31
PRESENTATION ON WATER TREATMENT PLANT,KOTA (Rajasthan) PRESENTED BY Er. ANOOP KUMAR ,PUNE (Maharashtra)

Transcript of Presentation on water treatment plant

Page 1: Presentation on water treatment plant

PRESENTATION ON WATER TREATMENT

PLANT,KOTA (Rajasthan)

PRESENTED BY Er. ANOOP KUMAR,PUNE (Maharashtra)

Page 2: Presentation on water treatment plant

AIMPROCESS AUTOMATIONPLCSCADAEPANET SOFTWAREOVERVIEW OF PROJECTINTAKESEDIMENTATION TANKWTPCWRPHASE 1PHASE 2GSM/GPRS SYSTEM ARCHITECTURE WATER DISTRIBUTION PROCESSEXECUTED PROJECT

CONTENTS

Page 3: Presentation on water treatment plant

AIM

To provide drinking water facilities in 60 problematic villages and 21 other habitation. Take water from river chambal and sent to INTAKE at Akelgarh.To provide 1.5 MGD @ 22 hours with 4 nos filter beds size each 4.20mX3.05m.

This project is divided into two phase,first is CWPH that provide water to four ESR & second is for 16 ESR. This project is fully automated where all Mechanical,Electrical & Instrumentation equipment are controlled through plc. In control room that located at pratapgargh all process are shown on SCADA. All data/information of equipments are send via GSM/GPRS.

Page 4: Presentation on water treatment plant

Why do we need automation WTP/STP/ETP need a specific time base logic that can

never achieved with accuracy by manual operation. In order to achieve consistent quality of water in

every cycle, parameter of water quality-PH, DO, BOD, chemical oxygen demand need to be maintain.

Operating cost of plant reduces with automation as few/single operator can command fully automatic plants.

Using remote monitoring & control feature we can plant shutdown or at least reduces diagnostic time.

PROCEES AUTOMATION

Page 5: Presentation on water treatment plant

PLC The PLC (Programmable Logic Controller) is a purpose-built

machine control computer designed to read digital and analog inputs from various sensors.

Why do we need PLC We have to designed STP/WTP/ETP controller with all

required facilities and then need to install and start only. In electrical control panel auto-manual switches & its

associated wiring can be minimized as we have auto-manual mode in our controller in built-saves cost and space.

In manual & auto mode in our controller each tank level/pressure/flow/pump status etc can be monitored on LCD screen.

Very low cost solution through PLC based system.

Page 6: Presentation on water treatment plant

SCADA SCADA (supervisory control and data acquisition) is

a system operating with coded signals over communication channels so as to provide control of remote equipment.

Why do we need SCADA In control room single engineer can see status of valves,

pumps, flow-meter etc. & operate manually also. The data can be display in anyway the user requires. The computer can record and stored a very large amount

of data.

Page 7: Presentation on water treatment plant

EPANET SOFTWARE The design of cluster distribution mains has been done

based using EPANET software.  It performs extended-period simulation of hydraulic and

water-quality behavior within pressurized pipe networks. EPANET provides an integrated environment for editing

network input data, running hydraulic and water quality simulations, and viewing the results in a variety of formats.

It allow users to analyze the movement of a reactive or non-reactive tracer material which spreads through the network over time. 

Page 8: Presentation on water treatment plant

OVERVIEW OF PROJECT

INTAKE SEDIMENTATION TANK

WTP

CWR

LT

LT

LT

LT

NAYAGAWN JAGPURA CABLE NAGAR KASAR

IPS AT RANPUR

IPS AT MANDANA

LT

ESR n

LT

ESR n

FM

TO DIFFERENT VTC

FM

FM

FM

FM

FM

FM

FM

TO DIFFERENT VTC

TO DIFFERENT VTC

TO DIFFERENT VTC

FM

FM

FM

FM

TO DIFFERENT VTC

TO DIFFERENT VTC

.,.-.,--.-.-.-.,.-.,--.-.-.-.,.-.,--.-.-.-.,.-.,--.-.-.-.,.-.,--. .,.-.,--.-.-.-.,.-.,--.-.-.-.,.-.,--.-.-.-.,.-.,--.-.-.-

-.,--.-.--.,--.-.--.,--.-.--.,--.-.--.,--.-.-

CHAMBAL RIVER

PRATAPGAH

Page 9: Presentation on water treatment plant

INTAKE It is proposed at Akelgarh where two (1w&1s) Submersible /

Vertical turbine pumps is taken. These Pumps will feed water from intake well to Sedimentation

Tank. The Borabas- Mandana Water Supply Project from Chambal River

comprises:- physical components Institutional components The physical components include water supply infrastructure

(intake pumping station, raw water system, treatment, storage and distribution facilities)

The institutional components include the administration arrangements, community participation, training programs and health educational programs.

Page 10: Presentation on water treatment plant

INTAKE AT AKELGARH

P1

P2

PG

PT

LT

BVF-1

BVF-2

PUMP P1 & P2Discharge-95.2 LPSHead-51 MKW-74 kwTYPE-SUBMERSIBLE PUMP

FM

GV:SLUICE VALVE 250NB BY PASS

250NB -ELECTROMAGNETIC FLOW METER

EXISTING INTAKEWELL AT AKELGARH

To Sedimentation Tank

PLC

Page 11: Presentation on water treatment plant

SEDIMENTATION TANK

There is 5-6 no of sedimentation tank whose capacity is 1.5 MGD water as requirement.

Here Alum/pac solution tank has been taken for dosing purpose.

SEDIMENTATION TANK

From INTAKE

LT

Alum/pac solution Tanks (2 nos)

Alum/pac solution Tanks (2 nos)

To WTP

Page 12: Presentation on water treatment plant

WTP The existing Water Treatment Plant (WTP) is of cap 1.5 MGD

@ 22 hours with 4 nos filter beds size each 4.20mX3.05m. At WTP one new PLC room is proposed for controlling all

valves and other digital equipment. Here two (1w & 1s) clariflocculator has been proposed just

before filter house for proper mixing of water. In filter house four sand filter bed is available to make water

pure. Then pure/clear water get dosed with alum/pac solution. It has backwash tank with 4 nos (2w & 2s)of blower that

blow water to filter bed for clear suspended solid present in sand filter bed.

Page 13: Presentation on water treatment plant

Backwash Tank

LT

LT

From Intake

Chlorine Mixing Tank

Post Chlorination

PAC Solution Tank - 1

PAC Solution Tank - 2

PAC Solution Tank - 3

PAC Solution Tank - 4

To CWR

Filter House

Parshall Flume

Parshall Flume

WTP

Clarifier

Clarifier

From Intake

Page 14: Presentation on water treatment plant

FILTER HOUSE

...,…,…,…,…,…,,..,

...,…,…,…,…,…,,...,

...,…,…,…,…,……,.

...,…,…,…,…,…..,..,

START/STOP

START/STOP

80 Dia CI pipe

Clorine mixing tank

From clarifier

Water blower (1w & 1s)

PLC

Page 15: Presentation on water treatment plant

CWR There is an existing CWR at Akelgarh which is not in use

by Kota Water Supply Scheme. It is proposed to use this CWR.

Storage capacities of clear reservoir are based on 2 hours storage capacity of daily demand.

Here 3 nos of CWR are proposed, one at Treatment Plant Head Works, Akelgarh & other two at Ranpur & Mandana respectively.

Provision for sump in CWR has been taken with 2 nos (1W+1S) dewatering pumps for cleaning.

Water from this pump house shall be pumped to Cluster ESRs.

Page 16: Presentation on water treatment plant

CWR

Clear Water

Reservoir

LT

Incoming line from

WTP

Future Pump

M

P3

MP4

M

M

PT

PG

FM

300NB

300NB

CLEAR WATER RISING MAIN DI 350mm Dia

GV:SLUICE VALVE 250NB BY PASS

BVF-1

BVF-2 PLC

Page 17: Presentation on water treatment plant

CWR AT WTP

LT

ESR 1FM

FM

Nayaganv

LT

ESR 1FM

FM

Cable nagar

ESR 1FM

FM

Jagpura

ESR 1FM

FM

KASAR

PHASE 1

FM

Rojhri vill.

Awanli Vill. Lakhwa Retya

ChowkiBor Ke Kui Vill.

Alniya Vill.

Rankyakheri Vill.Cabel Nager

Khanpuriya

Daulatganj

FM

92.44 LPS/167 m

LT

LT

Village Transfer Chamber (VTC)

Page 18: Presentation on water treatment plant

PHASE 2CWR AT WTP

IPS AT RANPUR

IPS AT MANDANA

Dharampura

Borabas

Balinda

Amarkuan

Ranpur

Dholiya

Baorikhera

ShohanpuraMandana Mandaliya

Gopalpura DaraTholpura

CLUSTER CLUSTER

CLUSTERCLUSTER

CLUSTERCLUSTER

CLUSTER

CLUSTER CLUSTER

CLUSTER

CLUSTER

CLUSTER

Page 19: Presentation on water treatment plant

IPS AT RANPUR

Clear Water

Reservoir/ Sump

LT

M

BVF-1

BVF-2

M

M

PG

PT

FM

GV:SLUICE VALVE 250NB BY PASS

TO RANPUR CLUSTER 150 NB

RANPUR CLUSTER

BVF-5

M

DOLIYA CLUSTER

PG

PT

FMGV:SLUICE VALVE 250NB BY PASS

AMARKUAN DOLIYA CLUSTER150NB

M

MPT

PG

FMGV:SLUICE VALVE 250NB BY PASS

BALINDA & BORABASS 200NB

Space for future Pump

BVF-3

BVF-4

BVF-6

100 NB

150 NB

200 NB

M

PLC

Page 20: Presentation on water treatment plant

IPS AT MANDANA

Clear Water

Reservoir/ Sump

LT

M

BVF-1

BVF-2

M

M

PG

PT

FM

GV:SLUICE VALVE 250NB BY PASS

TO GOPALPURA,NAYAGANV, DARA, SOHANPURA CLUSTER

GOPALPURA, SOHANPURANAYAGANV, DARA CLUSTER

BVF-5

M

M

MANDALIYA& MANDANA EXISTING ESRCLUSTER

PG

PT

FMGV:SLUICE VALVE 250NB BY PASS

TO MANDALIYA, MANDANA EXISTINGESR CLUSTER

M

MPT

PG

FMGV:SLUICE VALVE 250NB BY PASS To PROPOSED ESR AT

MANDANA

Space for future Pump

BVF-3

BVF-4

BVF-6

100 NB

150 NB

200 NB

PLC

Page 21: Presentation on water treatment plant

CONTROL ROOM AT PRATAPGARGH

PLC

SCADA

WTP

CWR

LT

ESR 1FM

FM

LT

ESR 2FM

FM

LT

ESR 3FM

FM

LT

ESR 4FM

FM

LT

ESR 1FM

FM

LT

ESR 2FM

FM

LT

ESR 3FM

FM

LT

ESR 13FM

FM………… …

LOCAL PLC

LOCAL PLC

GSM/GPRS ARCHITECTURE

GSM

Page 22: Presentation on water treatment plant

PROJECT EXECUTED

Water treatment project of Jodhpur is completed by Annanya Interface & Control PVT.LTD. (Pune)Here some pictures of that project contain:- 33 Kv switchyard at WTP Reservoir at RWPS Pumping station Clariflocculator SCADA screen for CWPS SCADA screen for filter bed SCADA reading PLC Panel

Page 23: Presentation on water treatment plant

33 KV SWITCHYARD AT WTP

Page 24: Presentation on water treatment plant

RESERVOIR AT RAW WATER PUMPING STATION

Page 25: Presentation on water treatment plant

PUMPING STATION

Page 26: Presentation on water treatment plant

CLARIFLOCULATOR

Page 27: Presentation on water treatment plant

SCADA SCREEN FOR CLEAR WATER PUMPING STATION

Page 28: Presentation on water treatment plant

SCADA SCREEN FOR FILTER BED

Page 29: Presentation on water treatment plant

SCADA READINGS

Page 30: Presentation on water treatment plant

PLC PANEL

Page 31: Presentation on water treatment plant

THANKYOU