• The Pickett plot is a visual representation of the Archie equation• The Pickett method is on the observation that true resistivity (Rt) is a function of porosity, Water

saturation(Sw) and cementation exponent (m).• The plot is named after G.R. Pickett.• The plot is based on taking the logarithm of the Archie equation.

• Taking the logarithm of the equation produces:

)-mlog(

• If the zone is water bearing

Log(

• In practice ( is usually plotted on the x-axis and the porosity on the y-axis.• This technique estimates water saturation and can also help determine • Formation water Resistivity (• Matrix parameter for sonic and density logs (

Page 3: Presantation picket plot

𝑅𝑤 𝑐𝑎𝑙𝑐𝑢𝑙𝑎𝑡𝑖𝑜𝑛 𝑓𝑟𝑜𝑚𝑝𝑖𝑐𝑘𝑒𝑡𝑡 𝑝𝑙𝑜𝑡• Formation Water Resistivity ( can be determined from the following equation :

• The following equation is derived by using Archie’s Equation as below:

• Rearranging the above equation

• When and thus the equation would become

• After Rearranging

Page 4: Presantation picket plot

Example𝑅𝑤𝑐𝑎𝑙𝑐𝑢𝑙𝑎𝑡𝑖𝑜𝑛 𝑓𝑟𝑜𝑚𝑝𝑖𝑐𝑘𝑒𝑡𝑡 𝑝𝑙𝑜𝑡• Density porosity is plotted on the y-axis and True

Resistivity is on x-axis.• The water-bearing line (was drawn through the cluster of

points with a slope of -1/2 (m=2)• The intercept of water bearing line at 100% porosity

(DPHI=1.0) is and can be determined from

• For some porosity value, read the value of from the water-bearing line on the crossplot. In this case, for a porosity of 10% (DPHI = 0.10), = 4.6 ohm-m.

• Assume a value of tortuosity factor (a). In this case, a = 1.0.

• The value of cementation exponent (m) is determined from the crossplot. In this case, m = 2.0.

• By substitution in the above equation

• = 0.046 ohm-m at formation temperature

Page 5: Presantation picket plot

Construction of Pickett Plot

• Picket plot can be constructed if we have a value of Rw & m.• The procedure for making a Pickett plot consists of five steps, detailed below.1. Plot points of matching porosity and true resistivity (Rt ) on log-log paper.2. Plot Rw point on the Rt scale.3. Determine m using the table of values.4. Plot the 100% Sw line.5. Plot the lines representing lower values of Sw .• These points are explained one by one for better understanding.

Page 6: Presantation picket plot

Construction of Pickett Plot

Step 01:Plot points

• Plot points of matching porosity and true resistivity (Rt) values.

• Use the x-axis for the resistivity (Rt) scale and the y-axis for the porosity (Φ) scale.

Page 7: Presantation picket plot

Construction of Pickett Plot

Step 02: Plot Rw Point

• Plot the Rw value (resistivity of formation water) by plotting the Rw point along the Rt scale on the x-axis at the top of the graph grid where porosity is 100%.

Page 8: Presantation picket plot

Construction of Pickett Plot

Step 03:Determine m

• Estimate m (cementation factor) using the table below.

Porosity Type Value of m

Sandstones with diagenetic or detrital clay in pores 1.7-1.8

Formations with clean, macro- to micro-sized pore throat

2

Formations with vuggy porosity 2.2-3.0

Page 9: Presantation picket plot

Construction of Pickett Plot

Step 04:Plot the 100% Sw line

• On a pickett plot,the value of m determines the slope of the S

• The first Sw line plotted on a Pickett plot is the 100% Sw line.

• To plot this line, draw a line with a negative slope equal to m that begins at the Rw point.

• Use a linear scale to measure the slope; for example, go down 1 in. and over 2 in.

Page 10: Presantation picket plot

Construction of Pickett Plot

Step 05:Plot sw lines• After plotting the 100% Sw line, plot the lines

representing lower percentages of Sw using this procedure:

• Find the intercept of Rt = 1 and the 100% Sw line (made in the last procedure).

• From this intercept, draw a line parallel to the x-axis across the plot. Any point on this line has the same porosity.

• Where this line passes through Rt of 2, 4, 6, 8, 14, and 20, draw a series of lines parallel to the 100% Sw line.

• Points on these lines correspond to Sw of 71, 50, 41, 35, 27, and 22%. These percentages are calculated from the Archie equation using m = 2 and n = 2 at Rt of 2, 4, 6, 8, 14, and 20.

Page 11: Presantation picket plot

Advantages of Pickett Plot

• Water saturation can be predicted without prior knowledge of Rw, a, or m.• Rw is directly predicted (if tortuosity factor (a) is known or estimated) from the intercept of the water

bearingline at a porosity of 1 (porosity = 100%)• The advantage of Picket Plot is that similar water saturation values will plot a straight line even if the

porosity and resistivity values vary.• This allows one to easily separate the formation into zones based on their calculated water saturation or in

gas saturation• Picket Plot is better because it is good for low porosity formation where small variation of m cause large

variations in Sw.

Page 12: Presantation picket plot

Limitations of Pickett Plot

• One of the weaknesses of the Pickett plot is its inability to handle shaly formation• Values for pma and tma must be assumed (although in cases with a wide range of porosities in the water

bearing zone.• A wide range of porosity must be present to positively determine a water-bearing line.• Formation lithology and water resistivity must be constant over the intervals compared in the plot.

Page 13: Presantation picket plot

Distinguish between Pay zone & Water Leg

• The Pickett plot can be illustrated with the hypothetical data set of resistivity and porosity values logged, with “Archie rock” properties and a simple reservoir profile

• The example consists of a pay section at irreducible water saturation (zones A-E), a transition zone (Zone F), above a water leg (zones G-J).

Page 14: Presantation picket plot

Distinguish between Pay zone & Water Leg

• Zones A to E have much higher resistivities than zones H to J, even though they have similar porosities, and suggests that these zones may have appreciable hydrocarbon content.

• Zone F is intermediate between these two clusters, and its depth relationship to them indicates that it may be in a transition zone.

• The zone H-J trend of a systematic decline in resistivity with porosity also favors their interpretation as possible water zones.

Page 15: Presantation picket plot