Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland [email protected] Page...

22
Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland [email protected] Page 1 Introduct ion TEAMwork TEAMwork Project (IST-2000- 28162) Welcome to Review Meeting 25 June 2002, Valladolid, Spain Brian Foley Co-ordinator TEAMwork Project (IST-2000-28162)

Transcript of Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland [email protected] Page...

Page 1: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 1

Introduction TEAMwork

TEAMwork Project (IST-2000-28162)

Welcome to Review Meeting

25 June 2002,

Valladolid, Spain

Brian FoleyCo-ordinator TEAMwork Project (IST-2000-28162)

Page 2: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 2

Introduction TEAMwork

Structure of Presentation

• Presentation of meeting agenda

• Introduction to TEAMwork project and partners

• Overview of progress since 1 July, 2001

• Future work

Page 3: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 3

Introduction TEAMwork

AGENDA

1. Presentation on the overall project progress                   (TecNet) (20’)

2. Presentation on Deliverable: D.2 - Methodology (ISCN) (15’)

3. Presentation on Deliverable: D.3 - Technology  (ISCN) (15’)

4. Demonstration of configured NQA(ISCN) (15’)

5. Private meeting for Reviewers (30’)

  

Page 4: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 4

Introduction TEAMwork

AGENDA (Continued)

6. Presentation on the Validation and Evaluation (WP4) plan (FGUVA) (15’)

7. Presentation on the planned social analysis (MTA SZTAKI) (15’)

8. Presentation on the organisation of the trials (WP4):8.1  Software Engineering QinetiQ and

GMV (20’)

8.2 Public Service Organisation FGUVA and APS (20’)

8.3 Research Network Domain TecNet (15')

9. Private meeting for Reviewers (30’)

Page 5: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 5

Introduction TEAMwork

Introduction to TEAMworkThe Objectives

• Integration of three innovative approaches into a ‘complete’

solution

• Application in three e-working domains

• Role-based team-working methodology for effective

management and motivation of e-working teams

• Technology platform – Adaptable and

Configurable for effective ‘virtual’ decision-making

• Social skills analysis of user behaviour -

develop a skills solution

Page 6: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 6

Introduction TEAMwork

Introduction to TEAMworkThe Methodology

A Methodology to improve the efficiency and

effectiveness of organisations by

• Goal Analysis

• Efficient Team-Work

• Improved Infrastructure

Aiming at a Continuous Learning Process and Organisation.

http://www.victory-group.net

BESTREGIT

Page 7: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 7

Introduction TEAMwork

Introduction to TEAMworkThe Technology

Web-Server

(Hyperwave)

(ISCN Partners)

Public Service Organisations

ResearchNetworks

NQA Application Software

Knowledge Management

Software Engineering

A Platform Adaptable and Configurable without Change of Code

Page 8: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 8

Introduction TEAMwork

Introduction to TEAMworkThe Social Dimension

• Identify required skills, based on user behaviour and

analysis:

- Social skills

- Communication skills

• Cultural Differences

• Conflict Resolution

•Group Dynamics

Page 9: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 9

Introduction TEAMwork

Introduction to TEAMworkThe Project Structure

Integrate Technology +

Methodology +

Skills Solution

Adapt

Trials in three e-working environments

ConfigurableFeedback

DisseminationExploitation

Page 10: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 10

Introduction TEAMwork

Introduction to TEAMworkThe Project Partnership

Provider / Support Team

ISCN (Irl.)

Hyperwave (D)

User Domains

•Software Engineering

- GMV (E)

- QinetiQ (UK)

•Public Service

- FGUVA (E)

- APS (A)

•Research Networks

- TecNet + IOT’s (Irl.)

- Danube (A)

- University of Maribor (Slo)

Support

Social Analysis Team

MTA SZTAKI (HU)

BisDato (A)

Feedback

Page 11: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 11

Introduction TEAMwork

Introduction to TEAMworkProject Management Structure

Management Structure based on system of Contractors and Members

ISCN

TecNet

FGUVA

MTA SZTAKI

University of Maribor

Danube

QinetiQ

GMV

APS

Bisdato

Hyperwave

Page 12: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 12

Introduction TEAMwork

Progress Highlights (July 2001 – June 2002)Workpackage Description

• WP1 Project Management

• WP2 Teamwork Analysis

• WP3 NQA Installation and Adaptation

• WP4 Validation and Evaluation

• WP5 Verification and Refinements

• WP6 Dissemination

• WP7 Exploitation

• WP8 Peer Review and Assessment

Page 13: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 13

Introduction TEAMwork

Progress Highlights(July 2001 – June 2002)

• WP1 (Project Management)– Successful kick-off meeting– Agreement on project planning– Templates for managing the project developed– NQA configured for project management (overall project

planning, work package planning, effort reporting)– Partners reporting effort using NQA since October, 2001– Quarterly reports and Periodic Progress Report submitted to

PO on NQA

Page 14: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 14

Introduction TEAMwork

Progress Highlights(July 2001 – June 2002)

• WP2 (Teamwork Analysis using Bestregit )– WP Plan produced– Bestregit Training completed for all partners– Analysis of scenarios in domains:

• Software Engineering• Public Service Organisation• Research Networks

– Synergies between scenarios identified and exploited– Sub-deliverables integrated into Deliverable 2– Submitted to PO on 14 December, 2001 using NQA

Page 15: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 15

Introduction TEAMwork

Progress Highlights(July 2001 – June 2002)

• WP3 (NQA installation and configuration)– Four servers successfully installed

– Configured with all scenarios

– Training programme for Users, Quality Manager and Administrator undertaken in

January 2002

– D.3 produced with training materials

– Scenario-specific training offered to users

Page 16: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 16

Introduction TEAMwork

Progress Highlights(July 2001 – June 2002)

• WP4 (Validation and Evaluation – WP Plan produced

– Trials organised in three domains

– Questionnaires finalised

– Evaluation of Methodology, Technology, Social and Cultural factors

– End-users trained and ‘ready to go’

– Trials in RND started in June

Page 17: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 17

Introduction TEAMwork

Progress Highlights(July 2001 – June 2002)

• WP5 Verification and Refinements– Work has started already

– Early feedback from users in Graz

– Specification document provided to Hyperwave

– Additional refinement after WP4 is complete

– Methodology refinement taking account of differences between D.2 and D.3

Page 18: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 18

Introduction TEAMwork

Progress Highlights(July 2001 – June 2002)

• WP6 (Dissemination)– WP Plan produced – Project Website developed (www.euteamwork.net)– Details of project disseminated widely– Concertation meetings Brussels (June 2001 and 2002)– Presentation at EuroSPI 2001 – Presentation to IRC network– Presentation at e2001 Venice– Presentation at IST WISTCIS meeting– Presentation at Baltic IT&T conference, TELEBALT Forum– TII annual conference, Turin.– Papers submitted to conferences and publications– Support of EU acknowledged

Page 19: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 19

Introduction TEAMwork

Progress Highlights(July 2001 – June 2002)

• WP7 (Exploitation)–Discussion document prepared and

discussed by partners–Work package plan produced–Draft Exploitation Plan being developed- Contact with other projects – clusters

and Expressions of Interest in FP6

Page 20: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 20

Introduction TEAMwork

Progress Highlights(July 2001 – June 2002)

• WP8 (Peer Review and Assessment)– Nominations received from all Partners for Peer Assessment

Team– Chairman of Peer Assessment Team briefed on Project

Progress in January, 2002– Report and non conformance reports completed– Partners are currently demonstrating NQA and briefing Peer

Assessors– Next Peer Assessment report to be completed in July /

August

Page 21: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 21

Introduction TEAMwork

Future WorkJuly – December, 2002

• Undertake Trials in July, August and September• Capture end-user evaluations through questionnaires and

interview (methodology, technology and social analysis)• Write domain-specific reports• Analyse social and cultural differences• Produce D.4• Verify and Refine (WP5)• Continue Dissemination activities (WP6)• Develop Exploitation Plan (WP7)• Continue Peer Review and Assessment (WP8)

Page 22: Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland brian.foley@tecnet.ie Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Presentation for IST-2000-2816225.June. 02Brian Foley, TecNet, [email protected]

Page 22

Introduction TEAMwork

TEAMwork IST-2000-28162

Thank you for your attention!