Financial ManagementFinancial Management( MGT201 )( MGT201 )

Internal Rate of Return (IRR)Internal Rate of Return (IRR)

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

I R RI R R

Internal Rate of ReturnInternal Rate of Return

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

What is IRR ? The discount rate often used in capital budgeting that

makes the net present value of all cash flows from a particular project equal to zero.

Generally speaking, the higher a project's internal rate of return, the more desirable it is to undertake the project.

As such, IRR can be used to rank several prospective projects a firm is considering. Assuming all other factors are equal among the various projects, the project with the highest IRR would probably be considered the best and undertaken first.

IRR is sometimes referred to as “Economic Rate of Return (ERR)".

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

FINDING IRR(Trial & Error Method with Interpolation Formula)

A project involves an initial outlay of Rs. 240,000. The estimated net cash flows for the project are as given:

The company’s required rate of return is 13 percent.

Calculate the IRR for the project. Is the project feasible assuming all other factors are equal ?

Years Cash Flows (Rs.)

1. 140,000

2. 80,000

3. 60,000

4. 20,000

5. 20,000

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

Trial & Error Method(By applying different discount rates)

At 15 % discount rate:

NPV = - 240,000+[140,000/(1.15)]+[80,000/(1.15)2]+[60,000/(1.15)3]+[20,000/(1.15)4]+[20,000/(1.15)5]

= - 240,000 + 121,739 + 60,491 + 39,450 + 11,435 + 9,944

= - 240,000 + 243,059

= Rs. 3,059

At 17 % discount rate:

NPV = - 240,000+[140,000/(1.17)]+[80,000/(1.17)2]+[60,000/(1.17)3]+[20,000/(1.17)4]+[20,000/(1.17)5]

= - 240,000 + 119,658 + 58,441 + 37,463 + 10,673 + 9,122

= - 240,000 + 235,357

= Rs. – 4,643

Prepared

~ by ~

Instructor

MGT201

FindingBy using 15% rate we have a positive figure that is greater than zero whereas by using 17% rate we have a negative figure that is lesser than zero. NPV appears to be zero between 15% and 17%, so IRR is somewhere in that range. By using INTERPOLATION Technique or Formula, we can find that the IRR is about 15.79%.

Virtual University of Pakistan

Prepared

~ by ~

Instructor

MGT201

0.15 Rs.3,059

IRR 0

0.17 -Rs.4,643

X Rs.3,059.02 Rs.7,702

Rs.3,059X

=

Interpolation Technique(For Finding IRR)

0.02 Rs.7,702

Rate NPV

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

Interpolation Technique(For Finding IRR)

IRR = Lower Rate + XIRR = 0.15 + 0.0079IRR = 0.1579 or 15.79%

X

Prepared

~ by ~

Instructor

MGT201

OR

Virtual University of Pakistan

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

IRR = Lower discount Rate + Difference between the two discount rates x (NPV at lower discounted rate / absolute difference between the NPVs of the two discount rates)

= 15 + ( 17 – 15 ) x ( 3,059 / (3,059 – ( - 4643 )) = 15 + 2 x ( 3,059 / 7,702 ) = 15 + 2 x 0.3972

= 15 + 0.7944

IRR = 15.79 % Approx.

Interpolation Formula(For Finding IRR)

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

Now Applying 15.79%, We have NPV nearer to Zero

NPV = -240,000+[140,000/(1.1579)]+[80,000/(1.1579)2] +[60,000/(1.1579)3]+[20,000/(1.1579)4]+[20,000/(1.1579)5]

= - 240,000 + 120,909 + 59,669 + 38,649 + 11,126 + 9,609

= - 240,000 + 239,962

NPV = Rs. 38 Nearer to Zero

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

Project Feasibility

The project is feasible as its Internal Rate of Return (IRR) is greater than the company’s required rate of return, assuming all other factors are equal*.

*( If there are two mutually exclusive projects and both have IRR greater than the company’s required rate of return then the project with higher NPV will be preferred. In other words, other capital budgeting techniques will be employed. )

Prepared

~ by ~

Instructor

MGT201

Virtual University of Pakistan

Dear Students !

It is hoped that…..You’d be now able to find out IRR easily.

. . . GOOD LUCK . . .

Instructor MGT201Virtual University of

Pakistan