Preparing MIDI for science operations on Paranal Markus Schöller Jean-Gabriel Cuby, Sebastien...
-
Upload
isis-hewson -
Category
Documents
-
view
216 -
download
0
Transcript of Preparing MIDI for science operations on Paranal Markus Schöller Jean-Gabriel Cuby, Sebastien...
Preparing MIDI for science operations Preparing MIDI for science operations on Paranal on Paranal
Markus SchöllerMarkus Schöller
Jean-Gabriel Cuby, Sebastien Morel, Andrea RichichiJean-Gabriel Cuby, Sebastien Morel, Andrea Richichi
Schloss Ringberg,Schloss Ringberg,
September 03, 2003September 03, 2003
VLTIVLTI
• All UT Coude trainsAll UT Coude trains• UT1 tip/tilt (STRAP)UT1 tip/tilt (STRAP)• UT2 and UT3 full AO (MACAO)UT2 and UT3 full AO (MACAO)• Transfer OpticsTransfer Optics• 3 Delay Lines3 Delay Lines• VINCIVINCI• MIDIMIDI• Four staff astronomers, three Four staff astronomers, three
fellows, several TIOs in Chilefellows, several TIOs in Chile• SID commissioning finishedSID commissioning finished
First Fringes First Fringes General User Instruments General User Instruments
PhasesPhases
• Assembly, Integration, Verification (AIV), which ends Assembly, Integration, Verification (AIV), which ends with First Fringeswith First Fringes
• Commissioning under the responsibility of the Commissioning under the responsibility of the Instrument TeamInstrument Team
• ““Paranalization” under the responsibility of ESOParanalization” under the responsibility of ESO• Science Demonstration TimeScience Demonstration Time• Open Time with Guaranteed TimeOpen Time with Guaranteed Time
Goals of ParanalizationGoals of Paranalization
• Test the robustness of the instrumentTest the robustness of the instrument• Ensure operatibility of the instrument in the science Ensure operatibility of the instrument in the science
operations groupoperations group• Verify instrumental performance and magnitude Verify instrumental performance and magnitude
limitslimits
Paranal organigrammParanal organigramm
MIDI - runs on the Unit TelescopesMIDI - runs on the Unit Telescopes
• first fringes obtained on first fringes obtained on December 15, December 15, 20022002• comm 1 in February 2003comm 1 in February 2003• comm 2 in May 2003comm 2 in May 2003• paranalization, GTO/SDT in paranalization, GTO/SDT in June 2003June 2003• paranalization in August and paranalization in August and
September 2003September 2003• SDT in November 2003SDT in November 2003• comm 3 in December 2003comm 3 in December 2003• paranalization and GTO/SDT in paranalization and GTO/SDT in
January/February 2004January/February 2004• science operations will start in science operations will start in
P73 (Apr 2004)P73 (Apr 2004)
Identified problemsIdentified problems
• OPD jumps OPD jumps • Tunnel/light duct seeingTunnel/light duct seeing• M2 return accuracy when choppingM2 return accuracy when chopping• MIDI tracking on ghost (2% vs 40% visibility, ±3.5mm MIDI tracking on ghost (2% vs 40% visibility, ±3.5mm
from nominal OPD) on very bright objectsfrom nominal OPD) on very bright objects
VLTI Data Flow SystemVLTI Data Flow System
DFS Hardware
VINCI Data ReleasesVLTI FITS DICDVLT-SPE-ESO-15000-2764NGAST UpdateWeb Archive Interface
On-Line VINCI PipelineMIDI, AMBER Pipeline
VINCI QC LogsAutomatic ReportsMIDI AMBER: Calibration DatabaseQC1 Parameters
Visibility CalculatorWeb Calib. Selection ESOFORM/PHRSVINCI ETCMIDI, AMBER ETCsScheduling
VINCI TemplatesOBs created with P2PPMIDI, AMBER TemplatesExtern. Verif. Modules
Call for Proposals - P73Call for Proposals - P73
• Call for Proposals Call for Proposals released on Sep 01, 2003released on Sep 01, 2003• Proposal deadline on Proposal deadline on Oct 01, 2003 Oct 01, 2003 • Observing April - Observing April - September 2004 September 2004
Call for Proposals - DetailsCall for Proposals - Details
• UT2/3 and UT1/3 (April-June only)UT2/3 and UT1/3 (April-June only)• Use of STRAP (tip/tilt)Use of STRAP (tip/tilt)• MIDI in low dispersion mode only (prism)MIDI in low dispersion mode only (prism)• Internal fringe tracking onlyInternal fringe tracking only• Limiting flux of 5JyLimiting flux of 5Jy• Limiting magnitude of V=16 (STRAP guiding)Limiting magnitude of V=16 (STRAP guiding) V~10% (no overlap compensation)V~10% (no overlap compensation)
Proposal Preparation IProposal Preparation I
• http://www.eso.org/instruments/midi/http://www.eso.org/instruments/midi/• Check objects against MIDI GTO listCheck objects against MIDI GTO list
VLTI open pointsVLTI open points
• Final installation of Final installation of Variable Curvature Variable Curvature Mirrors (VCM) in the Mirrors (VCM) in the Delay LinesDelay Lines
• Delay Line Metrology Delay Line Metrology upgradeupgrade
• Close the FINITO loopClose the FINITO loop• MACAO installation on MACAO installation on
UT1/4 and fine tuningUT1/4 and fine tuning• Auxiliary TelescopesAuxiliary Telescopes
Instrument Operations PageInstrument Operations Page
MIDI open pointsMIDI open points
• GrismGrism• Dispersed fringe trackingDispersed fringe tracking• Use of all filtersUse of all filters• Integrate-then-read (ITR) modeIntegrate-then-read (ITR) mode• External fringe trackingExternal fringe tracking• Spatial filtersSpatial filters• Acquisition of complex objectsAcquisition of complex objects