Presentation Comp Profile

download Presentation Comp Profile

of 6

Transcript of Presentation Comp Profile

  • 8/4/2019 Presentation Comp Profile

    1/6

    Last update28.08.07

    Company presentation in short

    Content

    1. General information2. Equipment3. Staff4. Major reference projects

  • 8/4/2019 Presentation Comp Profile

    2/6

    Last update28.08.07

    1: General information

    Amundsen Diving A/S where established already back in 1976, and we have continuouslydeveloped our operation capabilities within safe diving and ROV operations, basically

    on the inshore market.

    Safety, energy, professionalism and added value for our customers are important measuresto success. Our Corporate manuals are built and continuously developed based on thesevalues. Our aim is to be seen as a serious player in a demanding market within our business.

    Our diving system and routines are built on years of experience, and based on rules andregulations given by the Norwegian Government, as well as demanding customers from theoil industry. We are accepted supplier of diving and ROV services to Statoil, Hydro, Shelland Aker-Kvrner, according to their regulations. We have been audited by DnV, andaccepted as service supplier according to their approval programme # 404/2001.

    Our Diving and ROV services are sertified according to NS-EN-ISO 9001:2000 and NS-EN-ISO 14001:2004

    We are today 7 persons employed in the company, one secretary and 5 divers with many yearsof experience in the business. Our General Manager has in addition to his diving experience.Our aim is to get even more staff, both on the technical end operational side.

    For bigger projects we have a list of experienced staff to hire in on short notice.They have all been operating under our command in several demanding projects.

  • 8/4/2019 Presentation Comp Profile

    3/6

    Last update28.08.07

    2: Equipment

    M/S Scuba, our 21.55 m long diving-vessel, is equipped for safe and efficient surfaceorientated diving operations to 50 m water depth.We are equipped with one ROV- systems on the vessel a work-class ROV of type ARGUS

    mariner.Cranes, winches, thrusters, lots of special tools in addition to operation experience from thecrew makes the operations safe and efficient.Accommodated for 6 persons, with acceptable standard on the living facilities makes themobilisation of the vessel fast and efficient, ready to start complex operations on veryshort notice.

    We have in addition a complete work-class ROV system available in our workshop, identicalto the system onboard, ready for mobilisation anywhere needed.There is also available diving equipment to mobilize additional diving systems, to be operatedaccording to our procedures

  • 8/4/2019 Presentation Comp Profile

    4/6

    Last update28.08.07

    3: Staff

    General Manager/Diver Geir Amundsen

    Year of birth 1969permanent employeeDiver class 1ROV PilotCaptainBeen participating in all reference projects in this presentation

    Operations Manager/Diver/ROV pilot Endre Laurhammer

    Year of birth 1958permanent employee june 1977

    Diver class 1ROV pilotBy his operative experience and knowledge, a valuable recoursein connecting theory and practice in a safe manner

    Diver/ROV pilot/IT and manuals Morten Amundsen

    Year of birth 1973permanent employee july 1990Diver class 1ROV pilotResponsible for our IT system and maintenance of manuals/managementsystemsInternal auditor

    Captain/Diver/ROV pilot Jan yvind Hollund

    Year of birth 1977permanent employee april 2005Diver class 1ROV pilot

    Diver/ROV pilot Atle Agasster

    Year of birth 1969permanent employee july 2006Diver class 1ROV pilot

  • 8/4/2019 Presentation Comp Profile

    5/6

    Last update28.08.07

    4: Major reference projects, last 19 years, related to oil industry

    Aker Marine Gansfjorden-Testing float-off tank 2007Contracors Test program for inst. On jacket structure

    Platform.

    AF-Decom Ekofisk-Seabed survey 2007Seabed survey at 2/4TEkofisk-tank

    Statoil Statoil Mongstad-New section pipeline 2006ASA Diving and ROV operations New section 370m

    1400mm pipeline installed

    Statoil Installed new Cathodic-protection 2006ASA Diving and ROV operations, in connection with new

    Catodic-protection on load in-kai

    Technip Offshore Inspection and testing 2006Rov inspection and testing on Alvheim projectinshore

    Argus Remote Geoconsult North sea 2006System ROV ispections and pipeline-survey.

    Argus Remote PGS Malaysia 2006System Rov operations and support for seismic.

    Aker Kvrner Shell UK Decomissioning Brent flare 2005Diving and ROV operations, in connectionwith inshore activities at Stord.

    Aker Kvrner Statoil-Kristin 2004-2005Diving and ROV operations, in connectionwith inshore activities at Stord

    AF-Phil Group Melkya 2004Product Jetty, various workCathodic protection installationHawser StairsInspections and more..

    IMC Operations Salvage of Rocknes 2004ROV operations

    Aker Maritime Maureen inshore demolition 2001-2003Diving and ROV operations,590 dives only for dismantling of theMaureen platform .25 divers engagedin peak-periods

    Stolt Offshore Draugen 2001Garn West pull in

  • 8/4/2019 Presentation Comp Profile

    6/6

    Last update28.08.07

    Aker Maritime Snorre B 2001

    All inshore diving and ROV operations

    Brdrene Johnsen Troll C 1999Mounting seawater inlets, each 25 tons

    AF-Spesialprosjekt Kolsnes 1999Operations in connection withoilpipes lay out.

    Stolt Comex Seaway Kolsnes 1997-1999Statoil service agreement,inspectionof oil pipes

    Aker Stord sgard &Veslefrikk 1998-1999Diving and ROV operations,Various installation work,ie fairleadsand thrusters.

    Aker Stord/Statoil Norne 1997Diving and ROV operations,various assembly and repair work

    Aker Stord Njrd 1997Diving and ROV operations,

    Kvrner/Hydro Troll Olje 1995Diving and ROV operations,inshore during construction

    Aker Stord/Saga Snorre 1992Diving and ROV operation,inshore construction phase and cut-loose

    Peconor/ Philips Ekofisk protection wall 1988-1989Diving and ROV operations, inshoreduring construction phase40 divers and ROV staff engagedin peak periods.

    For more detailed information, please contact our head office.