Training Overview:
What’s New?
Understanding your property in REAC’s eyes.
Your property profile, points breakdown and
scoring.
How to prepare and where to start.
Best spent dollars (what do I repair?).
“Day of ” Tips.
Assessing Appealable items.
14%
39%
37%
10% >60
TX Avg. = 82c*
The one variable you can’t control is the Inspector!
= National
Avg.
New REAC Compilation Bulletin
Effective October 2, 2017
Incorporates all previous guidance that
HUD has given on several matters
pertaining to physical inspections.
It provides answers to some of the most
common questions received from inspectors
in the field and clarifies certain areas of the
inspection protocol to further ensure that
physical inspections are objective and
conducted in accordance with the
protocol.
Preparing for REAC Inspections:
The Quick and Easy
Inspector Notice 2015-02; Effective
2/22/16 -- Inspector Business Rules
Update to the Business Rules Inspectors must
follow to conduct accurate, reliable and
replicable inspections of properties.
Rule Change – Inspectors must conduct 25
REAC Inspections a year to maintain active
status.
• This could negatively affect some Inspectors
Inspectors may no longer “shadow” another
inspector during a REAC inspection.
Preparing for REAC Inspections:
The Quick and Easy
Inspector Notice 2016-03; Effective 8/1/16
- UPCS Deficiencies & Industry Standards
Addresses substandard repairs as identified by
HUD QA.
Provides guidance on repairs regarding
acceptable materials.
o Repairs are to be completed using the same design
and quality of the original surface/material.
Deficiencies will be recorded for each
substandard repair as if the issue was still visible.
o “…intended to disguise a UPCS deficiency”
Owner/Agents may still use the appeal process
to recoup lost points if they believe a corrected
deficiency was adequately addressed within an
acceptable industry standard.
The Notice was intended to provide
clarification on certain areas, but has
resulted in more uncertainty!
REAC – New Guidance
Let’s look at HUD’s criteria:
REAC – New Guidance
Holes in wall
Unacceptable Fixes
REAC – New Guidance Holes in wall cont.
Remember to
texture and paint
to match rest of
wall.
Acceptable Fix – Large Hole
Replace and use of tape and mud is the correct
means of repair
REAC – New Guidance Holes in wall cont.
Acceptable Fix – Small Hole
Using tape and mud is the correct means of repair
Remember to
texture and paint
to match rest of
wall.
If it’s an access panel, it needs to be finished out with trim.
If not finished out
in trim, the
inspector may
make you
remove it to
verify.
REAC – New Guidance Damaged Doors & Frames
Unacceptable Fixes
Acceptable Fixes
Wood or wood veneer is the correct material of repair
REAC – New Guidance Cracks in Brick Walls
Unacceptable Fixes
Acceptable Fixes
Tuck-pointed using mortar is the correct means of repair
Mortar Sealant
is OK too!
REAC – New Guidance Damaged Downspouts
Unacceptable Fixes
Acceptable Fixes
Same materials, shape and design. Plastic or PVC piping is
not acceptable unless used at base to tie into storm drains;
however, it must be painted to mach rest of piping.
REAC – New Guidance Erosion
Unacceptable Fixes
Acceptable Fixes
Correcting the root cause is the correct means of repair
Do Not use mulch,
straw or other type
material!
Dirt is still OK as
long as used
sparingly!
REAC – New Guidance Electrical Panels
Unacceptable Fixes
Acceptable Fixes
Installing / realigning panel cover or installing blank
covers is the correct means of repair
Caulk is a
foreign
substance!
Do Not
use tape!
REAC – New Guidance Overgrown Vegetation
Unacceptable – shows signs of damaging fence.
Acceptable
How is my property seen in REAC’s eyes?
The Property Profile will be confirmed by
the Inspector the day of the inspection.
Preparing for REAC Inspections:
The Quick and Easy
Your property starts with a pre-established
Nominal Percentage for the 5 inspectable
areas.
As items are entered N/A by the inspector,
the nominal points will shift to align with the
actual possible points for your property.
Preparing for REAC Inspections:
The Quick and Easy
Therefore, it is very important for the inspector to
get the Property Profile correct!
Rare to see
or standard points for HUD’s average property
nationally
All Property Profile changes must be confirmed
with TAC before proceeding. This could cause
delays!
Each of the 5 inspectable areas has a
Maximum Point Loss for a single deficiency.
Preparing for REAC Inspections:
The Quick and Easy
Observed deficiencies will have 4 components:
1. Inspectable Area
2. Item Location
3. Defect Observed
4. Severity Level
Except for the units; it’s
about ½ to ¾ of the
points.
How is my property scored?
Preparing for REAC Inspections:
The Quick and Easy
As you can see, the more
units you have the smaller
the sample size is in
comparison to the overall #
of units.
A sample of units will be
selected by the Inspector
via REAC’s Rapid software.
1 Day
2 Days
2.5 Days
3 Days
New Protocol has Inspectors
taking pictures of all Level 3
deficiencies; including the FHEO
Accessibility Routes.
Ok, so that is all good information, but
where do I start when preparing for the
inspection?
Preparing for REAC Inspections:
The Quick and Easy
A good place to start is your last
inspection.
• Look for systemic deficiencies.
• Confirm all deficiencies were
mitigated.
• Take note of units inspected.
Review HUD Guidance and any
Previous Training Materials
• Top 20 Deficiencies (National)
• Top 25 Deficiencies –
Multifamily
• “Preparing for REAC
Inspections” Guidance
• New Compilation Bulletin
Remember: The site is the most important area,
because it is never diluted in points and as such the %
point losses result in higher point deductions!
Most likely some will duplicate!
Conduct a Complete 100% Inspection of the
Property.
Ensure staff understand the importance of the
inspection and achieving a high score.
Follow the same format as the inspector will:
• Site Inspection
• Building Exterior(s) Inspection
• Building System(s) Inspection
• Common Area Inspection
• Unit Inspection - ALL
Preparing for REAC Inspections:
The Quick and Easy
Download the Same Inspection Software the
Inspector will use to Perform the Inspection
(Public Version) and Perform your Own
Inspection.
https://www.hud.gov/sites/documents/rapi
djass13_3_0_0.exe
It is Available in Hard Copy as well.
Having a Copy of the Following Documents
Available is a good idea as well: 1) REAC Compilation Bulletin / Protocol -
https://www.hud.gov/sites/dfiles/PIH/docu
ments/newpasscb.pdf
2) Dictionary of Definitions -
https://www.hud.gov/sites/documents/appe
ndix2-finaldictionary.pdf
Preparing for REAC Inspections:
The Quick and Easy
Or Get
the
BOOK!!!
The Field Guide I recommend.
Preparing for REAC Inspections:
The Quick and Easy
There’s an
APP too!
- iPhone Only!
$0.99
Preparing for REAC Inspections:
The Quick and Easy
Inspection Day is Here
Have all necessary information available for
the inspector:
• Notification Letter
• Property Map
• Rent Roll
Escort the Inspector how you would like to
proceed. They will let you know if they have
issues with the route.
Don’t question every deficiency. Be selective.
• An irritated inspector is not good.
Takes notes and pictures of ALL deficiencies
identified by the inspector. They are required
to call ALL of them out along with the Level.
• Make sure camera’s day/time stamp is accurate.
This will help with any appeal items.
Use the Inspectors
Checklist to HELP!
Try to avoid problem areas!
Preparing for REAC Inspections:
The Quick and Easy
Should I Appeal Deficiencies Noted by the
Inspector that we Do Not Agree with?
HUD / REAC Encourages Owner / Agents
to Submit Appeals for Deficiencies
Indentified that are Questionable.
There are 2 Types of Appeals:
1. Technical Reviews
A review of…..
2. Database Adjustments
A review of…..
Appeals Help HUD
• Make Protocol Changes
• Change Deficiency Definitions
• Train Inspectors
Preparing for REAC Inspections:
The Quick and Easy
What is a Technical Review?
An Objectively Verifiable and Material error
that could result in a higher score.
Property Profile Errors
Non-Existent Deficiencies
These are the Most Common
However, you can’t appeal:
Level of Deficiencies
Corrected Deficiencies
0 Point Loss Deficiencies
What is a Database Adjustment?
Requested for circumstances that are out of
the ordinary.
Local Conditions & Exceptions
Ownership Issues
Conditions Beyond the Owner’s Control
Modernization Work
Verification must
come from a valid 3rd
Party source:
• Fire Marshall
• Police Chief
• Architect/Engineer
• Field Expert
Preparing for REAC Inspections:
The Quick and Easy
REAC Policy Update Regarding the Appeal
Process.
Effective February 1, 2016, the results of your
appeal will be sent via email only from HUD.
A hard copy will no longer be sent.
Therefore, it is very important to ensure your
email address, as provided to the Inspector the
day of the inspection, is accurate.
HUD’s Email Notification Language
In keeping with technological advances and in an effort to reduce the
time in communicating the results of the technical review /
database adjustment, all responses will be emailed to the
originator of the request. The primary contact listed in the
inspection summary report will be cc’d on the response as well.
This is the only change in the appeal process. Appeal requests /
submissions will still need to be submitted through the mail.
Remember that this is a snapshot in time and not
all units and buildings, if multiple exists, will be
inspected.
Scoring Example:
Preparing for REAC Inspections:
The Quick and Easy
This hole is considered a
Level 3 because it
penetrates an adjoining
room.
99.8
So How do I know the Weight, Criticality &
Severity %’s?
• HUD’s Dictionary of Definitions Document
• Other Resources
Preparing for REAC Inspections:
The Quick and Easy
Higher the Criticality = Higher the Point Loss
Anything you start
multiplying by 5 will result in
high point losses
Understanding Scoring & Levels
Preparing for REAC Inspections:
The Quick and Easy
Site
Unit Exposed
Wires
Exposed
Wires
Deficiency Definitions
Bldg Syst
Bldg Ext Exposed
Wires
Exposed
Wires
7.5 points
1.3 points
0.7 points
0.7 points
* Based on a 21 Building Property with 100 Units
Preparing for REAC Inspections:
The Quick and Easy
Site: Exposed Wires - Level 3
Scoring
(Area Points x Item Weight x Criticality x Severity)
15 x 0.125 x 5.0 x 1.0 = 9.4 points 7.5 points max. loss
Other Examples:
• Old lighting that
has been removed
(capped wires)
• Automatic gate
openers / closures
Preparing for REAC Inspections:
The Quick and Easy
Unit: Exposed Wires - Level 3 100 Unit Property – 21 Units Sampled
Scoring
(Area Points x Item Weight x Criticality x Severity / # Units)
35 x 0.15 x 5.0 x 1.0 / 21= 1.3 points
Preparing for REAC Inspections:
The Quick and Easy
Bldg Exterior: Exposed Wires - Level 3 28 Bldg Property – 21 Bldgs Sampled
Scoring
(Area Points x Item Weight x Criticality x Severity / # Bldgs)
15 x 0.184 x 5.0 x 1.0 / 21 = 0.7 points
13.8 points for a 1
Bldg Property –
caps at 10 points
though!
Preparing for REAC Inspections:
The Quick and Easy
Bldg Systems: Exposed Wires - Level 3 28 Bldg Property – 21 Bldgs Sampled
Scoring
(Area Points x Item Weight x Criticality x Severity / # Bldgs)
20 x 0.155 x 5.0 x 1.0 / 21 = 0.7 points
15.5 points for a 1
Bldg Property –
caps at 10 points
though!
Watch your Bldg Systems in High Rises - the
places you never go (look behind the systems)!
In this type Bldg, CA points are high –
averaging 12.2 Pts
Preparing for REAC Inspections:
The Quick and Easy
Damaged / Missing Gates
Damaged / Falling / Leaning
Holes / Missing Sections
Just as important as understanding your point breakdown,
is the understanding of the deficiency itself.
4.5 Points – Safety/Security
Missing gate designed to keep
children in or out.
1.7 Points – Non Safety/Security
Privacy fence – missing sections,
greater than 25%.
4.5 Points – Safety/Security
Missing sections. Designed to
keep people in or out.
Universal definition of exterior fence does not
include safety / non-safety due to legal issues.
HUD is behind on their deficiency definitions.
Let’s look at the SITE a little more with
common issues I see:
Preparing for REAC Inspections:
The Quick and Easy
What else?
Check everywhere as one small area can cost
you all the points.
Preparing for REAC Inspections:
The Quick and Easy
Preparing for REAC Inspections:
The Quick and Easy
Expansion joints / shifting of wood
Check your fences & walkways too!!!
Preparing for REAC Inspections:
The Quick and Easy
Or are your trees pretty smart?
Preparing for REAC Inspections:
The Quick and Easy
Preparing for REAC Inspections:
The Quick and Easy
Preparing for REAC Inspections:
The Quick and Easy
Both of these areas are
based on %’s before a
deficiency is noted.
This is the reason these
#’s are important in the
profile.
Rapid 4.0 will calculate
this as the Inspector
identifies damaged
areas and sq. feet
affected.
10%
10%
Preparing for REAC Inspections:
The Quick and Easy
If you lift your feet more than 3
consecutive times, a handrail is required!
Landing Exception
Do
retaining
walls
count? It
depends
on height.
Preparing for REAC Inspections:
The Quick and Easy Now for Building Exteriors:
Spalling has a
10% threshold
Preparing for REAC Inspections:
The Quick and Easy
Preparing for REAC Inspections:
The Quick and Easy
Most Common
Preparing for REAC Inspections:
The Quick and Easy
Watch your drip edges too!
Preparing for REAC Inspections:
The Quick and Easy
Cracked / Broken = Defect
Preparing for REAC Inspections:
The Quick and Easy
Did I Mention Building Systems?
Check the actual
pipe for cracks
too!
Preparing for REAC Inspections:
The Quick and Easy
What do they do when tested? Something!
Preparing for REAC Inspections:
The Quick and Easy
What is Missing?
Is the Ring Present?
This is one of the highest Bldg Syst point loss
items regardless of area located (CA/Units)!
REAC considers Resident
Owned inspectable too as
if property owned, but zero
point loss – H&S Other
Preparing for REAC Inspections:
The Quick and Easy Resident Damage or Normal Wear &
Tear?...Now we will talk about the Common
Areas and Units.
Rounded Ground Eye
Preparing for REAC Inspections:
The Quick and Easy
Are They
Worth the
Fix?
Tape when you can!
Freezers usually have ice
accumulation as well –
don’t get hit twice!
_______________________________________________
Trip Hazards inside the units are now zero point loss;
however, the Health & Safety is still there.
Preparing for REAC Inspections:
The Quick and Easy
MUST Have
Water Too!
Is all Daylight at entry doors bad (Level 3)? Only if
the door was designed to have weather stripping is it a
deficiency. Look at your frame too though. _____________________________________________
Preparing for REAC Inspections:
The Quick and Easy
Preparing for REAC Inspections:
The Quick and Easy
Is the
cover on?
New Industry Standards
3-4 inches wider
& taller
Preparing for REAC Inspections:
The Quick and Easy
How many live / dead
roaches are you allowed in
the unit before you receive
a L3 deficiency?
• 1 Live
• 2 Dead
Preparing for REAC Inspections:
The Quick and Easy
Check
These
Too…
Allowed
¼”
Preparing for REAC Inspections:
The Quick and Easy
While we are on breaker boxes (electrical
boxes) lets review HUD’s Protocol for
Inspecting Such Devices.
• Timer Boxes
• Disconnect Boxes
• Panel Boxes
This protocol provides direction to the
inspectors when they come across such
Electrical Boxes.
Mostly regarding the Lock / Unlocked
aspect.
My recommendation is to Zip Tie Shut or Lock all
like type boxes; however, ensure Panel Boxes are
ok inside.
They Inspector MAY NOT remember they have to
open them!
Preparing for REAC Inspections:
The Quick and Easy
These are new A/C Disconnect boxes being
used during rehabs and energy upgrades.
For now, treat as A/C Disconnect boxes until
HUD releases new guidance. Therefore, the
GFI does not have to be tested if the box is
locked.