Presentation to BCDC Commission (CDO 2018.02)

May 17 2018

By North Coast Railroad Authority

(NCRA)

Page 2: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Current Setting (Aerial April 2018)

Page 3: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Railroad Related Stakeholder’s

• SMART, fee owner of the property • NCRA, public agency holder of a perpetual easement for

freight operations • NWP Company, private freight operator; completed repair • ARE Incorporated, serves as NCRA’s engineering consultant

Page 4: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Bridge Operator Driveway After Spring 2016 Repair (March 2016 Photo)

Page 5: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Overall grading of repair from Spring 2016 Flooding

Page 6: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Spring 2017 Storm Event Washed Out Repair

Page 7: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Spring 2017 Storm Event Washed Out Repair

Page 8: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Drive Erosion From 2017 Spring Flood

Page 9: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Drive Erosion From 2017 Spring Flood

Page 10: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

April 2018 Washout Stabilized; Fence Added by Residential Owner

Page 11: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

April 2018 East of Drive

Page 12: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

Fence Added after Spring 2017 Flood Event

Page 13: Presentation to BCDC Commission (CDO 2018.02) May 17 2018 ... · Presentation to BCDC Commission (CDO 2018.02) May 17 2018 . By North Coast Railroad Authority (NCRA) Current Setting

View of Fence Post Erosion