    Proposal of

    Purchase & StoreManagement

    System(PSMS)

    (A conceptual Idea )

    February 28

    2011

    For

    BCMCL(Barapukuria Coal Mining & Company Limited.)

    (ACompany of Petrobangla)

  • 8/6/2019 Presentation Store and Purchase Management System

    2/13

    INDENTING

    DEPARTMENTVENDORS

    P U R C H A S I N G

    Module

    Store

    Department

    Packing Slip, Invoice, etc.

    Accounts Module

    Send Copies of PO, Clearance

    Certificate, Invoice, Receiver

    Report, QC Report To Account

    Payable Department

    Requisition

    PO

    PO, Packing Slip,

    Invoice, Receiver

    Report, QC Report

    PO

    G

    o

    od

    s

    PO

    QCRequesting For

    Quality Check

    Receiving Bay

    Goods

    QC Report

    Requesting a

    Report Of

    the RequiredGoods in a

    specific

    format

  • 8/6/2019 Presentation Store and Purchase Management System

    3/13

    Material Receiving Report (MRR)- Foreign

    MRR (Cash Purchase) Store Requisition SR

    Material Location Chart Material Stock Level

    Procurement & Consumption Rate KARDEX

    Scrap Receiving Memo SRM Scrap Requisition From

    Scrap KARDEXScrap Report

    Annual Report Daily Report or Day to Day Report

  • 8/6/2019 Presentation Store and Purchase Management System

    4/13

    Supplier Details Information (ID, Name, City, State, Country, Contact #, Fax, email, web etc.)

    Product Catalog (ID, Name, Type, Description, Drawing No. etc.)

    MRP (Material Requirements Planning) Analysis Report

    Purchase Order Information (Supplier ID, Name, Lead Time, Qnt., Price, Place of Delivery etc. )

    Requisition Information and Priority

    (Req. ID, Dept. Name, Line Number, Item, Qnty., Item Descrip., Delivery Date, Delivery Priority , Etc.)

    Shipment Information

    (ID, OP, Pick up Location, Load and departure time, weight, # of Packages, Transport Mode, Freight Charges etc. )

    Supplier Performance Report (Auto Generated )

    Such Lead Time Promised, exponential Avg. day late, % of rejected for damages or poor quality etc.

    Others. (My Vary to organization to organization )

  • 8/6/2019 Presentation Store and Purchase Management System

    5/13

  • 8/6/2019 Presentation Store and Purchase Management System

    6/13

    System Analysis of Purchase and Store

    Management System

    At present, BCMCL inventory operations are done manually by the user. For keeping a track of

    the equipments ordered, received & delivered to specific indent. Records of the customers, stock

    information, roll out information and customer invoicing information etc. is also maintained in this

    system. This system in general reveals all information on type of equipments ordered for specific

    indent, record of equipments which are received based on what was ordered, order processing

    details for e.g. - details of indenting, purchase order & the equipment dispatch details and

    invoicing details based on each indent.

    All these information are vital for the company. The reports are also included to this system on

    each transaction made. The reports are to be also made manually by the user which is a very

    tedious task. In addition, they had to enter all the details of raw materials into the tables to get to

    a conclusion whenever needed.

    Moreover, in order to get a clear conclusion the user had to make reports on each and every

    category of the equipment, which means creating different individual reports for that particular

    category. In the existing system, the user also had to make entries in as many tables as

    possible. If any modification is to be made, it becomes tedious and cumbersome process, which

    takes a lot of time and energy.

  • 8/6/2019 Presentation Store and Purchase Management System

    7/13

    Drawbacks of Existing System

    The system is manual and very tedious to maintain and make reports since all the data are stored

    in document form/files/registers. And being an organization where all the details have to be kept

    confidential and so maintaining them will be very risky. And to get the details of an indents or a

    particular indent like PO, dispatch, supplier, or equipment details, we have to search through the

    entire files and registers to get that particular detail.

    The following are the lists of drawbacks:

    All are written document.

    The data stored in the document are not reliable.

    Reports are not sufficient and are very complex.

    Redundancy (Unstructured, Unnecessary, Mixed etc.) of data.

    Storing and retrieval of information is time consuming.

    Verification of data is tedious.

    Large volume of data cannot be maintained efficiently.

    Maintaining all the record in an orderly manner is a difficult task. Since all the details are stored in files & registers, which are not computerized, it occupies a voluminous area.

    It is difficult to manually search for a particular item to obtain information about them.

    Slow responding of the information registers.

    Very difficult to verify the stock label.

    And many more important quarries would very difficult to be made and sometimes it is impossible.

  • 8/6/2019 Presentation Store and Purchase Management System

    8/13

    Proposed System

    In this phase, the concepts associated with the system will be analyzed and how they are implemented in the

    project is dealt with. In this, the existing system should studied thoroughly, the problem and the requirements

    should identified, alternative solutions will be analyzed and the best solution among them be selected.

    Advantages of the Proposed SystemThe proposed system has been designed to eliminate the major disadvantages of encountered in the existing

    system. There is no room for errors in the proposed system. The error checking should dealt efficiently. The errors

    that could happen during date entry are also informed to the user. At important point of the data entry, it has been

    ensured that only valid data can be entered. Get easily many more sophisticated reports with the complex

    quarries.

    The proposed system will be designed in such a way to attract user by being user friendly. With the key options in

    the data entry form and the report generation, it helps the user & does not make him feel tedious anymore.

    Developing Solution StrategiesThe proposed system is completely menu driven. Input screens are properly arranged & designed in such a way

    that the user does not feel complicated at any stage of using this system. Therefore it is very easy for the end

    users to work with such a system. Data fields are in the normalized form thereby avoiding data redundancy.

  • 8/6/2019 Presentation Store and Purchase Management System

    9/13

    Implementation ProcedureMTechnology is designing a Purchase & Store Management System (PSMS) forBCMCL. It

    requires an enormous effort in preliminary requirement specification and design before the actual

    software development starts. We divide the implementation into the following definite phase.

    Requirement Specification

    System Architectural Design

    Object Design

    Module DevelopmentIntegration

    System Testing and Trial Run

    User and Administrative Training

    System Signoff

    Maintenance (OP)

  • 8/6/2019 Presentation Store and Purchase Management System

    10/13

    Requirement Specification

    In this phase a team from both the client and vendor will carry out a detail study on the exact

    procedure and requirement of the entire system. The goals of this phase will be to extract

    Processes related to the system

    Entities related to the system

    Interaction among processes and entities

    Desired interface between processes and entities

    Desired management output requirement

    System ArchitecturalD

    esignThis phase is the direct decomposition of the Requirement Specification phase.

    Module internal process design, data structure and data flow

    User interface format and conventions

    Report design and structure

    Object Design

    This phase will act upon the module level design (package design) generate from the earlier phase.

    Business Logic behind each module

    Command flow among objects

    Database schema, replication and sizing specification

    Database objects like table, views etc. specification

  • 8/6/2019 Presentation Store and Purchase Management System

    11/13

    Module Development

    In this phase each module will be developed as per system design report. Module validation,

    verification and unit testing will be integrated into the development process.

    Integration

    At this phase modules developed so far will be integrated according to the subsystem

    specification described in the system design report.

    System Testing and Trial Run

    After the integration is complete, the system will go through site testing through trial run. Both

    the vendor and client will actively take part in this trial run and accurate testing. The following

    objects will be achieved through this phase

    Bug checking and bug fixing

    Finalization of technical documentation

    Finalization of user materials (manuals, help files etc.)

    Future enhancement exploration

    Staff and management acceptance and adaptation with new system

    User and Administrative Training

    In this phase training will be provided to three levels.

    Management training to Purchase & Store personnel

  • 8/6/2019 Presentation Store and Purchase Management System

    12/13

    System Signoff

    This phase is the final of the development phase where the system is fully hand over to the client.

    Maintenance & EnhancementThis is an optional phase. IfBCMCL is willing (which is highly recommended) they can enter a

    per call maintenance contract with the MTechnology. The maintenance contract will ensure

    further modification and enhancement of the system, which the MTechnology does in process

    of his product enhancement or the client feels necessary.

    Phase

    Serial

    Phase Name Weeks Required

    1 Requirement Specification 2

    2 System Design 4

    3 Object Design 4

    4 Module Development 6

    5 Integration 4

    6 System Testing and Trial Run 3

    7 User Administrative Training 1

    8 System Signoff

    Total Duration In Weeks 24

    Implementation Timeline

    Total project timeline from Requirement specification to System Signoff is 168 days. Here is a

    summary.