Major project development in the Framework of CF and ERDF funds
JASPERS - a technical support facility
Presented at an InterAct Danube Region Strategyworkshop on 17 March 2010 in Bratislava
Prepared byJASPERS Regional Office for
Central Europe, Vienna
![Page 2: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/2.jpg)
Joint Assistance to Support Projects in European Regions
European Commission
European Investment Bank
European Bank for Regional Development
KfW – Kreditanstalt für Wiederaufbau
JASPERS
![Page 3: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/3.jpg)
3
JASPERS Objectives
Building up the sector capacity to prepare and implement projects
Sustainable sector development Full absorption of EU funds Fulfillment of EU requirements Application of international standards Project preparation Project Application Project Application decisional procedure
JASPERS
![Page 4: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/4.jpg)
4
DG REGIO
Final Beneficiaries
various administrations
NGOs, chambers,
lobbyists, etc.IB
Managing Authority
DG ENVDG MOVE
various DGs
Lobbyists
JASPERS
1. Project/Programme
![Page 5: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/5.jpg)
5
-1.000.000.000
0
1.000.000.000
2.000.000.000
3.000.000.000
4.000.000.000
5.000.000.000
6.000.000.000
7.000.000.000
Performance requirements OP Transport 2007HU162PO007ERDF + CF
€ Critical stages
Commitment Schedule
Critical P ath 1500 Mio €
1500 Mio €
1500 Mio €
1400 Mio €
1. Project/Programme
2010
![Page 6: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/6.jpg)
Major Projects (above EUR 50/25 Mio)
Standard project information to be provided to the COM project description
Project description Project feasibility (option analysis) Project status (project maturity) CBA - Economic Analysis and Financial Analysis
including funding gap calculation Documentation on Environmental impact Public participation Competition (State Aid) Financing Plan - Grant calculation (based on funding gap calculation) etc.
Project
![Page 7: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/7.jpg)
7
Project
Pre-feasibility
Feasibility
General Design - Permits
EIA
Detailed Design - Permits
Tendering - Contracting
Implementation
Tender Design
Operation
ProjectApplication
Feasibility studyCBA
CBA
![Page 8: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/8.jpg)
8
Project
Project idea
Option A Option B Option C Option D
Option A1 Option C1
Option C11 Option C12
Option C111 Option C112
The decisional tree
![Page 9: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/9.jpg)
9
Project
Project Feasibility
1. Assessment of the Situation
2. Definition of Objectives
3. Development of Alternatives
4. Assessment of Alternatives
5. Development of Options
6. Assessment of Options
7. Economic Feasibility
8. Financial Feasibility
9. Project Financing CBA
MCA
![Page 10: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/10.jpg)
10
Project
Why do PAs/projects get problems
1. Environmental aspects (EIA, SEA, NATURA 2000)
2. Procurement3. Decisional tree4. Project justification – CBA5. Project definition6. State Aid 7. Project maturity8. Implementation problems
![Page 11: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/11.jpg)
11
Project
Screening Scoping Environmental report – Non-technical summary Announcements Consultations (public and authorities, cross border) Summary of the procedure Mitigation measures, monitoring,
compensation measures
EIA Procedure - Checklist
![Page 12: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/12.jpg)
12
Project
Often not covered by respective EIA procedure
Areas pre-defined Screening (implementation and operational phase) Mitigation measures Monitoring
NATURA 2000
![Page 13: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/13.jpg)
Procurement
Project
Use of standard procedures, avoid exemptions
Support competition
Transparency of decisions
![Page 14: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/14.jpg)
14
Danube Region
![Page 15: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/15.jpg)
15
Danube Region
Improvement of the navigability of river Danube Rivers and Ports HUNGARY
RORIS II - Danube VTMIS - Danube Rivers and Ports ROMANIA
RORIS II - Danube VTMIS - Canals Rivers and Ports ROMANIA
Waste collection system - depolluting vessels on Danube Sulina-Braila Rivers and Ports ROMANIA
Waste collection system - depolluting vessels on Danube Harsova - Bazias Rivers and Ports ROMANIA
Development of Public infrastructure in Danube Ports Rivers and Ports ROMANIA
Danube navigation improvements Rivers and Ports ROMANIA
JASPERS projects (1)
![Page 16: Presented at an InterAct Danube Region Strategy workshop on 17 March 2010 in Bratislava](https://reader035.fdocuments.in/reader035/viewer/2022062422/568138ac550346895da06a3c/html5/thumbnails/16.jpg)
16
Danube Region
Danube navigation improvement - Section 4 Port of Calafat Rivers and Ports ROMANIA
Danube navigation improvement - Section 3 Navigable channels Rivers and Ports ROMANIA
Danube navigation improvement - Section 1 Common Sector between Romania and Bulgaria Rivers and Ports ROMANIA
Mid Danube Solid Waste Project Solid Waste HUNGARY
Mid-Danube Solid Waste Solid Waste HUNGARY
Danube reinforcement of embankments Flood prevention HUNGARY
Mid-Danube Recultivation Solid Waste HUNGARY
Development of Public infrastructure on Danube ports Rivers and Ports ROMANIA
JASPERS projects (2)