1
(B)
PREFEASIBILITY REPORT
OF
EXISTING ordinary sand
MINING PROJECT
OF
Ashokbhai Khushalbhai Ode
AT VILLAGE:- Sayar,
TALUKA:- Karjan,
DIST.:-VADODARA
CONTENTS
2
1.0 INTRODUCTION
1.1 PREAMBLE
2.0 EXECUTIVE SUMMARY
3.0 INTRODUCTION OF THE PROJECT /BACKGROUND
INFORMATION
4.0 PROJECT DESCRIPTION
4.0 AVAILABLITY OF RAW MATERIAL
5.0 SELECTION OF SITE & LOCATION OF STONE MINE
6.0 PLANNING BRIEF
7.0 EXISTING INFRASTRUCTURE
8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
9.0 PROJECT SCHEDULE & COST ESTIMATES
10.0 ANALYSIS OF PROPSAL (FINAL RECOMMENDATION)
3
1.0 INTRODUCTION
1.1 Preamble
ordinary sand is base of all types of Building works, Construction of Road,
Construction of Cement Concrete road and infrastructure. The need of ordinary sand
is in all fields are very essential as it is a compulsory material for all types of
construction, and Industries fields, ordinary sand Mines are providing employments to
the local Labour in Rural area, as the labour of rural area have no any work for labour,
They are Unemployed, Thus this Existing mine is providing work to many labours and
it is a good employment.
2.0 Executive Summary
ASHOKBHAI KHUSHALBHAI ODE is an existing mine, as the demand of
construction material in all sectors are highly necessary, and this project will provide
and try to fulfill major demands of ordinary sand in complete around area. About
01.00.00 hectare of land is under possession of ASHOKBHAI KHUSHALBHAI
ODE At, Village : KARJAN, Taluka : SAYAR, Dist : VADODRA. As per the statuary
obligation this project needs environmental clearance from department of Environment
and forest dept.(GPCB) Gujarat. It is Existing lease and to start quarrying
operations (production) Accordingly project proponent has submitted form 1, pre-
feasibility report and copy of Approval letter from department of mines and geology
Gujarat, to the state level environmental assessment authority of Gujarat constituted
by MOEF, GOI for issuing environmental clearance, as per EIA, September 14.2006
notification but the term of S.E.A.C. and S.E.I.A.A. of Gujarat is expired in July - 2013.
3.0 Introduction of the Project/Background information :
1 Name of the Existing unit ASHOKBHAI KHUSHALBHAI ODE
2 Registered Office AT-KARJAN, TA-SAYAR, DIST-VADODRA
3 Location of Existing unit Village : KARJAN,SR NO. 424 OPP. / NARMADA
RIVER - 01.00.00 HA,Taluka : SAYAR Dist : VADODRA.
(Gujarat)
4 Name of Owner ASHOKBHAI KHUSHALBHAI ODE
4
3.2 Brief description of nature of the project :
It is an existing plan of ordinary sand Quarrying, it will contains ordinary sand
which will be used in construction of infrastructures and road, railways and building
construction etc.
3.3 Demand - Supply Gap :
As sand is used as raw material in construction of building and infrastructure
projects, the demand of sand is increasing day by day. In past, demand was not too
much but now a days due to rapid industrialization and urbanization its demand
increasing with pace of time. At present, demand of sand is more than the supply.
3.4 Imports vs. Indigenous Production :
In VADODRA of Gujarat, a number of sand mines are there. There is abundance of
sand in the area; it had become a major source of economy in the area/region.
3.5 Export Possibility :
There is ban on sand export to other states in the Gujarat by Private so export
possibility of river sand from this area is nil.
Major consumers of sand located almost in nearby areas in the district.
3.6 Domestic / Export Markets :
Sand produced is used locally as well as circulated in nearby area. So clearly there is
a huge market of sand in the area.
3.7 Employment Generation (Direct and Indirect) due to the project :
By this mining project of river sand in the area, peoples get employment, The
project directly generates the employment for the local people and indirectly for
the others. Also the marketing of the product generates the employment for
peoples. By this project, approximately Skilled labours-3 and Unskillled 10 to 15
labours on project site.
4.0 Project Description
4.1 type of project including interlinked and interdepended project if any :
No other material is interliked with this mining work.
4.2 Location (map showing general location, specific location and project
boundary & project site layout) with co-ordinates :
5
The area has been marked on Google map including the mining lease location. This
comprises the mining lease area near village : KARJAN, taluka: SAYAR, Dist :
VADODRA of Gujarat location of the mining lease is as under.
Location map
The geographical location of
the project is as follows :
6
SR.NO Latitude (N) Longitude (E)
A- 21°52'0.36"N 73°14'21.45"E
B- 21°51'56.90"N 73°14'22.57"E
C- 21°51'57.86"N 73°14'25.56"E
D- 21°52'1.15"N 73°14'24.36"E
4.3 Detail of alternate site, considered and the basis of selecting the existing
site, particularly the environment considerations gone into should be
highlighted :
No other site is considered for the existing project. The land has been allocated by
government for the mining only. As sand in the river is replenished every year by river
so, site is adequate for sand mining.
4.4 Size or magnitude of operation : B category manual.
The existing capacity N.A. / year 6000 TPM. Total area of mining lease is 01.00.00
Ha.The mining operation will be @ 6000 Tonne Production of River sand per annum.
4.5 Project description with process details ( a schematic diagram/flow chart
showing the project layout, components of the project etc. is given below:
Open cast mining
Fencing
7
4.6 Raw material required along with estimated quantity, likely source,
marketing area of final products. Mode of transport of raw materials And
finished products :
No raw material is required during the mining process.
4.7 Resource optimization / recycling and reuse envisaged in the project. If any,
should be briefly outlined :
As a result of extraction of mineral, the rate of recharging of ground water is likely to
be increased considerably.
4.8 Availability of water its source, Energy/power requirement and source
should be given :
Total water requirement in the mine will be about 3.0 KLD for drinking & domestic use,
dust suppression and plantation. Drinking water will be available by water tanker from
nearby village KARJAN. Diesel will be used in dumpers and tractors.
Nearly village KARJAN is well electrified.
4.9 Quantity of wastes to generated (liquid and solid) and scheme for their
Management/disposal :
No waste will be generated. All the material is saleable.
4.10 Schematic representations of the feasibility drawing which give
information of EIA purpose :
According to MOEF mining project containing area ≤5 Ha. Are considered in
category B2. Schematic representations of the feasibility is as under.
OB removal
Loading
Transportation to end use
8
5.0 site Analysis
5.1 Connectivity
Mine site is well connected with road transport. Nearest railway station is at
CHANDOD RAILWAY STATION (5 km) of mine site. State Highway No. GJ SH 160
(2.93 km). VADODRA is the District centre and all the primary facilities like education,
health centres including hospitals govt. as well as private, religious places are
vailable. District centre VADODRA is connected by GJ SH 160 is 2.93 km. away
from lease area.
Project Concept and Site selection
From 1 pre - feasibility project report wi th
existing TOR to MOEF (EAC)
Scoping by SEAC (site visit by sub group of
SEAC, if necessary
Ategory B2 – EIA not required
Appraisal and recommended by SEAC
Appraisal by SEAC
Display on the SPCB/UTPCC website &
project proponent website
9
5.2 Land Form - Land use and land Ownership :
The area of lease is 01.00.00 Ha. (SR NO. 424 OPP. / NARMADA RIVER - 01.00.00
HA). The lease areaforms part of No forest land is involved in leased area. Details are
given in below table.
S.NO Type Land Of Area
in (Ha.)
Near
Village
Tatuka District State
1 On River bed
SR.NO- 424 opp.
NARMADA
RIVER - 01.00.00
HA
01.00.00 KARJAN SAYAR VADODRA Gujarat
5.3 Topography (Google image):
The lease area is situated nearby village Sayar. Topographically, the area is almost flat &
river bed area.
5.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies
including area under CRZ), shortest distances from the periphery of the
project to periphery of the forests, national park, wild life sanctuary,
eco sensitive areas, water bodies(distance from the HFL of the river),
CRZ. In case of notified industrial area, a copy of the Gazette notification
should be given:
1
0
Nearest
Sensitive Area
Name Distance from
the Project
within 10 kms
a)Reserve Forest N.A.
There is no
reserve or
protected forest
within 10.0 kms
of lease area.
b) National
Park
c) Wild life
Sanctuary
N.A.
There is no
national park or
wild life
sanctuary within
10.0 km of lease
area.
d) Eco sensitive
areas
N.A.
There is no eco
sensitive area
within 10.0 km
of lease area
e) Water source
(a)Ground water
map
N.A.
No big water
reservoir is
within 10.0 km
of lease area
The grounder
water level is 10
to 15 mt. deep
The project is
located in
seismic zone-3
There is no
flood.
Cloudburst and
and landslide
reported so far.
1
1
f) CRZ
There is no
C.Z.R. within
10.0 km
periphery of
lease area
5.5 Existing infrastructure:
Mine office is existing in lease area. A well equipped first aid facility is existing to be
available at there. Temporary rest shelter urinal and latrine are established. Water
will be purchased from nearby tube well from nearby villages. A small water tank also
exists in mine office premises. This can be used for supply of water to drinking
purposes.
5.6 Soil classification:
Soil of the region falls within Average rain fall zone of 850-900 mm. The soils are
sandy loam, shallow depth reddish-black soils.
5.7 Climatic data from secondary sources :
The climate here is considered to be a local steppe climate. There is not much rainfall
in VADODRA all year long. According to Köppen and Geiger, this climate is classified
as BSh. The temperature here averages 27.4 °C. The average annual rainfall is 827
mm.
5.8 Social Infrastructure available : N.A.
6.0 Planning Brief:
6.1 Planning Concept (type of industries, facilities, transportation etc.)
Town and country planning development authority classification:
No industries and town planning programmers in the existing area.
6.2 Population Projection:
No Human settlements near project area.
6.3 Land Use planning (breakup along with green belt etc):
1
2
Details will be given in land use pattern of quarry plan.
6.4 Assessment of Infrastructure Demand (Physical & Social):
There is no large infrastructure demand near to existing area.
6.5 Amenities / Facilities:
Not applicable as it is a small project.
7.0 Existing Infrastructure:
7.1 Industrial Area (processing Area): N.A. 7.2
Residential Area (Non Processing Area): N.A.
7.3 Green Belt:
The plant will follow the norms and will in process to develop 33% green belt in lease
area
7.4 Social Infrastructure: N.A.
7.5 Connectivity (Traffic and Transportation Road/Rail/Metro/Water ways etc):
Well connected with Road/Rail No metro and water ways.
7.6 Drinking Water Management (Source & Supply of water):
Drinking water will be procured from tube well Existing nearby.
7.7 Sewage system:
The domestic wastewater will be treated in the septic tank followed by soak pit.
7.8 Industrial waste management: N.A. 7.9
Solid waste management: N.A.
7.10 Power Requirement & Supply / Source: N.A.
8.0 Rehabilitation and Resettlement (R&R) Plan:
1
3
Policy to be adopted (Central / State) in respect of the project affected persons
including home outs tees, land outs tees and landless laborers (a brief outline to be
given): N.A.
9.0 Project Schedule & Cost Estimates:
9.1 Likely date of start of construction and likely date of completion (Time
schedule for the project to be given):
It is an existing project and applied for renewal.
9.2 Estimated project cost along with analysis in terms of economic viability of
the project:
No. Particulars
Amounts (Rs.)
1 Mining equipments
40,000/-
2 Trolley based water tanker
1,50,000/-
Total 1,90,000/-
The existing cost of the project is Rs. 2, 00,000/- and it is economically
10.0 Analysis of proposal (Final Recommendation):
Financial and social benefits with special emphasis on the benefit to the project will
create employment potential for approximately about 10 to 15 local people.
THANKS