Presentacion PPT(Ingles 4Q)
Transcript of Presentacion PPT(Ingles 4Q)
Presentation 2014
Cautionary Statement
This package of presentation materials contains
forward-looking information regarding sales and
production volumes, cost applicable to sales,
general and administrative expenses, capital
expenditures, development projects and other
matters. Important factors that might cause future
results to differ from these projections are
described in BVN’s form 20-F filed with the
Securities and Exchange Commission.
2
1. COMPANY OVERVIEW
3
Investment Thesis
4
Gold and
Silver growing
production
9 operating
mines
(5 underground
and 4 open pit)
Profitable
equity
investments:
Yanacocha &
Cerro Verde
Best
Corporate
Governance
Practices
A unique mining culture which provides
an essential competitive advantage
Strong balance sheet with low leverage and no hedge in precious metals
More than 60 years of successful
history
Explorations
devoted
7 projects
delivered in
the last 4
years
Investment Thesis
5
Tambomayo
La Zanja
underground
deposit
(Alejandra)
Chucapaca
underground
Yanacocha
(Chaquicocha,
Colorado, Conga,
Yanacocha
Sulphides)
Maximizing Cash Flows
CAPEX
spending
discipline
2014 vs 2013
Prudent
M&A
strategy
Cerro Verde
expansion
Deep pipeline of growth opportunities
Cost
reduction
achieved in
2H13
Small assets
divestiture
2. GOLD MARKET
6
Long term gold drivers
Demand drivers
Inflation risk in the mid term.
Central Banks are still net buyers. Massive physical buying in Asia.
ETF’s as a vehicle to acquire gold.
Increase in gold holdings per capitaas safe haven.
Supply factors
No major gold deposits discovered.
Increase in the industry average cash cost (> US$ 650 per Oz) and all-in
cost (> US$1,200 per Oz).
Increasing social issues and environmental restrictions.
Flat global gold production and reserves. Reserves replenishment
constraints.
7
Increasing gold demand in SGE
Gold demand seen on the Shanghai Gold Exchange this year (SGE).
Source: Mitsui Global Precious Metals
8
3. FINANCIAL HIGHLIGHTS
9
Financial Track Record
10
STRATEGIC PLAN 2014
11
POTENTIAL ANNUAL SAVINGS
� Stopping production in 4 non-profitable operations (Shila-Paula,Poracota, Recuperada and Antapite).
� Focusing mine exploration activities on high grade and accesibletargets.
� Selling small assets with reduced contibution to revenues andreserves.
� Focusing on profitable operations.
� Increasing mining operation efficiency in Orcopampa andUchucchacua.
� Adding contributions from Rio Seco Industrial Plant and HuanzaHydro Plant.
≈ USD 80 – 100 MILLION
Buenaventura & AffiliatesRevenues & EBITDA Breakdown
12
Cash Position & Debt
13
CAPEX 2014
14
4. OPERATIONAL HIGHLIGHTS
15
Main Operations
NAME SINCE METALS TYPE
Uchucchacua 1975 Silver, Lead, Zinc Ug
Orcopampa 1967 Gold, Silver Ug
Julcani 1953 Silver, Copper, Lead Ug
Mallay 2012 Silver, Lead, Zinc Ug
Breapampa 2012 Gold, Silver Op
El Brocal (54.07%)
(Colquijirca/Marcapunta) 1956
Zinc, Lead, Silver,
CopperOp/Ug
La Zanja (53.06%) 2010 Gold, Silver Op
Coimolache (40.10%)
(Tantahuatay)*2011 Gold, Silver Op
Yanacocha (43.65%) 1993 Gold, Silver Op
Cerro Verde (19.58%) 1993Copper,
MolybdenumOp
DIR
EC
TO
PE
RA
TIO
NS
AFF
ILIA
TE
S
16
Antapite 2001 Gold, Silver Op
Poracota 2006 Gold, Silver Op
Shila-Paula 1989 Gold, Silver Op
Recuperada 1956 Silver, Lead, Zinc UgSM
ALL
AS
SE
TS
UN
DE
R
EV
ALU
AT
ION
* Operated by Buenaventura.
Gold, Silver, Copper and Zinc Equity Production
(*) Estimated
17
Reserves & Resources (NRM)
18
2012: 1,400 US$ / Oz Au
2013: 1,200 US$ / Oz Au
2012: 30 US$ / Oz Au
2013: 20 US$ / Oz Au
Cost Applicable to Sales
METAL CAS 4Q13 CAS 2014e*4Q13 REALIZED
PRICE
Gold US$ / Oz Au 776 650 - 680 1,271
Silver US$ / Oz Ag 11.28 12.00 – 12.50 20.62
Zinc US$ / TM Zn 1,088 900 – 1,000 1,885
Copper** US$ / Lb Cu 1.10 1.25 – 1.35 3.25
19
• Estimated
** Cash cost provided by Cerro Verde
5. DIRECT OPERATIONS
20
ORCOPAMPA
MAIN PROJECTS
• Exploring new areas in Orcopampa District:
encouraging results in Parihuanas & Pucay.
* Estimated
21
Main metals Gold, Silver
Deposit & Mine type Underground
Plant Capacity (MT per day) 1,540
CAS (4Q13) US$830/OzAu
22
Orcopampa: Chipmo operation
& Brownfields exploration areas
volcand
fmur
Tm
fmhu
volcand
Volcanicos andagua
volcandvolcand
volcand
Vsr
Vsr
Vsr
Vsr
Vsr
fmhu
fmhu
fmhu
Tm
Tm
Tm
Tm
Tm
Tch
Vand
Vdac
Tpi
Tpi
Tpi
Tpi
Vand
Vand
Vand
Vand
Vand
Vand
Vand
Vand
Vdac
Vdac
����
TINTAYMARCA
MISAHUANCA
ALLHUIRE
CHAPACOCO
V. Santiago E
70
°
80
°
65
°
75
°
81
°
80
°
77
°
85
°
80
°
48
°
77
°
66
°
65
°85
°
65
°
82
°
45
°
Tpi
E 775000 E 780000 E 785000 E 790000 E 795000
N 8
30
50
00
N 8
31
00
00
N 8
31
50
00
0
meters
2500
APACHETA
HUISCATORI
Aseruta4
MINE AREA
EXPLORATION AREAS
Mauras
ANQUICHA
Tm
70
°
ORCOPAMPA
5
2
3
Vsr
Vcol
Quaternary
Volcanicsvolcand
tchi
Dm-And
Dm-Dac
Tm
Tp
Rdac
fmar
fmur
fmhu
csar
LITHOLOGY
Vsr
Tertiary
Volcanics
Jurassic
Sedimentary
Formations
PAYCHILOMA
67
Mulañán
1
9
8
N°°°° PROSPECTWIDTH
m
Au
g/t
Ag
oz/t
Pucay (Melissa) 29.65 1.98 2.9
Includes 1.00 0.21 44.9
Includes 1.95 5.90 6.2
Includes 0.50 10.43 1.3
Includes 2.00 3.55 10.7
2 Aseruta 10.75 0.63 13.9
3 Aseruta 7.65 0.17 14.4
4 Aseruta 2.25 0.41 15.4
5 Aseruta 2.90 0.24 10.8
6 Mulañán 1.65 0.05 9.6
7 Mulañán 0.45 0.08 4.3
8 Pucay 0.91 10.09 1.8
9 Pucay 0.60 10.64 0.0
DIAMOND DRILLING INTERCEPTS
1
SURFACE SAMPLING
CHILCAYMARCA
Pucay
Chipmo
Melissa
Longitudinal section of
Nazareno vein
23
HoleWidth
(m)Au g/t Ag oz/t
1 0.16 27.70 -
2 0.50 30.74 -
3 0.75 54.86 -
4 0.75 174.45 0.14
5 0.14 15.47 -
6 0.20 26.50 -
7 0.75 26.64 0.71
8 0.30 13.61 -
9 0.75 12.69 -
10 0.28 24.89 -
11 0.75 16.39 7.24
12 1.55 20.00 10.75
13 9.75 0.60 0.92
Economic Ore > 12.92 g/t AuMarginal Ore 10.69 – 12.92 g/t Au
Submarginal Ore 9.48 – 10.69 g/t AuLow Grade Ore 1.51 – 9.48 g/t Au
NEChilcaymarca River
3,800
3,700
3,600
3,500
3,400
3,300
3,200
3,100
3,000
3,800
3,700
3,600
3,500
3,400
3,300
3,200
3,100
3,000
Nv. 3640
Nv. 3110
Nv. 3170
Nv. 3230
Nv. 3290
Nv. 3340
Nv. 3390
Nv. 3490
Nv. 3540
Nv. 3590
Nv. 3340
Nazare
no
sh
aft
9
10
2
1
7
8
3
6
5
11
4
TOTAL ORE RESERVES : 0.63 Mt @ 16.39 g/t Au (0.33 Moz Au), 43.20 g/t Ag (0.88 Moz Ag) TOTAL NRM : 0.23 Mt @ 15.98 g/t Au (0.12 Moz Au),96.34 g/t Ag (0.72 Moz Ag)
Pro
meti
da s
haft
12
Cut offs: 500 m
SW
UCHUCCHACUA
Main metals Silver, Zinc, Lead
Deposit & Mine type Underground
Plant Capacity (MT per day) 2,900
CAS (4Q13) US$12.86/OzAg
MAIN GROWTH PROJECTS
•Exploring & Developing Brownfield areas:
Yumpag.
• Production capacity increase to 3,500 MT
per day.
* Estimated
24
Uchucchacua Mining District
geological cross section
25
NW SE
5,000
4,000
Height
(m.)
Lu
z s
haft
Ks-js
sm
Ks-jm
Ks-ji
Level 3990
Level 4120
IRMA
VIVIANA
ROSMERY
LUCIA
MARION
NORTE
RO
SA
2
CA
CH
IPA
MP
A SO
NIA
CLAUDIA
699Level 4060
Level 4180
Level 4240
Level 4300
Level 4360
Level 4400
Level 4450
Level 4500
Level 4550
Level 3920
Level 3850
Level 3780
SISTEMA
MARIANA
ROSALINDA
4,500
3,500
Maste
r sh
aft
Rp. 626
Rp. 760
Ks-js
Ks-jm
Ks-ji
Upper Jumasha FormationMarker bedMiddle Jumasha FormationLower Jumasha FormationIntrusives+ +
s-m
Ks-js
Ks-js Casapalca FormationCelendin Formation
Sulfide orebody
Oxide orebodyVeinsFaults
RUBI
EVA
MARIA
RITA
LUCRECIA AREA
SOCORRO AREA
CARMEN AREA
HUANTAJALLA AREA
TOTAL ORE RESERVES : 3.84 Mt @ 16.91 oz/t Ag, 1.04 % Pb, 1.40 % Zn, 9.49 % Mn
TOTAL NRM : 2.80 Mt @ 16.60 oz/t Ag, 1.45 % Pb, 1.79 % Zn, 9.50 % Mn NWNW SE
+++
+
++
+ +
+
1 Km
++
++
+
Uchucchacua Mining District
longitudinal section
26
Nv. 3920
5000
4200
3400
Pro
j. R
.C-1
Q. Carama
Yumpag Area
Ks-js
Ks-jm
Ks-jiKi-pKi-ch
Nv. 3920
SW NE
Ks-c
sm
Ki-ph
Exploration decline
Pu
nto
de
In
fle
xió
n
0.42-43.0-2.03-2.25-10.03
Socorro Area
2.60-28.1-0.80-0.79-33.051.02-22.8-1.69-2.85-2.83
3.04-16.2-2.00-1.50-8.052.31-21.9-0.37-0.42-13.18
SOCORRO DST Width Oz Ag %Pb %Zn %Mn
RESERVES 1´626,290 4.56 17.0 1.03 1.32 11.51
RESOURCES 697,265 2.53 19.1 1.15 1.42 10.85
KT-c
T-Va
T-di
Q-c
T-di
SOCORRO
Ancho Oz.Ag %Pb %Zn %Mn
Q-c
TOMASA DST Width Oz Ag %Pb %Zn %Mn
RESOURCES 228,588 6.71 10.2 0.11 0.31 33.78
POTENTIAL 75,255 7.38 14.7 0.03 0.21 39.48
TOMASA
Rp. Nv. 4490
Nv. 3710
Nv. 4450
LUZ
Pu
nto
de
In
fle
xió
n
Marker
Ks-js
Qc Cuaternario coluvial
Ks-c Fm. Celendin
Jumasha Superior
KT-c Fm. Casapalca
sm
Jumasha MedioKs-jm
Jumasha InferiorKs-ji
T-va Volcanicos
T-di Diorita (Roca Intrusiva)
Fm. PariatamboKi-p
Fm. ChulecKi-ch
Fm. PariahuancaKi-ph
Fm
. Jum
asha
++
++
++ +
++
+
++
++
++
+
++
++
+
?
??
?
+ +
+ +
+
++
++
+
+
+
+
+
+
??
1 Km
+ + Intrusivos
(4490)
EL BROCAL
* Estimated
27
COLQUIJIRCA
MARCAPUNTA
Ownership 54.07%
Main metals Copper
Deposit & Mine type Underground
CAS (4Q13) US$ 2,842/MtCu
Main metals Zinc, Silver, Lead
Deposit & Mine type Open Pit
CAS (4Q13) US$ 757/MtZn
* Estimated
EL BROCAL
28
MAIN GROWTH PROJECTS
•El Brocal expansion from 6 ktpd to 18 ktpd has been completed and production will start in March.
•Total investment during 2013 was US$ 432 MM (US$ 180 MM debt, US$ 70 capital increase and US$ 182
internal cash generation).
•San Gregorio Project – Mineral Resources: 79.9 Mt @ 0.38 oz/TM, 1.5% Pb, 5.2% Zn
LA ZANJA
29
MAIN GROWTH PROJECTS
• Starting production from Pampa Verde pit
on 2Q14.
• Exploring higher grade underground areas
in Alejandra project for resource oxide (first
years) and sulphide ores.
Ownership53% BVN, 47%
Newmont
Main metals Gold, Silver
Deposit & Mine type Open Pit
CAS (4Q13) US$617/OzAu
* Estimated
TANTAHUATAY
30
MAIN GROWTH PROJECTS
• Cienaga Norte & Tantahuatay II projects to
expand the life of mine.
Ownership40% BVN, 44%
SCCO, 16% ESPRO
Main metals Gold, Silver
Deposit & Mine type Open Pit
CAS (4Q13) US$375/OzAu
* Estimated
BREAPAMPA
31
MAIN GROWTH PROJECTS
• Expand resources in Pucagallo & Senccata
areas.
* Estimated
Ownership 100% BVN
Main metals Gold, Silver
Deposit & Mine type Open Pit
CAS (4Q13) US$447/OzAu
6. AFFILIATES
32
YANACOCHA
CONGA PROJECT
• Reserves: 12.6M Oz Au
• Water first: to start construction of El Perol
reservoir by the end of 2014
• CAPEX: USD 5.0 Billion
• Reviewing development cost reduction
oportunities for Conga.
33
Ownership43.65% BVN, 51%
Newmont, 5% IFC
Main metals Golden, Silver
Deposit & Mine type Open Pit
CAS (4Q13) US$849/OzAu
* Estimated
CERRO VERDE
MAIN GROWTH PROJECTS
• Expansion of concentrator facilities from
120K to 360K MT per day.
• Expected copper annual production
after expansion: 600K MT (beginning in
2016).
• Total CAPEX: US$4.6 Billion.
•Construction started 2013.
• Will raise US$1.8 B Debt
34
Ownership19.58% BVN, 54% Freeport
McMoran, 21% Sumitomo
Main metals Copper, Molybdenum
Deposit & Mine type Open Pit
7. COMPLETED PROJECTS
35
RIO SECO PROCESSING PLANT
Ownership 100% Buenaventura
CAPEX US$ 110 million
Objective
To allow mining from accessible areas
with high Ag and Mn grade.
To improve the quality of lead-silver
concentrates from Uchucchacua mine
by reducing manganese content.
Resultant manganese sulfate
concentrate with commercial value.
Status The plant is in ramp up stage.
36
HUANZA HYDROELECTRICAL PLANT
Ownership 100% Buenaventura
CAPEX US$ 225 million
ObjectiveTo assure energy supply for direct
operations.
Energy generation 90.6 MW
Status
Unit 2 started producing 46.3 MW.
Unit 1 will start comissioning in
March.
37
38
8. EXPLORATION PROSPECTS
39
Trapiche
ChucapacaColquemayo
Paco Paco
Greenfields
Brownfields
Advanced
La Zanja
Mallay
Uchucchacua
Orcopampa
Tambomayo
Colquijirca
Tantahuatay
Julcani
Exploration projects & prospects
Pro
sp
ec
tsP
roje
cts
Trapiche
Tambomayo
Chucapaca
Aseruta
Pucay
Parihuanas
Colquemayo
ChancasYumpag
Paco Paco
Mulañán
El Faique
El FaiqueOperations
Tambomayo Project
40
Ownership 100% Buenaventura.
Main metals Gold and silver.
Deposit & Mine TypeHigh grade veins for underground mining with
conventional metallurgy.
Status
Advanced exploration , mine development &
engineering studies.
Drilling of new structures / Environmental impact
study & construction / processing permits.
Mineral Resources
(NRM)
December 31st, 2013
1.59 Mt @ 13.6 g/t Au, 9.2 oz/t Ag, 2.1 % Pb and
3.0 % Zn (Average Width: 3.5 m).
RESOURCES Tonnes Width (m) g/t Au oz/t Ag % Pb % Zn
Measured + indicated 600,936 3.21 9.87 15.60 2.05 2.70
Inferred 987,907 3.62 15.83 5.26 2.16 3.19
Total Resources 1’588,843 3.46 13.59 9.17 2.12 3.00
POTENTIAL 892,442 2.85
DDH program 2014: 15,000 m
Exploration and development program 2014: 12,000 m
Projects
Shaft
Ore pass
Waste pass
Raise climber
Decline
62
54
525047
44
33
55
38
3224
26
36
132
40
63
28
15
21
35
Tambomayo project:longitudinal section of Mirtha vein system
Range of values (Ag equiv.)
3.06 - 16.82 oz/t
16.82 - 17.27 oz/t
17.27 - 19.80 oz/t
19.80 - 30.00 oz/t
> 30.00 oz/t
41
• DDH 2013: 19,390 m (59), accumulated total 48,034 m (174).
• Exploration and development 2013: 11,673 accumulated total 21,020 m.
Level 4890 (1,093m)Level 4890 (1,093m)
29
57
68
159
Level 4940
(253m)
Level 4940
(253m)
Level 4840
(1,228m)
Level 4840
(1,228m)Level 4790
(1,346m)
Level 4790
(1,346m) Level 4740
(769m)
Level 4740
(769m)
Level 4690 (88m)Level 4690 (88m)
Level 4640Level 4640
Level 4590Level 4590
Level 4540Level 4540
Graphic scaleGraphic scale
DDHWidth
(m)
Au
g/t
Ag
oz/t
DDH-15 4.66 2.37 10.83
DDH-21 1.71 3.43 7.69
DDH-24 0.99 0.29 10.64
DDH-26 3.62 4.11 6.80
DDH-28 1.60 14.99 5.57
DDH-32 3.88 31.13 9.49
DDH-33 2.76 9.15 9.10
DDH-35 1.90 0.60 29.58
DDH-36 0.75 0.09 13.71
DDH-38 1.12 8.61 9.97
DDH-40 2.00 2.24 12.94
DDH-44 4.15 11.76 3.36
DDH-47 3.23 14.00 14.34
DDH-50 1.19 29.63 4.40
DDH-52 7.04 28.98 3.36
DDH-54 9.52 20.29 2.10
DDH-55 1.12 11.65 36.75
DDH-57 3.99 26.10 8.36
DDH-62 4.30 14.75 5.06
DDH-63 2.80 1.10 10.90
DDH-111-II 5.17 28.37 0.32
DDH-111-III 2.72 69.12 0.56
DDH-132 0.65 6.37 0.08
DDH-159-I 3.00 11.54 0.51
111
with similar
grades…
Mine
development
Tambomayo Project:
4690 Mine Level
42
Sedimentation
ponds
Paola vein
Length 98.00m
Width 1.84 m
12.62 g/t Au
11.01 oz/t Ag
1.71 % Pb
3.51 % Zn
Paola Norte vein
Length 78.00m
Width 1.85 m
20.03 g/t Au
6.13 oz/t Ag
6.09 % Pb
5.31 % ZnPaola vein
Length 65.00m
Width 9.95 m
21.99 g/t Au
6.27 oz/t Ag
2.69 % Pb
4.27 % Zn
100
m Mirtha vein
Length 68.00m
Width 2.40 m
12.64 g/t Au
11.89 oz/t Ag
1.70 % Pb
2.30 % ZnQuartz
vein
Tambomayo Project
Mirtha cross section & Paola veins system
Drill intercepts
DDH-111DDH-47
4800 m
4600 m
4400 m
QcolMirtha vein
628.4 m
I
II
I
II
III
I
II
III
Height
4890 Mine level
4840 Mine level
4790 Mine level
4740 Mine level
4690 Mine level
DDH-132
596.5 m
DDH-62
NE SW
DDHs
True
width Au Ag Height
(m) (g/t) (oz/t) (m)
47-I 1.84 17.81 8.75 4,710
47-II 3.23 14.00 14.34 4,700
62-I 3.20 14.75 6.06 4,600
62-II 4.30 6.49 8.48 4,580
62-III 0.86 5.75 1.30 4,560
111-I 8.18 6.69 4.53 4.490
111-II 5.17 28.37 0.39 4,480
111-III 2.72 69.12 0.56 4,460
132-I 0.65 6.37 0.08 4,310
I
43
44
Trapiche Project(El Molle Verde S.A.C.)
Ownership 100% Buenaventura
Main metals Copper, molybdenum
Deposit & Mine Type Open pit, copper and moly sulfide flotation mill.
StatusAdvanced explorations: - Drilling of new targets.
- Scoping study completed.
Mineral Resources (NRM)
December 31st , 2013
726 Mt @ 0.40% Cu, 0.01% Mo & 3.2 g/t Ag
(Cut off: 0.15% Cu).
45
NRM : 726 Mt @ 0.40% Cu, 0.01% Mo
(Cut off: 0.15% Cu)
Diamond Drilling> 100 g/t Mo
Mining concession
Trapiche porphyry
Trapiche porphyry
Millocucho skarnsS
eguiñ
a
Millocucho skarns
Trapiche Project(El Molle Verde S.A.C.)
5 Km
Mollebamba community
Chucapaca Project(Canteras del Hallazgo S.A.)
46
Ownership 49% Buenaventura & 51% Gold Fields
Main metals Gold
Deposit & Mine Type Underground. Gravity, Flotation and CIL
StatusImproved business case on scoping study
level for underground mining @ 3,000 tpd
Mineral Resources (NRM)9.1 Mt @ 5.6 g/t Au = 1.5 million Au ounces
(as of February 2014)*
* @ US $1,300 per oz Au
Longitudinal section, block model and resource cone for Canahuire ore body
47NRM : 9.1 Mt @ 5.6 g/t Au (1.5 M ounces gold) Underground project
9. STRATEGY
48
Creating Value Through…
49
EXPLORATIONS
Focused on precious metals
Solid exploration portfolio
Exploring inside Peru & LatinAmerica
Share risk through jointventure
OPERATIONS
Improving mining operations
Improving metallurgical process
Incorporating chemicalprocess
Assuring power supply
M & A
Mainly gold and precious metals
Junior companies
Located in Peru & LatinAmerica
Controlling interests
SAFETY IN EVERYTHING WE DO
Taking care of
environmental
issues
Improving
community
relations
Good corporate
governanceSUSTAINABILITY
50
Shareholders Strategy
• BVN has not issued new equity for 18 years.
Dividend policy:
Buenaventura will distribute an annual cash
dividend of at least 20% of net income
generated by majority-owned operations and
subsidiaries. In the case of Buenaventura’s
Associates (Coimolache, Cerro Verde and
Yanacocha), 20% of attributable to
Buenaventura’s net income will be included if
they distribute cash dividends to
Buenaventura.
APPENDIX
51
Major mining properties
& projects in Cajamarca
52
Shareholders Structure
NAME INTEREST
Institutional Investors & Index Funds 56%
Benavides Family 27%
Peruvian Pension Funds (AFP’s) 8%
Others 9%
OUTSTANDING
SHARES
254,186,867
53
www.buenaventura.com
Investor Relations : Daniel Domínguez
Telephone: (511) 419-2536
E-mail: [email protected]
54