Clyde Ellis
Springfield, VA Office
October 22, 2013
Increase Capacity of Existing Steel Bridges with External Post-Tensioning
![Page 2: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/2.jpg)
•Approximately 600,000 U.S. highway bridges •69,223 deficient bridges •Nearly one-third of the nation’s highway bridges +50 years old •The average age of bridges in the U.S. is 42 years old
Database released in Feb 2011 by FHWA, Transportation for America (T4) analysis published Mar 2011
America’s Aging Infrastructure
![Page 3: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/3.jpg)
• Federal law requires bridge’s 20+ span to be inspected bi-annually
• Evaluate: Superstructure, Substructure, Deck
• Rating 0 to 9; 9 is best • If 1 of 3 components scores 4 or lower • “Structurally Deficient” requires
– Significant maintenance, rehab, replacement, restricted use
– Inspected annually – Consider load rating
Structurally Deficient Bridges
![Page 4: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/4.jpg)
• Increased loads – Permanent loads (Restripping, addition of
safety median barrier, addition of deck overlay, increase in roadway width)
– Temporary loads (Overloaded trucks, heavier truck loads)
• Surface Transportation Assistance Act – increased truck sizes and weights as result of economic development
• Permit Design Live Load – allows substantial increase in live loads for special or key routes
Reasons for Low Rating
![Page 5: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/5.jpg)
• Deterioration/Corrosion of primary load carrying members
– Deficient fatigue performance of details
– Lack of maintenance (exposure to de-icing salts or salt water)
– Wear/tear due to increasing truck traffic
• Human Factors – Design, Fabrication, Construction
errors
Reasons for Low Rating
![Page 6: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/6.jpg)
1. Determine desired load rating 2. Perform structural analysis to determine
deficient members • If overload in flexure: resulting from service load
stresses, fatigue stresses or ultimate capacity ? 3. Identify most cost eff. technique to strengthen 4. Develop cost estimate to strengthen vs. replace
• Rule of thumb: replace if strengthening is more than 45% - 54% of replacement cost
Strengthening vs. Replacement
![Page 7: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/7.jpg)
• Considerations – construction cost – annual maintenance – safety aspects / service life
• Most frequent techniques – Replace deficient members – Increase the member
cross-section by adding steel cover plates
Bridge Strengthening
![Page 8: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/8.jpg)
• Other techniques – Lightweight deck replacement – Composite action between deck
and supporting members – Supplemental supports to reduce
span length – Adding new girders – Converting single spans into
continuous span – External PT
Bridge Strengthening
![Page 9: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/9.jpg)
First Prestressed Concrete Bridge (Germany); PT Bars
First Strengthening Steel Highway Bridge (MN)
First Strengthening Steel Truss Bridge (France)
Development of Ext. P-T Technology
1937
1964
1975
Ext PT Strengthening Applications Limited: •Lack of information on how to apply technique •No specific guidelines on this method of strengthening
![Page 10: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/10.jpg)
• Introduction of externally applied load to a structural member with tendons that relieves longitudinal tension overstresses resulting from service load and fatigue stresses
PT Basic Concept
• Compressive force applied to tension flange to resist bending moment from applied loads
![Page 11: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/11.jpg)
Q
Q fc 2fc fc
ft = fc
2Q 2fc fc 2fc
2ft = 2fc
ft
fc= ft
fr
e
Effect of Eccentric Tendons at Midspan
![Page 12: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/12.jpg)
• Structurally very effective
– Negligible increase to dead load
– Reduces LL stresses and deflections
– Improved fatigue category details
– Low initial construction cost
• Ease of installation and overall speed of construction
• No disruption to traffic flow
• Ability to adjust the level of strengthening in future
Advantages of External PT
![Page 13: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/13.jpg)
1. Determine moments for applied loads at mid span 2. Calculate girder stresses in tension flange 3. Calculate allowable stresses based on as-built material 4. Assume PT eccentricity and calculate PT force
required to makeup deficiency 5. Check member buckling, member yielding and tendon
yielding 6. Repeat for other critical areas 7. Determine PT anchor location and design anchor
bracket
Simple Span Girder – Design Process
Q
e
![Page 14: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/14.jpg)
• Immediate Losses – Friction Losses – Seating Losses – Elastic Shortening
• Long Term Loss – Steel Relaxation
• Be cognizant of minimize clearances for mounting, tendon path and stressing
• Stage stressing – if PT is not concentric with member longitudinal axis
Add’l Design Considerations
![Page 15: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/15.jpg)
• High Strength 7 wire strand • ASTM A416 • Ultimate Strength 270 ksi • Low Relaxation • Reeless coil • Common sizes
– 0.6”x 7, 12, 19
• Thread high strength bar • ASTM A722 • Ultimate Strength 150 ksi • Common Sizes
– 1” to 1-3/4” dia.
• Straight lengths up to 60’
Prestressing Steel
![Page 16: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/16.jpg)
External Tendon Cross-section
![Page 17: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/17.jpg)
P-T Anchorages
• Built up section of steel plates • Mechanical locking device
– Wedges and wedge plate – Nut and washer
• Trumpet (strands only)
![Page 18: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/18.jpg)
• Primarily used with strand tendons • Applicable if want to increase PT bending moment • Most common type of steel plate and bent pipe
PT Deviators
![Page 19: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/19.jpg)
• Replaceable – Bolted connections – Tendons can be cut and replaced
• Inspectable – Magnetic flux leakage – Bore scope inspection
• Durable • Force verification
– Load cell, lift-off for ungrouted PT – Vibration analysis
• Ability to Increase Prestress Force – Future PT – Stress tendons to a higher force than
originally installed at
External PT Features
![Page 20: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/20.jpg)
Strengthening Case Studies
![Page 21: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/21.jpg)
Androscoggin River Bridge
• Part of Turnpike Ext. built in 1955; widened in 1995
• Max LL configuration accommodate 3 lanes; rates low
• Issue made worse with ongoing bottom flange corrosion
• 2 lane configuration could rate below 1 if not strengthened
Brunswick, ME
![Page 22: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/22.jpg)
157 ft
Proposed Tendon Layout
G #2
G #1
FRAMING PLAN
![Page 23: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/23.jpg)
Androscoggin River Bridge Brunswick, ME
End Anchorage Assembly
External PT Duct
![Page 24: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/24.jpg)
Hialeah Expressway Miami, FL
Added 3 PT tendons
• New loads from a wider bridge
• Retrofit fracture critical steel girder bent bent to upgrade capacity
• Steel plate girders strengthening with external P-T
![Page 25: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/25.jpg)
Repair Details
![Page 26: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/26.jpg)
Strengthening Completed
![Page 27: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/27.jpg)
Driscoll Bridge Keasbey, NJ over Riritan River
• 2 bridges constructed in 1952
• Widest bridge in world (15 lanes)
• Part of Garden State Parkway
• Fracture critical bridge with concrete deck
• Strengthen floor beams for increased traffic loads
![Page 28: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/28.jpg)
Driscoll Bridge Keasbey, NJ over Riritan River
• External multi-strand PT tendons used to strengthen floor beams
• Center deviator added to increase the bending moment capacity
• PT installed over water while bridge remained open to traffic
Low Point Deviator
PT Anchorage Device
Photo credit by Dwyidag Systems International
![Page 29: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/29.jpg)
• External PT strengthening has a successful history 60+ years
• Longitudinal tendons can be used to strengthen steel girders, truss chords/diagonals and floor beams
• External PT has been used to relieve stresses, reduces deflections, improve fatigue details and add substantial live load capacity an existing bridge
Summary
![Page 30: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/30.jpg)
• Anchorages and tendons can be prefabricated to reduce time onsite
• Anchorage/deviator details have been developed overtime with no reported issues
• Sufficient knowledge exists to develop a manual to assist engineers in applying PT principles
Summary
![Page 31: Presentation-VSL.cellis.session 22- Increase Capacity of Existing Steel Bridges With External Post-tensioning](https://reader034.fdocuments.in/reader034/viewer/2022051402/5695d4501a28ab9b02a1063a/html5/thumbnails/31.jpg)
Thank You!