 23 TAHUN 2014 TENTANG PEMERINTAHAN DAERAH)

Government affairs

implementation on

mineral and coal mining

sector is divided

between the central

government and the

provincial government

This means the

implementation is no

longer under the

authority of the

city/regency (since

October 2, 2014)

Central Government Authorities1. Mining Permit (Izin Usaha Pertambangan/

IUP) Issuance for metallic minerals, nonmetallic minerals, coal, and rock in :

Mining Permit Areas (Wilayah Izin UsahaPertambangan (WIUP)) which arelocated within the area of inter-province

Mining Permit Areas which directlyborders with other countries

Mining Permit Areas which are located inthe sea area of more than 12 miles

2. The issuance of the Mining Permit in theForeign Direct Investment

3. The issuance of a Special Permit of Mineraland Coal Mining

Cont ..... PROVINCIAL

GOVERNMENT AUTHORITIES1. Mining Permit Issuance for metallic minerals,

non metallic minerals, coal, and rock fordomestic investment in :

Mining Permit Areas in areas located withinthe province

Mining Permit Areas in the sea area lessthan 12 miles

2. Community Mining Permit Issuance for metallicminerals, non metallic minerals, coal, and rockcommodities within the community mining area

THE FOLLOW UP OF THE IMPLEMENTATION

OF THE LAW NO. 23 OF 2014 .......1. Governer is authorized to revoke the non CnC Mining Permit which doesn’t

meet the obligations (for technical reference : Minister of Energy & MineralResources Regulation No. 43 of 2015 on Procedures for Mineral & CoalMining Permit Issuance Evaluation (Peraturan Menteri Energi &Sumberdaya Mineral No. 43 Tahun 2015 tentang Tata Cara EvaluasiPenerbitan IUP Mineral & Batu Bara))

2. Regent/Mayor submits the Mining Permit and the supporting documents tothe Governor

3. Regent/Mayor/Governor submits the Foreign Investment Mining Permit andthe supporting documents to the Central Government

4. Provincial Governments establish One Stop Services (OSS (PelayananTerpadu Satu Pintu (PTSP)) and umbrella permittance law

5. Governor may establish Technical Service Unit (Unit Pelayanan Teknis) inthe Regency/City for the implementation of the guidance and supervision,including increase the Information & Technology functional staff as well asstrengthen the mining database

6. Completion of administrative boundaries between the Regencies/Cities

COAL MINING MANAGEMENTApplied based on national regulations, to be specific :

Law No. 4 of 2009 on Mineral and Coal (Undang-Undang No. 4 Tahun 2009

tentang Pertambangan Mineral & Batu Bara)

Government Regulation No. 77 of 2014 on 3rd Amendment to Government

Regulation No. 23 of 2010 on the Implementation of Mineral & Coal Mining

Operations (Peraturan Pemerintah No. 77 Tahun 2014 tentang Perubahan Ke-3

Atas Peraturan Pemerintah No. 23 Tahun 2010 tentang Pelaksanaan Kegiatan

Usaha Pertambangan Mineral & Batu Bara)

Minister of Energy and Mineral Resources Regulation No. 32 of 2013 on

Procedures for Granting Special Permits on Mineral & Coal Mining (Peraturan

Menteri Energi & Sumberdaya Mineral No. 32 Tahun 2013 tentang Tata Cara

Pemberian Izin Khusus Dibidang Pertambangan Mineral & Batu Bara)

At provincial level (East Kalimantan) applied the East Kalimantan Governer Regulation

No. 17 of 2015 on Management of Permittance and Non Permittance Granting and

Improvement of Permittance Management on Mining, Forestry & Palm Oil

Plantation in East Kalimantan (Peraturan Gubernur Kalimatan Timur No. 17 Tahun

2015 tentang Penataan Pemberian Izin dan Non Perizinan serta Penyempurnaan

Tata Kelola Perizinan Di Sektor Pertambangan, Kehutanan & Perkebunan Kelapa

Sawit Di Provinsi Kalimantan Timur)

1. Create resource management policy

harmonization between the Central

and Provincial Government

2. Evaluate policies which have been

issued against the benefit and impact

of natural resource management

3. Provide protection against

environmental pollution and damage,

particularly forest and its ecosystem

4. Encourage entrepreneurs/investors

and other stakeholders’s compliance

on the obligations

Governer Regulation No. 17 of 2015

(Peraturan Gubernur No. 17/2015)

Accommodate

sectoral rules

Accommodate

social, economic

and

environmental

aspects

THE SCOPE OF PERMITTANCE AND NON

PERMITTANCE MANAGEMENT (Article 5,

Paragraph (2))

MINING FORESTRY

Permittance Issuance (Mining Permit/ Izin Usaha Pertambangan (IUP)) –Exploration (IUP Exp) and Operation (IUP OP)

IUP Exp & IUP OP Issuance by Regency/City

Borrow and Use of Forest Areas Permit Recommendation (Rekomendasi Izin Pinjam Pakai Kawasan Hutan (IPPKH))

Timber Forest – Natural Forest/Limited Forest Product Utilization Permit (Izin Usaha Pemanfaatan Hasil Hutan Kayu -Hutan Alam/ Hutan Terbatas (IUPHHK-HA/HT))

Forest Area Exchange Recommendation

MANAGEMENT OF PERMITTANCE AND NON

PERMITTANCE GRANTING AND IMPROVEMENT

OF PERMITTANCE MANAGEMENT ON COAL

MINING SECTOR (Article 6)

1. Postponement and management of permittancegranting are applied for the new permittance (valid in 2years since the issuance of the Governor Regulation -Article 10)

2. Penundaan dimaksud dikecualikan untuk :

Permittance for exploration activities which arealready underway

Enhancement of Exploration Mining Permit intoProduction Operation Mining Permit in the area ofOther Use Areas (Areal Penggunaan Lainnya (APL))and production forest area

Extension of Production Operation Mining Permit

Cont .....3. Enhancement and extension of the permittance and non permittance as

explained in the explanation number 2 above can be granted as long as the

requirements are fulfilled, to be spesific :

Committed to fulfil the Domestic Market Obligation, especially in the scope

of East Kalimantan

Committed to provide supplies or build power plants

Committed to support the food security program (reclamation for crops

and cattle)

Should not overlap with similar commodities permittances

Headquartered (at least has a branch office) and has an enterprises

Taxpayer Identification Number (TIN/Nomor Pokok Wajib Pajak (NPWP))

in the area of East Kalimantan

Pay attention to the carrying capacity of the environment and local

communities

Should not export raw material

Build downstream industries

4. The commitment is part of the Minutes after the presentation of the permit

applicant before the Governer (or authorized officials), and set forth in a

Statement

The issuance of new permittance and permittance extension

of NON METALLIC MINERAL AND ROCK (Article 6

Paragraph 6 Governor Regulation No. 17 of 2015 (Pasal 6

Ayat 6 Peraturan Gubernur No. 17 Tahun 2015))

The implementation can be referred to the GOVERNER OF

EAST KALIMANTAN REGULATION NO. 4 OF 2015 ON

GUIDANCE OF NON METALLIC MINERAL AND ROCK

MINING PERMIT IMPLEMENTATION (PERATURAN

GUBERNUR KALIMANTAN TIMUR NO. 4 TAHUN 2015

TENTANG PEDOMAN PELAKSANAAN IZIN USAHA

PERTAMBANGAN MINERAL BUKAN LOGAM & BATUAN

DI PROVINSI KALTIM)

PROCEDURES OF COAL

MINING PERMITTANCE IN

EAST KALIMANTAN

PROVINCE

PERMITTANCE PROCEDURES ....

Its implementation is based on

the Governor of East

Kalimantan Regulation No. 48

of 2015 on the Implementation

of One Stop Services (OSS)

With reference to Presidential

Decree No. 97 of 2014 on One

Stop Services (OSS)

INVESTMENT PRINCIPLE PERMIT

Head of Investment CoordinatingBoard Regulation No. 14 of 2015on Guidances and Procedures forInvestment (Peraturan KepalaBadan Koordinasi PenanamanModal No. 14 Tahun 2015 tentangPedoman & Tata CaraPenanaman Modal) - first step toconduct business (Article 9)published by BKPM/BPMPTSP orPTSP KPBPB & PTSP KEK (theauthority of permit granting isstipulated in Article 5, 6, 7 & 8)

Principle permit serves as areference to the issuance ofinvestment implementationpermittance and nonpermittance under the authorityof the Central and ProvincialGovernment (Article 10paragraph (3) and (4))

Principle Permit for ForeignInvestment is only granted tobusiness entities in the form ofa Limited Liability Company(LLC/Perseroan Terbatas (PT)),with the investment value morethan Rp 10 billion and thecapital is paid at least Rp 2.5billion (Article 13)

Investment implementation Permittance & Non

Permittance (Article 10, paragraph (4)), among

others include :

1. Land Technical Considerations

2. Location Permit

3. Building Permit

4. Ratification of the Use of Foreign Workers Plan

(Rencana Penggunaan Tenaga Kerja Asing (RPTKA))

5. Environmental Permit

6. Facility Decree

7. Technical Recommendation

8. Operation Worthy Certificate; or

9. Operational Permit

PROCEDURES OF COAL MINING PERMITTANCE

& NON PERMITTANCE ... Brief

Filing an Application to Investment and One Stop Services (OSS) Board (BPMPTSP)

Documents Verification

Incomplete Rejected

Complete

Processed (Submitted to Department of Mines and Energy of East Kalimantan (Dinas Pertambangan dan

Energi Provinsi Kalimantan Timur))

Technical Considerations

Not Recommended

RecommendedTeam Meeting (Presentation)

Disapproved

Approved

Permit Issuance

1

23

REQUIREMENTS FOR EXPLORATION

MINING PERMIT

ADMINISTRATIVE TECHNICAL

Application Letter

Structure of Directors & List of

Share Proxy Holders

Certificate of Domicile

Letter of Assignment/Power of

Attorney (Original)

Copies of Exploration Mining

Permit from beginning to end

(legalized)

Copies of Exploration Mining

Permit CnC

Taxpayer Identification Number

(TIN)

Resume & Mining Expert

Statement

Maps of Mining Permit Area

which is equipped with

coordinates

Cont .... REQUIREMENTS FOR

EXPLORATION MINING PERMIT

ENVIRONTMENTAL FINANCIAL

Statement of Capability to

comply with the environmental

management regulations

Proof of sooth guarantees

placement

Proof of payment of the

compensation value price of

Mining Permit Area auction

result information data or

proof of area reserves cost

REQUIREMENTS FOR PRODUCTION

OPERATION MINING PERMIT

ADMINISTRATIVE TECHNICAL

Application Letter

Structure of Directors & Listof Share Proxy Holders

Certificate of Domicile

Letter of Assignment/Powerof Attorney (Original)

Copies of Production OperationMining Permit from beginningto end (legalized)

Copies of Production OperationMining Permit CnC

Taxpayer Identification Number(TIN)

Map of Mining Permit Area whichis equipped with coordinates

Full Report of Exploration

Report of Feasibility Study

Plan of Exploration Reclamation& Guarantee Placement

Work Plan & Budget

Plan of Production OperationSupporting InfrastructureDevelopment

Availability of Mining Experts(with 3 years minimumexperience)

Cont .... REQUIREMENTS FOR

PRODUCTION OPERATION MINING

PERMIT

ENVIRONTMENTAL FINANSIAL

Statement of Capability to comply

with the environmental

management regulations

Approval Letter of Environmental

Document/ Environmental Permit

(EIA/ UKL - UPL/ SPPL/ Surat

Persetujuan Dokumen Lingkungan

Hidup/ Izin Lingkungan (AMDAL/

UKL - UPL/ SPPL))

Audited-last year Financial

Statements

Proof of the last 3 years Fixed

Dues Payment

Proof of investment substitute

payment in accordance with the

bidding value for the winner of

Mining Permit Area

THE DEVELOPMENTS OF

COAL MINING PERMITS IN

EAST KALIMANTAN

THE NUMBER OF COAL AND OTHER MINERALS MINING PERMITS IN

EAST KALIMANTAN

No Prov/Regency/

City

Exploration Production Operation Total

Total Area (Ha) Total Area (Ha) Total Area (Ha)

I

COAL

MINING

PERMITS

1.1 Province --- - 2 4.081 2 4.081,00

1.2 Paser 40 102.553,71 37 27.970 77 130.523,57

1.3Penajam

Paser Utara59 110.229,32 46 71.374 105 181.603,80

1.4 Samarinda 0 - 53 26.000 53 26.000,25

1.5 Kutai Timur 102 840.003,00 29 219.686 131 1.059.689,02

Data Source : December 2015

Cont .....

No Prov/Regency/

City

Exploration Production Operation Total

Total Area (Ha) Total Area (Ha) Total Area (Ha)

1.6Kutai

Kartanegara194 466.878,62 194 248.258 388 715.136,59

1.7 Kutai Barat 50 303.797,00 68 292.975 118 596.772,00

1.8 Berau 64 187.571,60 21 62.977 85 250.548,73

Total of Mining

Permits509 2.011.033,25 450 53.321,71 959 2.964.354,96

IITotal of

PKP2B7 251.490,00 23 754.649,63 30 1.006.139,63

IIIOTHER

MINERALSMetallic Mineral, Non Metallic Mineral, and Rock 1.256.640,95

TOTAL (I + II + III) 989 5.227.135,54

Data Source : December 2015

TOTAL OF CNC COAL MINING PERMITS (IUP) & PKP2B IN EAST

KALIMANTAN

No. Prov/Regency/City

S t a t u s

CNC Area Non CNC Area

1 EAST KALIMANTAN 2

Production

Operation Mining

Permits :

1.361.030,23

Exploration

Mining Permits :

1.603.325,47

PKP2B :

1.006.139,63I

--

132 PASER 64

23PENAJAM PASER

UTARA 103

4 SAMARINDA 521

5 KUTAI TIMUR 4784

6KUTAI

KARTANEGARA 313

75

7 KUTAI BARAT 10018

8 BERAU 70 15

TOTAL 751 3.970.494,87 208 1.256.640,67

Data Source : December 2015

COAL PRODUCTION DATA OF SURFACE MINING

UP TO NOVEMBER 2015

Province/Regency

/City

2012

(Ton)

2013

(Ton)

2014

(Ton)

2015

(Ton)

PKP2B 157.505.476,42 172.437.465,66 167.042.763,09 128.036.681,79

East Kalimantan 1.408.672 1.387.788 892.213,05 600.514,64

Paser 1.233.421 2.232.564 669.229,20 313.504,30

Penajam Paser

Utara636.421,66 1.587.092,84 1.206.281,87 527.136,72

Samarinda 11.327.858,64 9.847.170,47 5.925.160,91 4.728.904,59

Kutai Timur 2.420.551 2.592.462 1.919.747 1.902.477,00

Kutai

Kartanegara38.146.600,94 55.534.330,76 56.220.172,08 41.862.105,42

Cont .....

Province/Regency

/City2012

(Ton)

2013

(Ton)

2014

(Ton)

2015

(Ton)

Kutai Barat 3.211.180,12 3.056.421,89 1.055.863,54 643.638,83

Berau 6.438.223,88 9.051.449,42 7.147.364,23 10.143.230,77

Total 222.330.417,66 256.340.970,04 242.120.677,97 188.758.194,06

Data Source : December 2015

GROUND DISTURBANCE, RECLAMATION AND REVEGETATION

LAND DATA UP TO 2014

NoProvince/Regency/

City

Concession Area

of Production

Operation (Ha)

Ground

Disturbance

Area (Ha)

Reclamation

Land Area

(Ha)

Revegetation Land

Area (Ha)

ICOAL MINING

PERMITS

1 East Kalimantan 4.081,00 1.679,25 1.213,45 908,59

2 Paser 27.217,86 1.644,07 615,70 461,32

3Penajam Paser

Utara71.374,48

118,70 48,00 30,40

4 Samarinda 26.000,25 558,19

196,07 194,00

5 Kutai Timur 195.126,02 459,71

147,07 147,07

6 Kutai Kartanegara 245.867,59 22.604,38 5.070,88 5.070,88

7 Kutai Barat 292.975,00 1.292,80 220,52 165,28

Cont ......

NoProvince/Regency/

City

Concession Area

of Production

Operation (Ha)

Ground

Disturbance

Area (Ha)

Reclamation

Land Area (Ha)

Revegetation Land

Area (Ha)

8 Berau 62.977,13 1.281,72 640,00 410,70

9 Bontang - - - -

10 Balikpapan - - - -

Total of Mining Permits 925.619,33 29.638,82 8.151,69 7.388,24

II PKP2B 698.415,63 73.433,98 33.389,89 30.561,78

T o t a l ( I + II ) 1.624.034,96 103.072,80 41.541,58 37.950,02

Data Source : December 2015

MINING CONDITIONS IN 2015

Province/Regency/

City

Total of Mining Permit Concession Area (Ha)

Exploration Production

OperationExploration

Production

Operation

Province - 2 - 4.081

Berau 64 21 187.572 62.977

Bontang - - - -

Samarinda - 53 - 26.000

Balikpapan - - - -

Kutai

Kartanegara 194 194 435.289 248.258

Kutai Timur 102 29 840.003 219.686

Kutai Barat 50 68 303.797 292.975

Penajam Paser

Utara 59 46 110.229 71.374

Paser 40 37 102.554 27.970 Total of Mining

Permits (1) 509 450 1.979.444 953.321

PKP2B (2) 7 21 300.350 698.416

T o t a l (1+2) 516 471 2.279.794 1.651.737 Data Source : December 2015

MINING PERMIT CONDITIONS IN 2015 AND ESTIMATION IN 2035

Regency/CityGround

Disturbance

Area (Ha)

Reclamation

Land Area (Ha)

Revegetation

Land Area (Ha)

Total of Mining

Permits After

2035

Mining Permits

Concession Area

After 2035 (Ha)

Province 1.679,25 1.213,45 908,59 2 4.081

Berau 1.281,72 640 410,7 85 229.146

Bontang - - - - -

Samarinda 558,19 196,07 194 59 25.613

Balikpapan - - - - -

Kutai

Kartanegara 22.604,38 5.070,88 5.070,8898

215.913

Kutai Timur 459,71 147,07 147,07 108 871.268

Kutai Barat 1.292,80 220,52 165,28 54 289.068

Penajam Paser

Utara 118,7 48 30,416

24.565

Paser 1.644,07 615,7 461,32 20 27.611

Total (1) 29.638,82 8.151,69 7.388,24 442 1.687.264,31

PKP2B (2) 73.433,98 33.389,89 30.561,78 28 998.765,63

Total (1+2) 103.073 41.542 37.950 470 2.686.030

Data Source : December 2015

NoProvince/Regency/

City

Amount of Guarantee

Rp USD

1 East Kalimantan 12.531.166.365,00 -

2 Paser 14.234.127.190,01 -

3 Penajam Paser Utara 4.699.132.018,20 -

4 Samarinda 226.277.339.967,21 -

5 Kutai Timur 11.366.364.672,00 14.718,36

6 Kutai Kartanegara 649.008.362.543,08 -

7 Kutai Barat 42.513.232.338,90 -

8 Berau 21.601.272.121,07 -

T o t a l 982.230.997.215,47 14.718,36

RECLAMATION GUARANTEE

Data Source : December 2015

No.Province/Regency/

City

Amount

Rp USD

1 East Kalimantan 3.742.473.331,00 -

2 Paser 1.970.858.966,57 -

3 Penajam Paser Utara 2.585.192.747,00 -

4 Samarinda 41.857.472.437,80 -

5 Kutai Timur 1.164.001.572,00 -

6 Kutai Kartanegara 40.107.669.425,87 542.667,01

7 Kutai Barat 5.941.212.323,63 -

8 Berau - -

T o t a l 97.368.880.803,87 542.667,01

POST-MINE GUARANTEE

Data Source : December 2015