Presentation on Industrial Water Circulation System

download Presentation on Industrial Water Circulation System

of 19

Transcript of Presentation on Industrial Water Circulation System

  • 7/29/2019 Presentation on Industrial Water Circulation System

    1/19

    Click to edit Master subtitle style

    2/6/13

    Cooling Water SystemFSPD HYDRO ENGG. DEPARTMENT

  • 7/29/2019 Presentation on Industrial Water Circulation System

    2/19

    2/6/13

    Water requirement in industries

    Water is one of the important utilities for most of theindustrial activities.

    Water is required for the following purposes

    Equipment cooling

    Process

    Service/flushing

    Drinking

    Fire Fighting FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    3/19

    2/6/13

    Why cooling water system

    All heat generated in the process and equipments cannot be

    converted into work. A large portion of it has to be rejected.

    The heat rejection is done through cooling water system

    Heat is rejected to atmosphere by evaporating a portion of

    cooling water in the cooling tower

    Fresh water will be added to the system to compensate the

    losses due to evaporation in the system.

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    4/19

    2/6/13

    Coolingwater

    The term cooling water is applied where water is

    circulated through equipment to absorb and carry

    away the heat. This definition includes:-

    Industrial heat exchange operations,

    Air conditioning and refrigeration system,

    Engine jacket cooling systems including power plants.

    In the cooling process, temperature of the cooling

    water is raised, depending on the cooling water flow.FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    5/19

    2/6/13

    Cooling water systems

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    6/19

    2/6/13

    Once-Through System

    In this system, water passes through the equipment only once

    and the warm water is usually discharged to its original source

    from which it is drawn.

    RIVER FLOW

    APPLICATION

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    7/192/6/13

    Once-Through System

    Advantages System is very simple

    During cooling, water does not evaporate hence the cold and warmed watercharacteristics does not change.

    System has less potential for scale formation and corrosion

    Cooling towers, Hot water sump, etc. can be avoided in this system.

    Disadvantages

    Plant should be located near to the water body

    Discharging the warmed water to the water body raises the temperature,affecting the aquatic life and increasing the stringent restrictions on thermaldischarge

    Contamination of large amount of water which cannot be treated efficiently oreconomically. FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    8/192/6/13

    Need for Change

    High competition in water demand.

    Scarcity of clean water.

    High cost of water.

    Increasing awareness towards water pollution

    Introduction of statutory regulations for waste discharge.

    Research & Development of water chemistry and Water

    treatment technology. FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    9/19

    2/6/13

    Recirculating cooling water system

    In this system, same water is recirculated repeatedly aftercooling in the cooling tower

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    10/19

    2/6/13

    Non Contact Open Circuit Cooling System

    COLD WATERSUMP

    MAKE-UP

    CONSUMER

    HOT WATER

    SUMP

    COOLINGTOWER

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    11/19

    2/6/13

    Non Contact Open Circuit Cooling System

    In this system water is circulated through

    the equipment or heat exchangers to a

    cooling tower and then returned to theequipment or heat exchanger.

    The recirulating water is always in contactwith air/atmosphere in a cooling tower

    where evaporation takes place. As a resultFSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    12/19

    2/6/13

    Contact Open Circuit Cooling System

    SUMPMAKE-UP

    CONSUMER

    TREATMENTFACILITIES

    COOLINGTOWER

    EOHT

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    13/19

    2/6/13

    Contact Open Circuit Cooling System

    In this system the cooling water is sprayed on the

    equipment/ product being cooled and it is in direct

    contact with the equipment/product as well as

    atmospheric air for heat rejection

    Further cooling water will be treated to the quality to

    suit the equipment requirement and recirculated.

    Examples

    Blast furnace gas cleaning system

    BOF Gas Cleaning systemFSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    14/19

    2/6/13

    Closed Circuit Cooling System

    COLD WATERSUMP

    MAKE-UP

    CONSUMER

    COOLINGTOWER

    OVERHEADTANK

    SOFT/DMWATER PLANT

    MAKE-UP

    CHEMICALDOSING

    HEATEXCHANGER

    SOFT/DMWATER SUMP

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    15/19

    2/6/13

    Closed circuit recirculation system

    Primary circuit

    Cooling water in a closed recirculation system remains completely

    confined within the entire system including pipes heat exchangers.

    Secondary circuit The heat absorbed by the primary circuit fluid is transferred to

    secondary circuit water in the heat exchangers. The secondary water is

    recirculated in the cooling tower where heat is rejected by evaporation

    of the secondary water.

    Examples

    Blast Furnace Shell Cooling system

    BOF gas cooling system. FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    16/19

    2/6/13

    Emergency water system

    Any steel plant or other process plant is always susceptible

    for various types of emergency.

    Facilities provided for tackling emergency situations are:-

    Emergency Over Head Tank

    Diesel Pumps

    Generally, emergency water is supplied for a duration 15-20

    mins at 30-40 % of the normal water circulation flow rate.

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    17/19

    2/6/13

    Cooling Water Treatment

    Both open and closed recirculation cooling water systemexperience all sorts of problems associated with cooling

    water like scale formation, corrosion, and micro

    biological fouling (only in open cooling system).

    The cooling water is treated with various types of

    chemical in order avoid above problems and to protect

    heat transfer efficiency of the system

    Chlorine is one of the common Biocides used to control

    biological fouling.

    For prevention of scale formation and corrosion of the

    material scale inhibitors like sul huric acid sodiumFSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    18/19

    2/6/13

    Major activities in detail engg. of water circulation system

    Assignment from various technologists section indicating the

    water requirement(industrial water, soft water, DM water)

    including pressure and temperature etc.

    Based on the above water balance diagram will be prepared

    indicating inflow & out flow , losses in system and fresh water

    requirement as make up water.

    Fixing up capacity of pumps, heat exchangers, cooling towers,

    filtration system, soft water/DM plant etc.

    FSPD HYDRO

  • 7/29/2019 Presentation on Industrial Water Circulation System

    19/19

    2/6/13

    Major activities in detail engg. of water circulation system

    Preparation of layout drawings after fixing size of the pump house,

    cooling tower and other units.

    Issue of procurement specification for various equipment.

    Issue of assignments to various section for planning their facilities forwater circulation system.

    Finalising the layout after receiving the input from the other sections

    like size of the buildings for electrical, instrumentation, ventilation,

    etc.

    Issue of assignments for civil and structural buildings as per the

    finalised layout

    Preparation of piping detail engineering drawings for execution at site.

    FSPD HYDRO