COLLABORATECOM-2013, Austin, Texas, United States, 20 October 2013
Presentation Orebro-in-austin-october-2014
-
Upload
bjoern-sundin -
Category
Environment
-
view
159 -
download
0
description
Transcript of Presentation Orebro-in-austin-october-2014
orebro.seorebro.se It can be done in Örebro. Inner-city-canoeing for example.
Fo
to: D
an L
indberg
orebro.seorebro.se
70 percent of the Swedish population within 300 kilometers.
orebro.seorebro.se
In Örebro the year has 26 extra days.
BeforeAfter
orebro.seorebro.se
Nature for all• Disabled
• Elderly
• Children
• New swedes
• Close to home
Tourism• Help people find their way
• Beautiful scenery,
information
Biologicaldiversity
• Protect species-richenvironment
• Restoration
• Green structure
orebro.seorebro.se
Bjuda in besökare
Tourism• Help people find their way
• Beautiful scenery,
information
orebro.seorebro.se
Nature for all• Disabled
• Elderly
• Children
• New swedes
• Close to home
orebro.seorebro.seFoto: Torbjörn Arvidsson
Fo
to: T
orb
jörn
Arv
idsson
Foto: Torbjörn Arvidsson
Biologicaldiversity
• Protect species-richenvironment
• Restoration
• Green structure
orebro.seorebro.se
High energy standards when renovating existing buildings
After: 66 kWh/sq.metre = 63% reduction Before: 170 kWh/sq.metre
orebro.seorebro.se
Municipal housing company
as a forerunner22 300 flats, 1 100 commercial premises
Own strict environmental targets
Instruction from the owner, but also a way
to be attractive as a company
orebro.seorebro.se
A heat camera can reveal interesting facts…
orebro.seorebro.se
Demand side management
New equipment
(showers, lighting,
laundry)
Individual metering, you
pay for what you use
(water, electricity, but also
laundry).
orebro.seorebro.se
• Wall material optimized both for insulation and
humidity – nice indoor air quality
• Underfloor heating and heat pumps for
heating and cooling
• Solar heating collectors
• Energy-efficent household appliances
• Insulating windows
• Individual metering of water
• Slow and ”sleeping” elevators
• Energy-efficient LED lighening
Efficiancy in new ”normal” buildings (built 2011)
Energy demand 23 kWh/sq.metre
= 80% below standard
orebro.seorebro.se
Simplified, rugged & industrial
orebro.seorebro.se
Internet accessHigh speed Internet connection100%
Proportion who use60%
Services:
Stadsnät : 1 GBitComhem : 200 MbitADSL : 60 MBit
orebro.seorebro.se
orebro.seorebro.se
orebro.seorebro.se
Car sharing offered to tenants
Cars are normally parked 96 percent of the time.
They can be used much more efficiently!
Through an economic association 120 households share
12 cars.
Reduced costs, reduced car use, and reduced demand
for parking.
orebro.seorebro.se
Citybuses on biogas (2009) – reduction of 14 000 tonnes per year
orebro.seorebro.se
Only renewable electricity used by the municipality by 2020
orebro.seorebro.se
Increase the use
of renewable
electricity
• Our climate plan says that we need to increase production of renewable electricity by 115 GWh/yr.
• This translates into 30 large wind turbines.
• A new energy company is formed by the municipality. Private companies, individuals and public bodies will be offered shares.
orebro.seorebro.se
Political request in 2009:
”We want Örebro to be a forerunner among
Swedish municipalities.”
• By 2020 climate impact from all activities within
the border of the municipality should be reduced
by 40%, compared to 2000 level (50% for the
municipality itself).
• The municipality should be carbon neutral by
2050.
orebro.seorebro.se
orebro.seorebro.se
Climate impact caused by acitivities within
municipality borders 2008
Road
vehicles
17%
Electricity
use
31%
Heating
7%
Air travel
7%
Food
consump-
tion
18%
Imported
products
(net)
20%
Total: 841 000 tons CO2
or 6.4 tons per inhabitant
All emissions Our mark off
Total: 1 500 000 tons CO2
or 11.4 tons per inhabitant
Electricity
use
56%
Road
vehicles
31%
Heating
13%
orebro.seorebro.se
-7,6%
39
34
37 47
10 12 55
0
100
200
300
400
500
600
700
800
900
1 000
Klim
atbe
last
ning
20
00
Åtg
ärde
r 200
0-20
08
Klim
atbe
last
ning
20
08
Ene
rgie
ffekt
ivis
erin
g
Kon
verte
ring
av o
lja
Åtg
ärde
r i
fjärr
värm
esys
tem
et
Ny
förn
ybar
ene
rgi
Tran
spor
ter e
gen
verk
sam
het
Tran
spor
ter l
okal
a åt
gärd
er
Tran
spor
ter
natio
nella
sty
rmed
el
Klim
atbe
last
ning
20
20
1000
ton
kold
ioxi
d
Whole municipality: -40% per cap. 2000-2020
Measures in the energy sector Measures in the
transport sector
orebro.seorebro.se
4,32,2
5,32,7
170,9
8,7
-11%
0
20
40
60
80
100
120
140
Klim
atbe
last
ning
2000
Åtg
ärde
r 20
00-2
008
Klim
atbe
last
ning
2008
Ene
rgie
ffekt
ivis
erin
g
Kon
vert
erin
g av
olja
Ny
förn
ybar
ene
rgi
Tjän
ster
esor
+
arbe
tsre
sor
Kol
lekt
ivtr
afik
Tran
spor
ter
+ öv
rigt
Kon
sum
tion
livsm
edel
Klim
atbe
last
ning
2020
tuse
n to
n ko
ldio
xid
Own organisation: -50% per cap 2000-2020
FoodEnergy Transportation
orebro.seorebro.se
Own organization 2000-2011climate impact per inhabitant
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
0,90
1,00
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Livsmedel
Transporter
Energi
- 22%
-50%
Food
Transport
Energy
orebro.seorebro.se
The geographical area 2000-2011
0
1
2
3
4
5
6
7
8
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
ton
pe
r in
vå
na
re
Transporter
Energi
- 13%
-40%
To
n p
er
inh
abita
nt
orebro.seorebro.se
Vi går vidare: fossilfri kommun år 2050Half the population within 3 km from the city centre
orebro.seorebro.se
Long tradition as a "cycling city"
219 km cycle paths
25% share of cyclists in modal split
50% drop in cycling during winter
92% of adults have access to a bicycle
33% share of cyclists in central city
orebro.seorebro.se
2011
Modal split Örebro MunicipalityTarget 2020
orebro.seorebro.se
”Bike lanes shows that
people on a 30 dollar
bike are worth as much
as those in a 30.000
dollar car.”
Enrique Penalosa
orebro.seorebro.se
Data show where
people live and where
they work
orebro.seorebro.se
Relations with more than
300 communters each
day
orebro.seorebro.se
Cycle network in four layers1. High quality cycling corridors –
mainly for commuters travelling at high speed.
2. City network and regional routes –high availability and secure travellingbetween different parts of the city, also connections to suburbs.
3. Local network – designed for safetransfer to local destinations. Children and elderly are importantgroups.
4. Recreational routes – leisure cycling
for the citizens and visitors.
orebro.seorebro.se
High quality cycling corridors:
Pedestrians and cyclists are separated Continuous cycle paths –cars have to give way
orebro.seorebro.se
Communication & PR• Cycling map
(printed and pdf)
• Cycling school
• Healthy cyclists campaign
• Bicycle counters
• Cycling advisorycommittee
• Let bikes be visible
orebro.seorebro.se
Political organisation
Elec tion Committee
City Aud it
Committee for Adult Education and
Occupationa l Rehab ilita tion
Soc ia l Services Committee W est
Soc ia l Services Committee East
Care and Services Committee W est
Care and Services Committee East
Committee for the Disab led
Chief Guard ian’s Committee
Co mmittee f o r
So Cia l Wel f a r e
Secondary Education Committee
Education Committee North-East
Education Committee North-West
Education Committee South-East
Education Committee South-West
Östernärke Local
Committee
Build ing Committee
Leisure and Tourism Committee
Culture and Citizens Committee
Environmenta l Committee
Technica l Services Committee
Tysslinge Loca l Committee
Glanshammar Loca l Committee
Co mmittee f o r
Co mmUNitY Pl a NNiNG
CitY exeCUtiv e
Co mmittee
Co mmitttee f o r
Chil dr eN a Nd edUCa tio N
CitY Co UNCil
orebro.seorebro.se
How the money is used in the municipality
Allocation of 100 sek 2013
Compulsory education
Care of elderly
Preschools
The disabled
Social services
Upper-secondary education
Leisure and culture
Infrastructure and protection
Other educational activities
Business activities
Employment programmes and receiving refugees
Political operations
21 kr
21 kr
14 kr
11 kr
10 kr
8 kr
6 kr
4 kr
2 kr
1 kr
1 kr
1 kr