Presented by: Chantelle Phillips HellermannTyton SA Engineering 19 July 2018 GEM INNOVATE COLLABORATE STANDARDIZE

Transcript of Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing...

Page 1: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

P r e s e n t e d b y : C h a n t e l l e P h i l l i p s H e l l e r m a n n Ty t o n S A E n g i n e e r i n g

1 9 J u l y 2 0 1 8

GEM INNOVATE • COLLABORATE • STANDARDIZE

Page 2: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

HellermannTyton South Africa is a subsidiary of the HellermannTyton Group which has operations globally in 37 countries, employs over 4000 people and generates revenue in excess of 700 million Euro We have also part of the international design & innovation team (Only 5/37) – Germany, France, UK, USA and now SA Product Design, Development and Manufacturing is a key focus and the local facility utilising state-of-the-art CNC machines, plastic injection moulding machines, extrusion machines and printing equipment to produce world class products in compliance with international quality standards

DRIVEN BY HTSA ENGINEERING TEAM

Page 3: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

GLOBAL PLAYERS

December 2015 taken over by Delphi automotive – Headquartered in UK, it is on of the world‘s largest automotive parts manufacturers

A Web-based Product Data Management (PDM) system that supports geographically dispersed teams while managing critical processes such as content, change and configuration management. This allows you to create and manage product structure views such as “As-Designed” and “As-Planned,” thereby optimizing configuration management. Features and Benefits Global access — Enables Web-based access to a current product data management repository Seamless connections — Enables access to multiple mechanical/electrical CAD applications, embedded software tools, desktop applications and ERP systems Prevents design errors — Controls and automates product development processes, improving quality and reliability Improved innovation — Facilitates rapid development of new products with powerful configurations tools Complete integration

Page 4: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

Head office facility

Head Office – Linbro Business Park

- Site – 22,000 m² - Offices – 2,800 m² - Manufacturing – 4,700 m² - Warehousing & Logistics – 5,600 m²

Page 5: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

Experience & Expertise

Our local engineering staff have been involved in the tooling & plastic injection mould manufacturing in the Automotive industry for over 40 years

Merged with HellermannTyton in 2015

HTSA Engineering is committed to continual improvement as a basic philosophy for achieving competitive and efficient manufacturing of world class products

The ability to draw on HellermannTyton Group’s world-renowned experience in the innovative

design, development and manufacture of specialised plastic parts, gained over numerous years of successful operation around the globe

Page 6: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

Tool Room Equipment

State-of-the-Art Precision Engineering Equipment 2 x NC Spark Eroders 2 x CNC Spark Eroders 1 x Wire Cutter 3 x 3 Axis CNC Milling Machines 1x 4½ Axis CNC Milling Machine 2 x Surface Grinders 2 x CNC Lathes 2 x Heat Treatment Furnace 1 x Mechanical Saw 4 x Pedestal Drilling Machines 4 x Conventional Milling Machines 1 x Conventional Lathe 1 x Hardness Tester

Page 7: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

Tooling Capability

Small to Medium size tooling (up to 3 tons); Plastic injection moulds; Sheet metal progression tooling; High pressured aluminium die cast moulds; Jigs and checking fixtures; Special purpose machinery; Prototyping; Product design and development; Tool Design & Manufacturing Process/Assembly line design All types of tooling Manufacturing efficiency improvements Technical Consulting & assistance CAD/CAM DESIGN & CNC SYSTEM

SOFTWARE: Creo Solidworks 2017 Mastercam 2018

Page 8: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

CONDITION for industry to place orders on SA

1. Contract with Full Service Provider ‒ Project Management - One face to Client

2. Tool Design (Right first time) 3. Delivery (Lead times, commitment dates) 4. Cost (Internationally Competitive) 5. Quality (Internationally competitive) 6. Manufacturing / Volume Capacity

Page 9: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

Concept

Simulation

Design Review

Identify critical areas

CAD & 2D conversion

Distribute Commission,

PPAP, Handover

Clustering - process flow

PM Timing Cost Mng Risk Mng Metrology Reporting

Trails & Optimisation Trails & Optimisation

Page 10: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

RFQ

• Based on customer specific requirements • Based on tool manufacturing standards – International Automotive • Fully broken down package with all tool systems • NDA’s & Manufacturing agreements

Page 11: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

Trimming tools Mechanical/Hydraulic Orientation Cavities Post processing Machining Jigs Flow analysis Core pulling

Fixture type: Pneumatic Mechanical Component sensing modules

Hot Runner Mould flow analysis Core pulling Semi/Full automatic Post processing Assembly Orientation of com- ponents and cavities

Tool line-up Blanking tools Forming tools Progressive tools

SHEETMETAL PLASTICS JIGS & FIXTURES

ALUMINIUM CASTINGS

Concept – tooling type (Exactly how the tool will work) – conceptual design of mould

Fixture type: Pneumatic Mechanical Component sensing modules

Hot Runner Mould flow analysis Core pulling Semi/Full automatic Post processing Assembly Orientation of com- ponents and cavities

Fixture type: Pneumatic Mechanical Component sensing modules

Hot Runner Mould flow analysis Core pulling Semi/Full automatic Post processing Assembly Orientation of com- ponents and cavities

Page 12: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

SIMULATION

• Mould flow analysis • Prototyping • DFM

Page 13: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

DESIGN REVIEW

Customer Designers (Selected board) Process Engineer SQA Engineer APQP process followed from project kick off (Advanced Quality Prod planning) Identification of critical areas and allow for optimisation in design Could have numerous design reviews for downstream processes

Page 14: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

MOULD/TOOL DESIGN 2D DRAWINGS SPECIFYING TOLERANCES & SPECIFICATIONS

• 2D drawings to be prepared with tolerances • Include full process instruction, materials to be used, stress relieving etc • Full metrology report

• Distribution of work amongst toolmakers

Page 15: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

CLUSTER MANAGEMENT

• Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality Systems & Processing requirements • Assist with ISO 9001 implementation • Metrology of critical sizes • Upskilling – get all to work the same • Supplier development • Report management – Design review team

Page 16: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

CLUSTER MANAGEMENT

Page 17: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

MANUFACTURE

Facilities will be audited to work to quality standards that comply with Automotive requirements Processes to be monitored Timing plans to be updated and communicated to customer with visual reports

Page 18: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

Visual Progress Reporting – Example 1

Page 19: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

TOOL TRAILS & OPTIMISATION

This will happen at nominated toolmaker/1st tier supplier for part trails & provide 1st set of parts for measurement and fitment Every project will accommodate for at least 2 loops of optimisation to allow 100% dimensional accuracy still within required timing

COMMISSIONING & HANDOVER • Process Engineers to ensure optimum production parameters set and process is constant • Dimensional reports on product • Allow easy fault finding after commissioning if problem found with mould (Processing

parameters, tool inspection or material issues) • Critical component list (spares) to be supplied (Hot runner elements, thermocouple, ejector pins

etc) • Maintenance

Page 20: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

IMPACT (VALUE)

Economic Growth Localisation Job Creation Job retention Growing of industry Upskilling industry Local toolmaking support for OEM’s

Page 21: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

SUCCESSES – MBSA BRACKET TOOL LOCALISTION

Page 22: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

22

Mercedes Benz (Cable Duct Inner RH & LH)

New 1st Tear supply to MBSA In-house mould design & Manufacture Collaboration – UTP – fastrack mould manufacture with advanced machined mould

base Vehicle fitment for jig (Poke yoke) Limit switch activation on assembly of pin – clamps & locks part in place Parts move down the shoot and are packaged accordingly All on one line assembly

Page 23: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

SUCCESSES – MBSA BRACKET TOOL LOCALISTION

Page 24: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

TOOL 3D MEAUREMENT REPORT - UTP

Page 25: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

PART 3D MEAUREMENT REPORT

Page 26: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

RESULT

• World-class timing (12 weeks) • World-class quality (Through hardened) • World-class Costs • Cluster collaboration & Management • Localisation (APDP benefits) • Job creation

Page 27: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

NEXT STEPS

Create Volume Capacity Pool knowledge Supplier Audits

Page 28: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

AUDIT – NEW STANDARD

Design capabilities Machining capabilities Project Management (delivery times) Costing structures Machining processes Machine maintenance – e.g Backlash checked on machines Quality management – dimensional reports of previous projects Management system Internal go/no go processes

Page 29: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

29

New Export moulds for HTG – Production Poland

1st Project with HTG

NOW: Exporting moulds for group

Page 30: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

30

After 1st project with HTG

Over 40 projects quoted. 8 orders received since February 2018 – further 7 PO’s in progress Capacity planning being conducted to grow local capacity Money stays in the group Over R 300 million quoted in tooling

Page 31: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

31

Current project & Collaboration – Clustering UTP

NOW: Exporting moulds for group in production

Page 32: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

32

With industry’s support output has doubled

In progress

Page 33: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

33

Page 34: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

34

Advanced machined Custom mould in parallel production

Page 35: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

35

Fast track turnaround times

Page 36: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

INNOVATE • COLLABORATE • STANDARDIZE GEM

36

Growing capacity

Group benefits by production in SA

Clustering of local toolmakers – finishing capabilities Designs to remain with HTSA Engineering Project Management to stay within HTSA Engineering Increase volume capacity Single face to the customer Supplier development & Upskilling Local incentives Local content kickbacks for OEMs

WORKING TOGETHER WE CAN MAKE A DIFFERENCE!!!

Current annual South African tooling market worth R18 billion Only 12% produced locally

Page 37: Presented by: Chantelle Phillips HellermannTyton SA ... · • Project Management • Timing Management • Cost Management • Risk Management • Full understanding of all Quality

ANY QUESTIONS?

THANK YOU