Denver’s Strategic Transportation Plan (STP, 2008)g p ( )
Population Growth opu at o G o t
Regional Population Growth
2 9 3 3.34.1
4
5Regional Population Growth
2.42.9 3
1
2
3
0
1
2000 2013 2014 2020 2040
Transportation Demanda spo tat o e a d
2005 2015 20302005 2015 2030
C it V lCommunity ValuesCommunity Values
• Quality of Life
Co u ty a ues• Walkabley
• Bikeable• Vibrant
• Livable• Beautiful• Vibrant
• Green• Beautiful• Sustainable
• Active • Accessible
Limited Public Right of Wayted ub c g t o ay
T it?Water Quality?
Parklet?Bike Parking?
Transit?
Denver Moves –Bi lBicycles
2015 Bicycle Program• 20 miles of separated bikeways (bike lanes)
• 5 protected bikeway corridors
• 4 neighborhood bikeway corridors
Neighborhood Bikeways Low‐volume, low‐speed
residential streets prioritized for bicycle and pedestrian travel.
Use signs, pavement markings, and speed and volume management measures tomanagement measures to discourage through tips by motor vehicles
Constructing Knox Court: Kentucky to Alameda in 2015, and in design of 3 more: E 12th Ave Garfield St W 35th Ave
Knox Court corridor
(1) Knox Court bicycle lanes –6th Ave. to 8th Ave. & Knox Court
(1)
sharrows – 8th Ave. to 14th Ave.
(2) Knox Court bicycle lanes –Al d A 6th A
(2)Alameda Ave. to 6th Ave.
(3) Knox/Alameda/Morrison intersection and cycle track
(3)
(4)intersection and cycle track –Nevada Pl. to Alameda Ave.
(4) Knox Court Neighborhood
(4)
(4) Knox Court Neighborhood Bikeway – Kentucky Ave. to Nevada Pl.
(1) Knox Court bicycle lanes – 6th Ave. to 8th Ave. & K C t h 8th A t 14th A Installed 2014
& Knox Court sharrows – 8th Ave to 14th Ave
Bicycle lanes narrow to sharrow condition at 8th Ave to accommodate parking lanes on thinner pavement width
(1) Knox Court bicycle lanes – 6th Ave. to 8th Ave. & K C t h 8th A t 14th A Case study from 75th St. in Seattle re: traffic calming impacts for visually
narrowing striped vehicle lanes
& Knox Court sharrows – 8th Ave to 14th Ave
(1) Knox Court bicycle lanes – 6th Ave. to 8th Ave. & K C t h 8th A t 14th A Posted speed limit on 75th St. – 30 mph
& Knox Court sharrows – 8th Ave to 14th Ave
(2) Knox Court bicycle lanes – Alameda Ave. to 6thA Design complete 2014; installation ongoing (in May‐June 2015) Project coincides with Street Maintenance resurfacing of Knox Court
Ave.
j g
(3) Knox / Alameda / Morrison Intersection and l t k f N d Pl t Al d A
Collaboration with CDOT as part of their RAMP program for the traffic signal Design in progress; includes bicycle signal; installation anticipated in 2016
cycle track from Nevada Pl. to Alameda Ave.
g p g y g p
(4) Knox Court Neighborhood Bikeway from Kent ck A e to Ne ada Place Civil/drainage design for
bumpouts in progress
Kentucky Ave. to Nevada Place
NTP signed for signage and pavement markings 5/7/20155/7/2015
Installation anticipated in 2015in 2015
Knox Court corridor
(1) Knox Court bicycle lanes –6th Ave. to 8th Ave. & Knox Court
(1)
sharrows – 8th Ave. to 14th Ave.
(2) Knox Court bicycle lanes –Al d A 6th A
(2)Alameda Ave. to 6th Ave.
(3) Knox/Alameda/Morrison intersection and cycle track
(3)
(4)intersection and cycle track –Nevada Pl. to Alameda Ave.
(4) Knox Court Neighborhood
(4)
(4) Knox Court Neighborhood Bikeway – Kentucky Ave. to Nevada Pl.
Next Steps
Citywide bikeway planning: Dan [email protected]‐865‐2660
Knox Court corridor designMichael [email protected]@ g g720‐913‐4840