13-04-20231
EXPERIENCES WITH AN ORC TO INCREASE THE ENERGY EFFICIENCY IN
A MUNICIPAL WASTE INCINERATOR
Jeroen Vanwalleghem
13-04-20232
Summary
The waste incinerator of MIROM. Extension of the heat recovery with electricity. The organic rankine cycle. Application in MIROM Roeselare. Some data, graphs and results. Calculation of expenses. Conclusion and future.
13-04-20233
MIROM Roeselare
Is a union of 15 municipalities established for collecting and treating municipal waste. The region counts 270.000 inhabitants.
The waste is collected separately: residual waste, paper, PMD (plastic and metal cans, bricks).
20 recycling parks. Own waste incinerator – only residual waste.
13-04-20234
The waste incinerator of MIROM
Two lines, each with a furnace, boiler, ESP, dry gascleaning with injection of bicar and active coal. Baghouse with Remedia catalytic filters and a shell denox system.
2 * 4 ton/h or 62.000 ton/year. Boilers with superheated water of 180°C.
2 * 7 MW or 115.000 MWh/y. Since 2010 extra Economizers: 2 * 0,75 MW
13-04-20235 13-04-20235
18MW-180°C
110°C1986
180°C
3,1MWe
2008
1976
Gas : 7MW
2004
13-04-20236
Heat recovery
Primary circuit of 180 °C, pression 15 bar and heat exchanger.
Town heating system of 110 °C, 5 bar. 21 customers with a heat demand around 25.000
MWh. 5.000 MWh for preheating of combustion air. Expansion of the distance heating is not possible.
Forced to look for other systems to increase energy recovery.
13-04-20237
District heating
8
• Circuit to city centre: 4,5 km(x2)
• Circuit to greenhouses: 2,5 km(x2)
• 21 customers
MIROM
13-04-20239
Choice for electricity
MIROM did not find other customers who needed lots of energy.
Production of electricity was the only option. Primary temperature of 180 °C is far too low
to make electricity with steam.
13-04-202310
Why did MIROM choose an ORC
Boilers are still in perfect condition. The town heating system stays primary, so
energy to ORC will fluctuate. ORC is easily adjustable. Organic fluid evaporates at low temperature.
13-04-202311
Property of solkatherm
Looks like water, smells like solvent. Heavier than water: 1,36 kg/l. Boils at 35,6 °C. Not toxic. Not explosive or flammable. Self-ignition temp.: 580 °C.
13-04-202312
13-04-202313
13-04-202314
13-04-202315
Some data
Installed: input = 17 MWth, output = 3,1MWe. Design conditions: input 15 MW, T amb. 15°C
gives output 2,4 MWe. Average efficiency: 15,6%. Range: 2.900 kW – 100 kW.
13-04-202316
Investment in EUR
ORC: 5.300.000Heat connection: 725.000Building: 900.000
Total: 6.925.000
13-04-202317
Heat recovery in 2011 in MWh
Produc-tion
boilersMWhth
Town heating
MWhth
PreheatPrim.
AirMWhth
Energy to ORC
MWhth
Produ-ced
electr.Mwhe
Total Recov.
MWh
142.525 24.100 5.200 107.000 16.930 46.230
13-04-202318
Production of electricity
See next slide. ORC runs since july 2008. Even in winter there is still production.
13-04-202319 jan feb mar apr may jun jul aug sep oct nov dec jan feb mar apr may jun jul aug sep oct nov dec
0
200
400
600
800
1000
1200
1400
1600
1800
Energy balance '08 - '09 Electricity - BOUGHT [MWh] Electricity - SOLD [MWh]
Total Electricity Production [MWh] Own consumption [MWh]MWh/month
13-04-202320Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0
200
400
600
800
1000
1200
1400
1600
1800
Balans elektriciteit 2011Aankoop - Totaal 195 MWh
Verkoop - Totaal 8814 MWh
Productie - Totaal 16930 MWh
Eigen verbruik - Totaal 8325 MWhMWh/maand
13-04-2023211/Ja
n/08
1/Feb
/08
1/M
ar/0
8
1/Apr
/08
1/M
ay/0
8
1/Ju
n/08
1/Ju
l/08
1/Aug
/08
1/Sep
/08
1/Oct
/08
1/Nov
/08
1/Dec
/08
1/Ja
n/09
1/Feb
/09
1/M
ar/0
9
1/Apr
/09
1/M
ay/0
9
1/Ju
n/09
1/Ju
l/09
1/Aug
/09
1/Sep
/09
1/Oct
/09
1/Nov
/09
1/Dec
/09
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
Power '08 - '09Electricity - BOUGHT [kW]
Electricity - SOLD [kW]
Total Electricity Production [MWh]
kW
13-04-202322
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
Vermogens 2011
Gemiddelde Injectie actief vermogen
Gemiddelde Afname actief vermogen
Gemiddeld opgewekt vermogen ORC
Eigen verbruik
kW
13-04-202323
Efficiency
ORC follows thermal load between full range Guaranteed average gross efficiency =
15,6% Gross efficiency varies between 15% and
17% depending on outside temperature conditions and thermal load
13-04-202324
13-04-202325
Reliability - Availability
Total amount of running hours during 2011 8364 hours (total availibility = 95,5%)
Total amount of running hours incinerators : 8396 hours
13-04-202326
Conclusion.
An ORC is a real added value for our heat recovery.
Even in winter we still have production of electricity.
Thanks to the GEC, the system is profitable. After the typical start-up problems, the ORC
runs smoothly with high availibility Little supervision necessary
04/13/202327
Future
There is a plan to build greenhouses of about 200.000 m² next to our ORC. We’ll use the cooling system to warm up the greenhouses.
There are plans to enlarge the town heating system: Up to 30 more industrial clients and 50 residential clients.
In this case, efficiency will decrease by a certain percentage, but the total recovery of energy will be very important.