RAILROAD COMMISSION OF TEXAS
PSA Wells, Allocation Wells and Stacked LateralsPermitting and Completion
Lorenzo Garza & Joe Stasulli
![Page 2: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/2.jpg)
2
Presentation Overview
• How to qualify for Stacked Lateral status
• Requirements for PSA and Allocation wells
• Filing completions for these types of applications
![Page 3: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/3.jpg)
Drilling Permits and Well Compliance– Advanced
3
![Page 4: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/4.jpg)
Drilling Permits and Well Compliance– Advanced
Stacked Laterals- how to qualify
•2 or more horizontal drainhole wells within lease/pooled unit in the correlative interval.•Horizontal drainholes are drilled from different surface locations.• The first well drilled establishes the parameters that the subsequent wells will be tested against.
Make sure your field rules allow for Stacked Laterals and if so what well spacing is required.
4
![Page 5: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/5.jpg)
Drilling Permits and Well Compliance– Advanced
Stacked Laterals- how to qualify cont.
•Each surface location must be permitted separately and assigned its own API number.
•Plat must clearly show all wellbores attempting to qualify for Stacked Lateral status.
•To be considered a “regular location” each well must comply to any minimum lease or between well spacing rules
5
![Page 6: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/6.jpg)
Drilling Permits and Well Compliance– Advanced
Stacked Laterals why all the fuss?
• For each well that qualifies as a Stacked Lateral well your overall well count will not increase when the RRC tests your lease for density exceptions.
•Remember that the wells must be completed in the same regulatory field to qualify as a stacked lateral.
6
![Page 7: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/7.jpg)
Drilling Permits and Well Compliance– Advanced
Stacked Laterals potential problem?
•If your well, when completed, does not remain within the established parameters of the “record well” then you will be required to amend the permit to reflect its new status and count this well against your total well count. If you exceed density then an exception to SWR 38 will be needed.
7
![Page 8: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/8.jpg)
Drilling Permits and Well Compliance– Advanced
8
![Page 9: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/9.jpg)
Drilling Permits and Well Compliance– Advanced
9
![Page 10: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/10.jpg)
Drilling Permits and Well Compliance– Advanced
PRODUCTION SHARING AGREEMENTSSupporting Documentation:
•Authorization letter to include % of participation•PSA-12 form showing acreage to be assigned to proposed well•Plat showing the external boundary of all tracts contributing acreage to the proposed well•Well allocation worksheet
10
![Page 11: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/11.jpg)
Drilling Permits and Well Compliance– AdvancedPRODUCTION SHARING AGREEMENTSSupporting Documentation:Authorization letter•Contractual right to develop all proposed tracts
•To be approved administratively minimum of 65% of mineral and working interest owners must be signed to agreement
•If less than 65% sign-up then request to set up application for hearing
11
![Page 12: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/12.jpg)
PSA/ALLOCATION AUTHORITY LETTER
12
![Page 13: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/13.jpg)
Drilling Permits and Well Compliance– Advanced
PRODUCTION SHARING AGREEMENTSSupporting Documentation:PSA-12 and Plat•PSA-12 form filled out showing all tracts and acreage involved
•Plat that shows the entire boundary of all contributing tracts
•All supporting lease/unit line calls should be to exterior boundary of the contributing tracts
•Any un-leased tracts within contributing tracts should be identified
13
![Page 14: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/14.jpg)
14
![Page 15: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/15.jpg)
Drilling Permits and Online Filing - Advanced
15
![Page 16: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/16.jpg)
Drilling Permits and Well Compliance– Advanced
PRODUCTION SHARING AGREEMENTSSupporting Documentation:Acreage allocation work sheet•Breakdown of activity for each contributing lease/pooled unit
•If any contributing lease/pooled unit is over assigned then a statement as to how the deficiency will be resolved
•If SWR 38 density exception is required then application must follow procedures set forth in the rule
16
![Page 17: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/17.jpg)
W-1 ACREAGE ALLOCATION WORK SHEET
17
![Page 18: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/18.jpg)
Drilling Permits and Well Compliance– Advanced
18
![Page 19: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/19.jpg)
Drilling Permits and Well Compliance– Advanced
19
![Page 20: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/20.jpg)
Drilling Permits and Well Compliance– Advanced
What is the difference between a “PSA” well and an “Allocation” well?
1. On tracts that you have a valid lease in place an “Allocation”well permit will allow you to get a drilling permit application without the qualifier that you have to provide for a “PSA” wellthat 65% of both mineral and working interest owners havesigned an agreement as to how production proceeds will be divided.
2. What it doesn’t allow you to do is incorporate tracts into your“Allocation” unit that the wellbore does not traverse.
20
![Page 21: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/21.jpg)
Drilling Permits and Well Compliance– Advanced
PSA or ALLOCATION WELLSSWR Exceptions: Lease line•Allocation well application will always require an exception•PSA application will require an exception if there is less than 100% participation
Between Well•Normal notification procedures will be followed
Density Exception•Unless specified in the field rules normal notification and data requirements will be followed
21
![Page 22: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/22.jpg)
Drilling Permits and Well Compliance– AdvancedPSA or ALLOCATION WELLS -Example
22
TRACT B
TRACT A
![Page 23: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/23.jpg)
Drilling Permits and Well Compliance– AdvancedPSA or ALLOCATION WELLS -Example
23
![Page 24: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/24.jpg)
Drilling Permits and Well Compliance– AdvancedPSA or ALLOCATION WELLS -Example
24
![Page 25: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/25.jpg)
Drilling Permits and Well Compliance– AdvancedPSA or ALLOCATION WELLS -Example
25
![Page 26: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/26.jpg)
Drilling Permits and Well Compliance– AdvancedPSA or ALLOCATION WELLS -Example
26
![Page 27: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/27.jpg)
Drilling Permits and Well Compliance– AdvancedPSA or ALLOCATION WELLS -Example
27
![Page 28: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/28.jpg)
Drilling Permits and Well Compliance– AdvancedPSA or ALLOCATION WELLS -Example
28
![Page 29: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/29.jpg)
Drilling Permits and Well Compliance– Advanced
Would you like to make your life a little easier and help decrease the processing time of both your drilling permits and completions?
29
![Page 30: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/30.jpg)
Drilling Permits and Well Compliance– Advanced
30
![Page 31: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/31.jpg)
Contact InformationFor further questions concerning Drilling
Permits please contact:
Lorenzo GarzaPhone: 512-463-2184
Email: [email protected]
Valerie AtkinsPhone: 512-463-6979
Email: [email protected] 31
![Page 32: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/32.jpg)
Drilling Permits and Well Compliance– Advanced
32
Now Presenting Mr. Joe Stasulli
![Page 33: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/33.jpg)
Railroad Commission of Texas
Operator Procedures for PSA and Allocation Wells
33
![Page 34: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/34.jpg)
Drilling Permits and Well Compliance– Advanced
34
Completion Report (G1/W2) must include:
• (SA) does NOT need to be included in the lease name.
• Sharing Agreement information must be referenced in the G1/W2 remarks.
• Detailed Sharing Agreement information must be attached to the completion packet.
![Page 35: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/35.jpg)
Drilling Permits and Well Compliance– Advanced
35
![Page 36: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/36.jpg)
Drilling Permits and Well Compliance– Advanced
36
![Page 37: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/37.jpg)
Drilling Permits and Well Compliance– Advanced
37
![Page 38: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/38.jpg)
Drilling Permits and Well Compliance– Advanced
38
![Page 39: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/39.jpg)
Railroad Commission of Texas
Operator Procedures for Stacked Laterals
39
![Page 40: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/40.jpg)
Drilling Permits and Well Compliance– Advanced
40
• The first well of a stacked lateral is set up and processed in the same manner as any regular producing well. SL is NOT required to be part of the lease name.
• All the standard information should be filed for this well, drilling permit, completion, and associated forms.
![Page 41: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/41.jpg)
Drilling Permits and Well Compliance– Advanced
41
![Page 42: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/42.jpg)
Drilling Permits and Well Compliance– Advanced
42
• Any additional lateral wells (2nd, 3rd, 4th) must have an approved drilling permit and completions filed.
• The letters SL (Stacked Lateral) should be included in the well number if feasible.
• The drilling permit (W-1) and completion (G-1/W-2) remarks should reference that this is a stacked lateral and report all Railroad Commission identification numbers associated with all wells that are part of the stacked lateral. Use the drilling permit numbers if an RRC ID has not been assigned.
![Page 43: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/43.jpg)
Drilling Permits and Well Compliance– Advanced
43
![Page 44: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/44.jpg)
Drilling Permits and Well Compliance– Advanced
44
![Page 45: Presentation Overview](https://reader036.fdocuments.in/reader036/viewer/2022081519/56813342550346895d9a383f/html5/thumbnails/45.jpg)
Drilling Permits and Well Compliance– Advanced
45