  • Central Wastewater Treatment Plant

    Optimization Study Prepa red fo r

    Met ropo l i ta n Gove rnm ent o f Nash v i l le a nd Dav id son Cou nty

    DRAFT

  • Central Wastewater Treatment Plant Optimization Table of Contents

    Table of Contents List of Figures ........................................................................................................................................................... iv

    List of Tables ............................................................................................................................................................. iv

    List of Abbreviations .................................................................................................................................................. v

    Executive Summary .................................................................................................................................................. 1

    APPENDICES IN VOLUME 2

    Appendix A: Tasks 1 and 2 Evaluation of Wastewater Flows and Loads

    TM 1: Flows and Pollutant Loading Analysis

    Appendix B: Task 3 Plant Hydraulic Evaluation

    TM 3: Plant Hydraulic Evaluation

    Appendix C: Task 4

    TM 4.2: Wastewater Characterization Study Results

    TM 4.3: Process Model Calibration and Validation

    Appendix D: Task 5

    TM 5.1: Plant Hydraulic Capacity Assessment and Alternatives Evaluation

    TM 5.2: Potential Improvements at South Grit Facility

    TM 5.4: Process Capacity Assessment and Alternatives Analysis of CWWTP

    TM 5.5: Low Pressure Aeration System Upgrades

    Appendix E: Task 6

    TM 6.1: Wet Weather Treatment Alternative Analysis

    Appendix F: Task 7

    TM 7: Disinfection Feasibility Study

    Appendix G: Task 9

    TM 9.1: Preliminary Cost Estimate

    Appendix H: Task 10

    TM 10: Plant Operations Review and Support

    Appendix I: Task 15 Quick Fixes

    TM 15: Quick Fixes

    Appendix J: Project Meetings and Presentations

    Brainstorming Meeting 12/15/11

    Cold Weather Sampling Kickoff 01/19/12

    Project Kickoff 02/16/12

    iii

    Use of contents on this sheet is subject to the limitations specified at the end of this document. Central Optimization - Executive Summary modified

  • Central WWTP Optimization Study

    Disinfection Kickoff 05/07/12

    Results Workshop 08/02/12

    Brainstorming Workshop 08/29/12

    Stormwater Phase 12 Kickoff 10/19/12

    Alternatives Development 12/12/12

    Central Disinfection Results & Alternatives Review 05/30/13

    List of Figures Figure 1. Summary of Capacity Results .................................................................................................................. 8

    Figure 2. Conceptual Aeration Tank Configuration .............................................................................................. 12

    Figure 3. Potential Return Splitter Box Configurations ........................................................................................ 13

    Figure 4. Existing Mixed Liquor Slide Gate ........................................................................................................... 13

    Figure 5. SC Flow Meter Discharge Piping Existing Conditions ........................................................................... 14

    Figure 6. SC Flow Meter Discharge Piping with 45-bend Removed .................................................................... 14

    Figure 7. Existing Pipe Chase North Chlorine Area............................................................................................... 15

    Figure 8. Potential EFTU Configuration including Old South Plant Tankage...................................................... 18

    List of Tables Table ES-1. Summary of Existing and Achievable Optimized Capacities .............................................................. 2

    Table ES-2. Scope of Work and Description of Tasks for the Central Optimization Study................................... 2

    Table ES-3. Summary of Future Influent Flows and Pollutant Loadings for the Central WWTP .......................... 4

    Table ES-4. Modeling Tools and Field Testing Utilized for the Central Optimization Project ............................... 5

    Table ES-5. Summary of Existing Hydraulic and Process Capacities .................................................................... 8

    Table ES-6. Comparison of Peak CWWTP Capacities Assumed by the LTCP and Achievable via the COPT Project ..................................................................................................................................................... 17

    Table ES-7. Summary of Proposed Alternatives and Costs ................................................................................. 23

    ES iv

    Use of contents on this sheet is subject to the limitations specified at the end of this document. Central Optimization - Executive Summary modified

  • Central Wastewater Treatment Plant Optimization Table of Contents

    List of Abbreviations AT Aeration Tank

    BC Brown and Caldwell

    CCT Chlorine contact tank

    cf cubic foot

    CFD Computational Fluid Dynamics

    cfm Cubic feet per minute

    COPT Central Optimization

    CPS Central Pump Station

    CSO Combined sewer overflow

    CSS Combined sewer system

    CWWTP Central Wastewater Treatment Plant

    DAFT Dissolved Air Flotation Thickener

    DO Dissolved Oxygen

    DoJ Department of Justice

    dtpd Dry tons per day

    EPA Environmental Protection Agency

    EFTU Excess flow treatment unit

    F Fahrenheit

    FOG Fats, oils and grease

    ft Foot

    FM Forcemain

    hr Hour

    kW Kilowatt

    lb Pound

    LF Linear foot

    LTCP Long Term Control Plan

    MLSS Mixed liquor suspended solids

    MGD Million gallons per day

    MWS Metro Water Services

    NGF North Grit Facility

    NPDES National Pollutant Discharge Elimination System

    O&M Operations and maintenance

    psi Pound per square inch

    PS Pump station

    PST Primary settling tank

    SGF South Grit Facility

    SC Secondary clarifier

    sq ft Square foot

    TM Technical Memorandum

    TDEC Tennessee Department of Energy and Conservation

    TS Total solids

    VFD Variable frequency drive

    VS Volatile solids

    VSR Volatile solids reduction

    WWTP Wastewater Treatment Plant

    v

    Use of contents on this sheet is subject to the limitations specified at the end of this document. Central Optimization - Executive Summary modified

  • Central WWTP Optimization Study Executive Summary

    Central Biosolids Facility

    Central Wastewater Treatment Plant

    Executive Summary

    Metro Water Services (MWS) selected Brown and Caldwell (BC) to perform an optimization study for the Central Wastewater Treatment Plant (CWWTP) in Nashville, TN. The purpose of the MWS Central Optimization (COPT) Project is to determine the current plant hydraulic and process capacities, identify and eliminate capacity limitations, and increase the peak wet weather secondary treatment capacity of the CWWTP while minimizing construction of new process tankage. An evaluation of the Central Biosolids Facility is also being performed to

    identify necessary improvements of the solids process to achieve the optimized capacity. Additional goals include improving plant operability, maintainability, reliability and energy efficiency. Recommendations from this study will be used to develop a scope of work for design and implementation of the improvements, a portion of which may be performed in conjunction with the COPT Project.

    In accordance with the Consent Decree enacted by the Environmental Protection Agency (EPA), Department of Justice (DoJ) and the Tennessee Department of Environment and Conservation (TDEC) in March 2009, and the Long Term Control Plan (LTCP) submitted by MWS to these agencies in September 2011, MWS has committed to a reduction in combined sewer overflow (CSO) frequency at the Kerrigan CSO. MWS proposed a combination of treatment at the CWWTP and equalization (EQ) storage to achieve the committed CSO control frequency. Increased CWWTP treatment capacity identified as part of this optimization study will reduce the amount of EQ storage required.

    Summary of Optimization Study Results Based on the results of the COPT project and through the recommended process and hydraulic improvements at the CWWTP, it was determined that the CWWTP has an achievable optimized secondary treatment capacity of 350 million gallons per day (MGD), with an additional 80 MGD of wet weather treatment through the Excess Flow Treatment Unit (EFTU), for a total peak wet weather treatment capacity of 430 MGD.

    As discussed further throughout this report, plant improvements are recommended that will increase secondary treatment capacity, reduce energy usage, minimize reliance on complicated automation and also optimize process control which will result in a more reliable and operable WWTP.

    Table ES-1 below provides the existing and achievable flow through secondary treatment at the CWWTP, based on different biological treatment options and hydraulic capacity determined as part of this study. As can be seen from the total achievable plant flow through secondary treatment, the hydraulic capacity of the existing infrastructure is the limiting factor for overall plant capacity.

    ES 1

    DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document.