Presentazione engineered systems 2015 lkd

33

Transcript of Presentazione engineered systems 2015 lkd

Page 1: Presentazione engineered systems 2015 lkd
Page 2: Presentazione engineered systems 2015 lkd

ASCO POMPE GROUP

Page 3: Presentazione engineered systems 2015 lkd

who we areYear of establishment: 1954 Employees: 52 (end 2014)

Manufacturing plant: 4,000 m2

ASCO POMPE ENGINEERED SYSTEMSIs a Division of ASCO POMPE srl that provides:Engineering, Procurement and Construction of technical solutions to any dosing or fluid handlings need

Page 4: Presentazione engineered systems 2015 lkd

What we do

We create tailor made packages and skids,

engineered to customer specifications and

compliant with any international standards

Page 5: Presentazione engineered systems 2015 lkd

Why choose us

Pump

SKID

• Can choose from any pump vendors (no restriction!)

• Pump portion is only 10 to 15% of skids and packages.

• Remaining 85 to 90% is where we have know-how.

• In-house design of baseplates, tanks, and piping.

• Internal welders and piping fabrication

Page 6: Presentazione engineered systems 2015 lkd

Range of Production• Chemical Injection Packages

• Sampling Systems

• Methanol Injection Packages

• Odorization Packages

• Solar Power Skids

• Well Head Control Panels & HPU

Page 7: Presentazione engineered systems 2015 lkd

Markets Followed

• Oil & Gas, offshore & onshore• Petrochemical• Power plant• FPSO• Water Treatment

Page 8: Presentazione engineered systems 2015 lkd

Asco Worldwide

Sales RepresentativeAuthorized•Spain•Portugal•Egypt•UAE•Kuwait•Oman•Malaysia•Brunei•Vietnam•Japan•Saudi Arabia•South Korea

Coming Soon•USA•Canada•Brazil•Iran

Page 9: Presentazione engineered systems 2015 lkd

applications

• Injection of additives into pipelines

• Boiler feed water

• MEG injection into well heads

• Water reinjection

• Glycol Injection

Page 10: Presentazione engineered systems 2015 lkd

Mechanical design

• ASME VIII div.1, ASME IX , R&Y

• API, EN 15614-1

• FEM (Solidworks)

• Dynamic & Static Calculation

• Vibration and Noise Analysis

Page 11: Presentazione engineered systems 2015 lkd

REFERENCES

Page 12: Presentazione engineered systems 2015 lkd

CUSTOMER:SMS IMMSE

END USER: SEVERAL

SERVICE: Still mill nozzle

feeding

LOCATION: ITALY

YEAR: 2009

Page 13: Presentazione engineered systems 2015 lkd

CUSTOMER:Technip

PROJECT:Refinery

SERVICE: additive

injection

LOCATION: Sweden

YEAR: 2010

Page 14: Presentazione engineered systems 2015 lkd

CUSTOMER:Linde AG

PROJECT: Milazzo Refinery

END USER:ERG

SERVICE: additive

injection

LOCATION: Italy

YEAR: 2010

Page 15: Presentazione engineered systems 2015 lkd

CUSTOMER:PETROCONST

PROJECT: REFINERY

END USER: OMV PETROM

SERVICE: Methanol Injection

LOCATION: ROMANIA

YEAR: 2010

Page 16: Presentazione engineered systems 2015 lkd

CUSTOMER: BONATTI

PROJECT:New Utility Water System

END USER: AKAKUS OIL

SERVICE:water relaunching

LOCATION: LYBIA

YEAR: 2010

Page 17: Presentazione engineered systems 2015 lkd

CUSTOMER:STP

PROJECT:Oil regenaration

END USER: VEOLIA

SERVICE: Oil rerecovery

LOCATION:CANADA

YEAR: 2010

Page 18: Presentazione engineered systems 2015 lkd

CUSTOMER:REGGIANE Italy

END USER: Daewoo

SERVICE: Water desalination

LOCATION: Lybia

YEAR: 2011

Page 19: Presentazione engineered systems 2015 lkd

CUSTOMER:SAIPEM

PROJECT:Fertilizer plant

END USER: QAFCO

SERVICE: Fertilizer

LOCATION: QATAR

YEAR: 2011

Page 20: Presentazione engineered systems 2015 lkd

CUSTOMER:TECNIMONT

PROJECT: JSC Sibur PDH

Tobolsk Polimer Project

END USER: LUKOIL

SERVICE: Chemical Injection

LOCATION: Russia

YEAR: 2011

Design Temperature:-46C

Page 21: Presentazione engineered systems 2015 lkd

CUSTOMER:BONATTI Italy

END USER: SONATRACH

SERVICE: Water reinjection

LOCATION: ALGERIA

YEAR: 2012

Page 22: Presentazione engineered systems 2015 lkd

CUSTOMER:OMV

PROJECT:MEHRAB

END USER: OMV PAKISTAN

SERVICE: Corrosion Inhibitor

LOCATION: PAKISTAN

YEAR: 2012Air driven pumps

Tank 18 m3

Page 23: Presentazione engineered systems 2015 lkd

Chemical injection units FAST TRACK PROJECTDelivery time 3 monthsApplication: Additives injection

Final destination: CongoDim. each: 7000x2500x3500H

Weight each: 4000 KgsMatl’s:AISI 316LAP job ref. VO11-4246

Page 24: Presentazione engineered systems 2015 lkd

CUSTOMER:TECHNIP

PROJECT:Bourgas Refinery

END USER: LUKOIL NEFTOKIM

SERVICE: Chemical injection

LOCATION: BULGARIA

YEAR: 2013

N.24 skids

Page 25: Presentazione engineered systems 2015 lkd

CUSTOMER: ILK TURKEY

PROJECT:WEST DIYARBEKIR

END USER: PETRONAS CARIGALI

SERVICE: MEG injection package

LOCATION: TURKMENISTAN

YEAR: 2013

Weight 76 t, lenght 12 m

Page 26: Presentazione engineered systems 2015 lkd

CUSTOMER: KT

PROJECT:PERM REFINERY

END USER: LUKOIL

SERVICE: MEG injection package

LOCATION: RUSSIA-SIBERIA

YEAR: 2013

Page 27: Presentazione engineered systems 2015 lkd

CUSTOMER: ILK

PROJECT:GARAGOL

END USER: PETRONAS

SERVICE: WHCP

LOCATION:

TURKMENISTAN

YEAR: 2015

Page 28: Presentazione engineered systems 2015 lkd

CUSTOMER: KNM

PROCESS & SYSTEMS

PROJECT:GISSAR

END USER: LUKOIL UZB

SERVICE: Chemical Injection

LOCATION: UZBEKISTAN

YEAR: 2014

Page 29: Presentazione engineered systems 2015 lkd

CUSTOMER: ENPPI

PROJECT:WDDM Phase IX A

END USER: BURULLUS

SERVICE: Chemical Injection pck

LOCATION: EGYPT

YEAR: 2015

Page 30: Presentazione engineered systems 2015 lkd

CUSTOMER: ABB

END USER: PDO OMAN

SERVICE: SAMPLING SYSTEM

LOCATION: OMAN

YEAR: 2015

Page 31: Presentazione engineered systems 2015 lkd

Recent updates

TAKREER Approval

Page 32: Presentazione engineered systems 2015 lkd

Company Name: ASCO POMPE SRLCompany ID: 155506Subscription to SHELL SUPPLIER QUALIFICATION SYSTEM,

SHELL Approval

Page 33: Presentazione engineered systems 2015 lkd

Recent updates