  • Sh C S PRASAD DG, CPWD

    to AHMEDABADCPWD, GUJARATwelcomes

  • Jurisdiction GCC, WZ-IGandhinagar Central Division-I

    Gandhinagar Central Division-II

    Vadodara Central Divsion

    Rajkot Central Division

  • OLD CGO Building, Mumbai Western Region Headquarters

  • Recreation Park, Hyderabad Estate

  • Belvedere House, Bhulabhai Desai Road

  • Building No 27, S.M.PlotBefore repairAfter repair

  • Proposed for Demolition in Antop Hill, where CPWD office Sahar is to be shiftedBuilding Nos 104-105, 110-115.200 Nos Type II Qtrs Area 10400 sqm

  • TYPE IV AT SECTOR V, KANE NAGAR

  • Project Details REVISED AA & ES Amount : Rs.173.80 Crores(Without DC, Architects Fee & Service Tax)Plot Area: 10,000 sqmFloors: 2 B + G + 7Permissible built up area : 20,000 sqmProposed built up area : 22,740 sqmBasement Area : 13,843 sqmPresent Status : Structure CompletedLikely date of application: 28-02-10Likely date of completion: 31-03-10

  • Punjab National Bank Office Building

  • Salient Features

    DESIGN CONCEPT : The structre is designed as RCC framed structure with 2 Basements, Ground +9 upper Floors for a life span of 80 years with reasonable maintenance. Each floor will have two wings with required infrastructure for their independent functioning so as to facilitate floor/wing wise sale/lease of surplus area, if need be. The Foundation is Raft Foundation with Rock Anchors. Necessary expansion joints area provided to take care of seismic movements required for the latest earthquake zoning of Mumbai. The Elevation of the Buildings consists of Structural Glazing, Aluminium Composite Panel Cladding and Louvers. There is an added feature of Stainless Steel Screen with reflectors in front of the glazing which will make the Building stand out among the other Buildings in the Area. The Arcade cladding is with white Crystalised glass. The Internal Finishes in Main Lobby and Floor Lobbies are combination of Italian Marble and Granite in Floors and Dados. The Floor of Toilets and Pantries will have Granite Flooring with Coloured Glazed Tiles full height Dado on walls. The Internal Finishes of the Office Areas will be a part of Interiors. In Services the Electrical Installation consist of 2X1250 KVA Transformers,HT&LT Panels,2X750 KVA D.G. sets, Centralized A.C. system of 1200 TR capacity,. The Fire Fighting consists of sprinklers at the ceiling level in Basements as well as upper floors and Fire Hose Reels. Intelligent addressable fire alarm system is proposed. The Building Management System is also proposed.

  • SITE FOR INCOME TAX OFFICE BULIDINGPASSPORT OFFICE PLOT LAY OUT & SURROUNDINGS

  • Regional Passport office ,BKC REGIONAL PASSPORT OFFICE, BKC

  • Project Details (RPO)Estimate Amount ( modified) : Rs. 59.72 CroresAA & ES Received : Rs. 59.72 Crores ( Date 12.09.2008)Time allowed : 24 Months Plot Area: 2800 sqmFloors : 2 B + G + 5+3(future) FloorsPermissible built up area : 6100 sqmBasement Area: 2800 sqmPresent Status : Foundation work in progress.Revised CNE Memo sent. Tenders for the balance work to be called .

  • Proposed Regional Passport office : PerspectiveREGIONAL PASSPORT OFFICE, BKC

  • Proposed Regional Passport office : Interior perspective Entrance Lobby

  • Proposed Regional Passport office : Interior perspective Ground floor public Hall

  • WELL DEFINED PUBLIC AREA WITH COUNTERS. PUBLIC AREAS IN GROUND, 1ST & 2ND FLOORS VISUALLY CONNECTED WITH AN ATRIUM.LARGE PUBLIC HALLS ON 1ST & 2ND FLOORS WITH AMPLE SEATING LOUNGES FOR APPLICANTS AND VISITORS. SEGREGATED OFFICE AREA WITH SEPARATE ENTRY FOR OFFICIALS. SERVICES & CIRCULATION ON ONE SIDE.PARKING IN TWO LEVEL BASEMENTS & PARTLY ON SURFACE (Total Parking Provided 51 Cars as per by bye-laws)UPPER BASEMENT FOR CAR PARKING & ELECTRICAL SERVICES LIKE ESS.LOWER BASEMENT FOR CAR PARKING, SEWAGE TREATMENT PLANT, WATER TANKS & STORESACCESS TO BASEMENT BY 6.0 M WIDE TWO WAY RAMP.THE REGIONAL PASSPORT OFFICERS CABIN WITH ANTI CHAMBER AND MINI CONFERENCE AND ALL OFFICERS CABINS ARE ACCOMMODATED ON 2ND AND 3RD FLOORS.

    THE 4th FLOOR IS STORAGE AREA DESIGNATED FOR THE DIFFERENT SECTIONS AND ACTIVITIES.

    THE 5TH FLOOOR HOUSES TWO TRANSIT FLAT WITH AN ATTENDENT ROOM FOR 2 ATTENDENTS, A CAFETERIA FOR STAFF, RECREATION CENTRE, LIBRARY & HEALTH CLUB.

    Concept

  • Designed as a State-of-the-art, modern intelligent building with following features: Solar power pack & water heating system.

    Doubled Glazed facades for energy efficiency & natural light.

    Sewage treatment plant to recycle waste water for Air- conditioning & gardening.

    Hydro-pneumatic system for water supply.

    Energy saving devices (VFD) with automatic switching system for lights & AC system.

    Intelligent fire alarm system with PA system and safety signage's

    Equipment for public addresses & EPABX systems.

    Facade cleaning system & Lighting including signages and illuminated Logo.

    Mechanical ventilation system for basement.

    Non-wet fire fighting system for computer section and rare document section.

    Rain water harvesting: All roof top rain water shall be canalised to the rainwater harvesting tank and used for horticulture.

    Green building features:

  • Combination of composite aluminum panel / Granite cladding & heat reflecting double glass wall on exterior face as per the ambience of Bandra Kurla Complex.

    Polished granite stone counters & combination of granite with marble flooring for first three floors.

    Vitrified tile flooring in other floors.

    Double skinned pre laminated particle board partitions.

    Canopy with steel space frame & Composite Aluminium panel. Stainless steel railing.

    Teak wood door frames with veneered flush doors.

    Gypsum / Mineral fiber acoustic false ceiling.

    Brief Specifications:

  • CPWD WORKS INMUMBAI(excluding BKC)

  • Hostel, Auditorium, Facility Building, Class Rooms & Quarters for Shore Based Marine Academy at T.S Chanakya, Navi Mumbai. Est. Cost Rs. 40 CroresBank building for IDBI at CBD, Belapur. Est. Cost. Rs. 48 CroresRenovation of CO bldg for Union Bank of India at Nariman Point, Mumbai. Est Cost Rs. 33 CroresHostel Building for NITIE, Powai, Mumbai. Estimated cost: Rs. 40.50 crores Institute Block for RSVP at Mumbai Est Cost. Rs. 10 Crores.Contd..

  • Bank building cum Quarters for UCO Bank, Mumbai Estimated Cost Rs. 20 CroresIDBI Bank Quarters Renovation at Juhu (4.26 crore)FWRTC at PanvelPNB Quarters at KandivaliSAI works at Kandivali(Hockey Field with synthetic turf and Athletic Track)Academic cum Library for NITIE (G+5)(43.20 Cr)

  • Academic cum Library Block for NITIE

  • Academic cum Library Block for NITIE

    AA &ES : 43.20 CroresStipulated date of start :- 27/05/2009

    Stipulated date of completion:- 26/12/2010

    Present position :- RCC column work in basement is in progress. Approximately 10% of the over all work is completed.

    Target date of completion :- 26/12/2010

  • Status as on 29-11-09

  • Hostel Building for NITIE G+16

  • Project Details REVISED AA & ES Amount : Rs.40.50 CroresFloors: Ground + First floor (Dining hall) + 15 upper floors (Hostel).Proposed built up area : 11,144 sqmPresent Status : Mobilization of man & machinary in progress Date of start: 16-12-09 Date of completion: 15-08-11

  • Hostel building for National Institute of Industrial Engineering

  • Athletic Track at SAI, Kandivali

  • Renovation work at Securities Appellate Tribunal

  • Renovation work at Registrar of Companies

  • Renovation work at LRIT JAHAZ BHAWAN

  • sCPWD IN GUJARATDANTIWADADEHGAMHIMMATNAGARVADNAGAR

  • CPWD WORKS IN GUJARAT STATE INSTITUTIONAL BUILDINGS

    SrName of WorkLocationAmountStatus1Gujarat Ayurved UniversityJamnagar1800.00In Progress2C/o RTC, Hostel & Auditorium for NIFT, M/o Textile, GOI. Gandhinagar600.00In Progress3C/o RVTIBaroda380.00In Progress4Quarters for CAT, DOPTAhmedabad470.00In Progress

    5Vertical Extension of Hostels for IHM, M/o Tourism, GOI. Gandhinagar160.00Completed & Handed over In June 2009

  • ACADEMIC / EDUCATIONAL BUILDINGS

  • PARA-MILITARY WORKS

    SrName of WorkLocationAmountStatus1BSF Battalion WorksDantiwada1100.00In Progress2Compound Wall, BSFGandhinagar185.00In Progress3Internal Roads of BSF Campus, Gandhinagar221.00DE Prepared4Small Arms Workshop, BSFGandhinagar261.00DE is being Prepared51 MLD Sewage Treatment Plant & Misc. Works of CRPFGandhinagar175.00In Progress6177 Nos BSF QuartersBhuj1500.00 work in progress710 Bedded CRPF HospitalAhmedabad300.00 work awarded8Office & Quarters for SIBRajkot180.00 work awarded

  • INCOME TAX & CUSTOMS BUILDING

    SrName of WorkLocationAmountStatus1Office & Quarters for Income TaxAhmedabad2900.00In progress2Quarters for Income TaxSurat560.00In progress3Income Tax Office & QuartersGandhidham360.004Income Tax Office BuildingHimmatnagar210.00In Progress5Quarters for Customs & Central ExciseOkha368.00DE under Preparation6Income Tax Office BuildingAhmedabad8300.00CNE Held7Income Tax Office BuildingGandhinagarPrelim. stageRequisition Recd.

  • SPORTS WORKS

    SrName of WorkLocationAmountStatus1Global Category Synthetic Hockey Surface for SAIGandhinagar200.00Completed2C/o 400 M Synthetic Athletic Track for SAI.Gandhinagar350.00Completed3C/o 100 Bedded Hostel for SAI.Gandhinagar398.00In Progress4.C/o Sports sciences centre for SAIGandhinagar100.00In Progress5.C/o Modern fitness centre for SAIGandhinagar127.00In Progress

  • BRIDGES / ROADS WORKS

    SrName of WorkLocationAmountStatus1Bridge across SakartodeSilvassa340.00In Progress(70%)2Bridge across Tod Creek Diu320.00In Progress3Major Bridge across Piparia RiverDaman420.00Under Planning4Bridge Across Kolak RiverDaman740.00Under Planning

  • MISC. WORKS

    SrName of WorkLocationAmountStatus1Misc. works for IRBN, D &D(UT)Diu290.00Completed2Misc. works for IRBN, D &D(UT)Silvassa190.00In Progress3New Hostel Building for 192 Inmates for Indo-German Tool RoomAhmedabad471.00Work Started.4General Pool Office & GPRA Baroda2800.00Under Planning

  • C/O 100 BEDDED HOSTEL FOR CWG2010 FORSPORTS AUTHORITY OF INDIA

  • 100 Bedded Hostel for SAI at Gandhinagar (Front Side View)

  • 100 Bedded Hostel for SAI at Gandhinagar (Inner Side View)

  • 100 Bedded Hostel for SAI at Gandhinagar (Main Entrance)

  • Project Details Project Details

    C/o 100 Bedded Hostel for SAI at Gandhinagar

    A/A & E/S Amount : Rs.507.00 LakhsFloors : Ground (Dining hall) + First floor + Second floor.Plot Area : 258991 Sqm.Proposed Built up Area : 2981.52 SqmPresent Status : 90% work completed. Date of start: 04.05.2009Date of completion: 31.05.2010

  • Sports Science Centre for SAI at Gandhinagar

  • Sports Science Centre for SAI at Gandhinagar

  • Project Details Project Details

    Sports Science Centre for SAI at Gandhinagar

    A/A & E/S Amount : Rs.100.00 LakhsFloors : Ground FloorPlot Area: 258991 Sqm.Proposed Built up Area : 550.88 Sqm.Present Status : 90% work completed. Date of start: 17.05.2009Date of completion: 31.05.2010

  • Modern Fitness Centre for SAI at Gandhinagar

  • Modern Fitness Centre for SAI at Gandhinagar

  • Project Details

    Modern Fitness Centre for SAI at Gandhinagar

    A/A & E/S Amount : Rs.127.26 LakhsFloors : Ground + First FloorPlot Area: 258991 Sqm.Proposed Built up Area : 569.98 Sqm.Present Status : 90% work completed. Date of start: 17.05.2009Date of completion: 31.05.2010

  • C/o INCOME TAX OFFICE BUILDING AT HIMMATNAGAR.

    Cost: Rs. 250.00 Lakhs; Status : In Progress

  • Project Details

    Office Building for Income Tax at Himmatnagar

    A/A & E/S Amount : Rs.283.37 LakhsCost (Civil+Elect) : Rs. 250.00 LakhsFloors : Basement + G+5Plot Area: 600.32 Sqm.Proposed Built up Area : 1591.37 Sqm. and 515.42 Sqm. for ParkingPresent Status : 80% work completed. Date of start: 10.10.2007Date of completion: 30.06.2010

  • Providing & Laying Global Category Synthetic Hockey Surface at S.A.I., Gandhinagar.Cost : Rs. 150.00 Lacs Date of Actual Completion : 02.01.2008

  • Providing & Laying 400 M Standard Synthetic Athletic Track for SAI, Gandhinagar.Cost : Rs. 350.00 Lakhs Date of Actual Completion : 07.11.2009

  • Cost: 254 lacs; Status: NIT being prepared

  • C/o Vertical Extension of Boys & Girls Hostels for IHM at Gandhinagar.Cost : Rs. 160.00 Lakhs ACTUAL DOC 31-05-2009

  • 200 Bedded Girls Hostel for NIFT, GandhinagarCost : Rs. 492.00 Lakhs Actual Date of Completion : 15.01.2010

  • Name of Work : Vertical Extension of Academic Blocks, Dining Hall & Construction of Fast Food Centre for IHM at Gandhinagar. Cost : Rs. 220.00 Lakhs DOS 28-10-2009 DOC 27-10-2010

  • THANKS !

    **********************