Presentation to PLN S2JB 100804
-
Upload
yayan-cahyana -
Category
Documents
-
view
225 -
download
4
description
Transcript of Presentation to PLN S2JB 100804
-
MUAROJAMBI BIOMAS POWER PLANT
August 5, 2010
-
Huge resources !
Why EFB / palm shell?
8.2m TON
X TON X TON
The BACKGROUND
2
65.5m TON 13.6m TON8.2m TON
Continous supply Easy to collect Good calorific value Can be fermented EFB currently has no value
-
CPO Mass Balance
3
-
CPO Waste Potential in JAMBI
4
Biomass Potential in JAMBI
No POM Unit Capacity FFB Biomass (T/Month) RemarksEFB Shell Fiber
BSP (T/H) (T/M)*** 21% 6% 16% (/FFB ratio)*1 SNP 1 30 10,028 2,106 602 1,604 actual2 EMAL 1 60 12,367 2,597 742 1,979 actual3 AGW 1 60 18,700 3,927 1,122 2,992 actual4 DOMAS 1 1 60 28,500 5,985 1,710 4,560 estimate5 DOMAS 2 1 60 28,500 5,985 1,710 4,560 estimate
Sub Total 5 270 98,095 20,600 5,886 15,695 KAB.JAMBI**
1 BTG HARI 3 145 72,500 15,225 4,350 11,600 estimate2 MUARO JAMBI 10 405 202,500 42,525 12,150 32,400 estimate3 BUNGO 4 135 67,500 14,175 4,050 10,800 estimate4 SAROLANGUN 1 57 28,500 5,985 1,710 4,560 estimate5 MERANGIN 5 215 107,500 22,575 6,450 17,200 estimate6 TANJAB BARAT 6 254 127,000 26,670 7,620 20,320 estimate7 TEBO 4 150 75,000 15,750 4,500 12,000 estimate
Sub Total 33 1361 680,500 142,905 40,830 108,880 TOTAL 38 1631 778,595 163,505 46,716 124,575
*) source: Indonesian Oil Palm Research Institute (IOPRI)
**) source: dari website pemerintah propinsi Jambi
***) t/h x 20 hr ops ops x 25 working days
-
Project name Biomass Power PlantLocation Sungai Gelam, Kab Muaro Jambi, Jambi
ProvinceFuel/feedstock Empty Fruit Bunch (EFB) + shellCapacity Up to 10 MWDistance to PLN Grid Up to 8 kmDistance to Mill Less than 10 kmOff Taker PLN S2JBIndicative price Rp. 787.2 /kWhArea 5 Ha
The PROJECT
5
-
6Confirmed supply from: Agrowiyana - Sarolangun Sumbertama Nusa Pertiwi -
Muarojambi Eramitra Agro Lestari
Tanjung Jabung Barat
Those mills under BSP group
-
The LOCATION
7
POM 3Tanjung jabung barat
POM 2Pauh Sorolangun
POM 1Kumpeh, muarojambi
Jambi Town
-
Location Matrix
8
Nama Lokasi
Uraian satuan
Nama Gardu Hubung / Gardu Induk GH Sei Gelam GH Sei Gelam GH Sei Gelam GI Aur Duri
Jarak plant ke GH atau GI km +/- 4 +/- 3 +/- 121) +/- 3
Laluan Jaring 20kVTepi Jalan dan cenderung bebas dari pepohonan
Tepi Jalan dan cenderung bebas dari pepohonan
Tepi Jalan dan cenderung tidak bebas dari pepohonan
Tepi Jalan dan cenderung bebas dari pepohonan
Jarak ke PKS sumber km +/- 18 +/- 17 +/- 5 +/- 46
Jarak plant ke Sumber air meter +/- 200 +/- 50 +/- 100 +/- 50
Nama Sumber airPertemuan Sungai Toman & Sungai Air Merah
Sungai Air Merah Sungai Parit (anak Sungai Kumpeh)Rawa bantaran Sungai Batanghari
Kondisi Aliran sepanjang tahun Tidak pernah kering2) Tidak pernah kering2) Tidak pernah kering2) Tidak pernah kering2)
Kondisi Kualitas air
pH 5,59 5,52 3,86 6,34
Turbidity NTU 7,53 11,00 12,80 88,00
Conductivity s/cm 16,00 17,00 73,00 41,00
Kandungan Amonia mg/ltr
-
Alternative Location
9
Alternatif Lokasi
Sei Gelam1 & 2
Altenatif Lokasi
Desa Parit
Alternatif Lokasi
Aur Duri
Alternatif Lokasi
Sei Gelam1 & 2
Altenatif Lokasi
Desa Parit
Alternatif Lokasi
Aur Duri
Factors to be considered:
Distance to mills Distance to grid Water availibility
-
Distances from PLANT
10
GH PLTD GasSei Gelam
dariGH The Hok
Ke Desa Tangkit
Ke DesaPetaling
Titik PencabanganSei Gelam
Alternatif 2 LokasiPLTBS Sei Gelam
+/- 0,8 km
+/-2
km
+/- 2 km
Alternatif 1 LokasiPLTBS Sei Gelam
+/-1
km
GH PLTD GasSei Gelam
dariGH The Hok
Ke Desa Tangkit
Ke DesaPetaling
Titik PencabanganSei Gelam
Alternatif 2 LokasiPLTBS Sei Gelam
+/- 0,8 km
+/-2
km
+/- 2 km
Alternatif 1 LokasiPLTBS Sei Gelam
+/-1
km
-
Common Scheme of PLTBS
11
-
12
Deskripsi singkatan basis analisis satuan TBK Press Cangkang
Total Moisture TM ar % wgt 52,23 3,97Inherent Moisture IM adb % wgt 4,72 5,45Ash A adb % wgt 4,73 7,54Volatile Matter VM adb % wgt 75,89 69,58Fixed Carbon FC adb % wgt 14,66 17,43Sulphur S adb % wgt 0,12 0,08Gross Calorific Value GCV adb kcal/kg 5334,0 4500,0Calorific Value CV daf kcal/kg 5891,0 5172,0Carbon C adb % wgt 52,80 48,10Hydrogen H adb % wgt 7,05 5,36Nitrogen N adb % wgt 0,82 0,53Oxygen O adb % wgt 29,77 32,96
Proximate & Ultimate Analysis
Deskripsi satuan TBK Press Cangkang
SiO2 % 35,30 72,30Al2O3 % 1,78 7,95Fe2O3 % 12,60 10,10MgO % 4,79 0,59CaO % 5,65 1,46Na2O % 1,06 0,14MnO % 0,25 0,05TiO2 % 0,25 0,41P2O5 % 4,10 0,82SO3 % 2,73 0,34K2O % 24,20 2,08
Ash Composition
-
Mills vs Biomass Steam Power Plant
13
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
30 ton 60 ton 90 ton
EFB Shell PLTBS 5MW PLTBS 7Mw
(mill
ion
kca
l)
-
KOMPOFERM Technology
14
Raw material FermentedMethane
GasElectricity
-
EFB Biogas Yield
15
-
Kompoferm Process
16
-
Financial Analysis &Comparision
PLTBS 5MW PLTBS 7MW Kompoferm
Installed Capacity 5.5MW 8.2MW 10MW
Technology Steam boiler Steam boiler Fermentation
Feedstock EFB + shell EFB + shell EFB
Investment 7,371,703 11,867,808 15,989,130
Debt to Equity ratio 30:70 30:70 30:70
Project life 20 years 20 years 20 years
IRR project 15.70% 14.56% 16.45%
Payback period 4.92 year 5.33 year 5.86 year
17
More clean, no air pollutant Easy to handle No shell used Easy to expand
-
SCHEDULE
18
Start Finish Duration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 Site Reconnaissance 1
2 Preparation of Project Summary or Pre FS for applying permit 1 2 2
3 Obtaining approval for IPP on this area 2 3 2
4 Prepare Proposal to be submitted to PLN WS2JB 4 5 2
5 Proposal Submit 5
6 Presentation PLN WS2JB upon agreement of proposal 6 6 1
7 Negotiation with PLN WS2JB for proposed Generated Power Tariff 7 8 2
8 Issuence of Head of Agreement by WS2JB 8
9 Prepare Full FS and Environmental assesment and other related study 4 8 5
13 Preparation of PPA (Power Purchase Agreement) 8 9 2
14 Signing PPA 9
15 Project Effective Date 9
16 Design & Proposal 9 12 4
17 Contraction Work 9 24 16
18 Pillig & Foundation 9 14 6
19 Steam Blow Out 20
20 First Steam Admission 22
21 1st Synchronising 22
22 Commisioning 24 26 2
23 COD 26
No Activities Period, month
-
thank you.
19
Mega Plaza, 12th floorJl. HR. Rasuna Said Kav.C-1Jakarta SelatanP. 021 521 2966F. 021 521 2967
Yayan Cahyana - [email protected] Zenal Mutakin [email protected]
Slide Number 1The BACKGROUNDCPO Mass BalanceCPO Waste Potential in JAMBIThe PROJECTSlide Number 6The LOCATIONLocation MatrixAlternative LocationDistances from PLANTCommon Scheme of PLTBSSlide Number 12Mills vs Biomass Steam Power PlantKOMPOFERM TechnologyEFB Biogas YieldKompoferm ProcessFinancial Analysis &ComparisionSCHEDULESlide Number 19