Prefabricated Construction Systems for Building and Civil works

adopted in Hong Kong

Presented by

Raymond W M Wong

Division of Building Science & Technology

City University of Hong Kong

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 2/119

The presentation is based on a paper preparedby Raymond Wong for the

World Congress on Housing Process & Product,

Organized by the International Association for Housing Science

and hosted by the Concordia University,

Montreal, Canada, June 2003

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 3/119

Development and Application of PrefabricatedTechnology in Building Construction in HK

1. Had been used once in early 1970s in a pilot project toconstruct a series of 17-storey public houses

2. Used in a broader scale in the mid/late 1980s in theconstruction of public houses where all the façades of the

flats were constructed in precast in a after-fixed manner 3. Improvement to public houses by introducing in-situ joined

façade and broader use of other precast elements in

early/mid 1990s.4. A few private developments pioneered in the use of

prefabricated system in the construction of buildings of various nature since early 1990s

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 4/119

Development and Application (continue)

5. Packaged projects introduced from late 1990 onward by theHong Kong government for the construction of a series of schools using semi-prefabricated method

6. A series of government quarter buildings using similar construction techniques were introduced in 2000

7. A few special buildings such as bus depot or train stationpodium employed large amount of prefabricated elements of which some were primary structural members (1997 onward)

8. Popular use of prefabricated external wall from 2002 onwardin residential buildings due to the introduction of a newguideline encouraging the use of precast façades as a formof green elements in construction (exemption of Gross Floor

Area)

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 5/119

Generations of Public Houses(Harmony Block) constructed

using semi-prefabricated concept

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 6/119

First generation of HarmonyBlock using after-fix façade

Later version of Harmony Block using inisitu

façade cast at the same time with structural walls

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 7/119

Precasting yard was set up toproduce precast elements for publichousing projects in early to mid 1990

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 8/119

After-fix façade system requiredthe formation of small amount of in-situ joint and grouting thateasily caused leaking problem

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 9/119

Detail of façade installationusing in-situ jointing

arrangement in the later versionof Harmony Block Construction

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 10/119

Forming the floor slab in theHarmony Block constructionusing semi-slab (right) andaluminium formwork (above)

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 11/119

Introduction of mechanical

formwork systems incorporatingthe standard precast elements inthe construction of latest versionof public houses in the late 1990

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 12/119

Public houses using Concord

design with special emphasison the use of mechanicalisedconstruction system

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 13/119

Layout of the ConcordBlock showing theposition of the cast-in-situ core wall, shear walls and precast façade

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 14/119

Other pioneered projects in theearly 1990 constructed usingsemi-prefabricated concept

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 15/119

The construction of the Headquarter and MembersFacilities Complex for the Hong Kong Jockey Club

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 16/119

Forming the floor slab using precastsecondary beams and semi-slab for the mainbuilding (above) and members’ complex (right)

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 17/119

Detail of the floor system with thecast in-situ main beams and theplace-in precast secondary beams

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 18/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 19/119

Government quartersin West Kowloon

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 20/119

Layout of the quarter building showing typcial phasing arrangement of work

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 21/119

Features in the construction –extensive use of precastfaçade and lintel beams,precast cast-in-situ internalpartitions are also introduced

D t il f th f d d

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 22/119

Detail of the façade andthe lintel beam installation

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 23/119

Installation of the cast-in-situprecast internal partition

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 24/119

Construction of special buildingsusing high proportion of precast

since 1998

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 25/119

Kowloon Canton RailwayStation podium/deck

Construction of the KowloonCanton Rail podium deck –cargo handling bay on theground level and on top for alarge-scale residentialdevelopment afterward

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 26/119

Forming of the cast-in-situ main beams

J i ti d t il f th

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 27/119

Jointing detail of themain beam and precastsecondary beams

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 28/119

Semi-slab with RCtopping to form thecomposite podium deck

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 29/119

Kowloon Motor BusMaintenance Depot

- 3-level depot buildingwith columns, main andsecondary beams all inprecast

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 30/119

Erecting of the building frameusing precast columns and beams

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 31/119

Connecting the precast column to thefoundation cap with a base plate

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 32/119

Placing the secondary beams

onto the main beam

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 33/119

Connecting beams to columns bystitching, a means to provide anin-situ joints with rigid RC links

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 34/119

Detail of the beam/columnand beam/beam joints

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 35/119

Recent Residential/CommercialDevelopments using prefabricated

concept to construct

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 36/119

Residential developmentat Cyber Port

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 37/119

Façade and general installation details

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 38/119

Features in the construction –

large amount of external wallsare constructed in precastfaçade untis, with major structural links tie back to theinner shear walls and floor slab

Incorporation of other sophisticated formwork in construction –

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 39/119

Incorporation of other sophisticated formwork in construction steel gang form for walls and table form for floor

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 40/119

Residential Developmentat Taikoo Valley

Construction features –the use of large amountof precast units both of structural or architecturalnature. This includes the

balcony, façade units,loss-form for externalwalls and some shadingfins.

Detail of the precast balcony unit

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 41/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 42/119

Detail of the loss-form

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 43/119

Residential developmentat Ma Tau Wai

Overview of the precast

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 44/119

installation arrangement

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 45/119

Façade installation detailas seen on the floor deck

Cambridge House – a 42-storey

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 46/119

Office Building at Quarry Bay

Features in construction –

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 47/119

precast beam trough andprecast sub-slab with RCtopping forming the floor system

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 48/119

Placing of the precast beam troughto form the floor layout

R t A hi t f H K ’

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 49/119

Recent Achievements of Hong Kong’s

Prefabricated Technology

• Previous defects such as leakage problems have beenimproved

• Application diversified to other forms of construction

• Capable to apply to rather complicate-shaped buildings

• Incorporation of other advanced technology in the

construction (such as use with mechanical form/tensioned elements)

• Generally mastering of skill and growing popular

Future Trend in the application of

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 50/119

Future Trend in the application of

Prefabricated Technology in Hong Kong1. To increase the use of prefabrication for more structural

elements such as for beam, column or load bearing wall

2. Use more modulated elements or plug-in units

3. Use more for architectural or decorative elements

4. Incorporation of other composite elements in the designsuch as using at the same time with structural steel

5. Apply prefabrication more to medium-rise buildings withmore standardized structural items

6. Improve the supply chain management to makeproduction more efficient and economical

Practical Constraints

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 51/119

1. Tighter coordination to allow for structural design,construction planning, procurement & approvalprocedure

2. Required a critical amount of precast items before workcan be economically used

3. Huge work space for handling precast elements

especially in congested urban environment in HongKong

4. Congested site environment makes access anddelivery of heavy precast units to the work spotbecomes difficult

5. Quality assurance become critical especially wherelarge amount of precast components are used asstructural nature

Examples of very congested

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 52/119

Examples of very congestedconstruction environmentwhere prefabrication approachis adopted

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 53/119

Example of Innovative Project (Local)

The Integer

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 54/119

The Integer Houseat Admiralty

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 55/119

Floor plan of the experimental house

The orking concept

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 56/119

The working concept

Typical connection details

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 57/119

Assembly of the 3-D modules

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 58/119

Possible future development for high-rise structures using similar concept

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 59/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 60/119

Example of Innovative Project (overseas)

The Habitat 67 in Montreal, Canada

BuildingSection

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 61/119

Habitat 67 as seen along the bank of St Lawrence River

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 62/119

Habitat 67 as seen along the bank of St Lawrence River

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 63/119

Close up look of themodulated dwelling units

Close up look of the modulated dwelling

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 64/119

Close up look of the modulated dwelling

units and the linking structure in theform of a access corridor

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 65/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 66/119

View as seen onthe deck level

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 67/119

Forming and Installation of the modulated units

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 68/119

Installation of the modulated units and the associated structure

BuildingSection

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 69/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 70/119

Floor plan

Connecting the modules

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 71/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 72/119

Prefabricated Construction

Application in Civil Works

Examples of application of prefabricatedtechniques in civil construction works

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 73/119

techniques in civil construction works1. Used in highway projects such as cantilevered deck

of elevated bridge, parapets of expressway and road

curb2. Precast girder units or beams for elevated roadway

(viaduct)

3. Precast beams or decks for elevated pedestrianfootbridges

4. Tunnel lining especially for tunnel formed by tunnelboring machine

5. Decks for long span bridges

Examples of application (continue)

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 74/119

6. Marine work such as seawall and deck of terminalberth

7. Soil retaining element such as for earth-balancedtype retaining structure

8. Platform for railway station

9. Parapets and noise barrier panels

10. Overhanging ducts or services channels for

underground facilities11. Nullah section for storm water discharge

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 75/119

Elevated pedestrianfootbridge in Mong Kok

Piers formed usingprecast column

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 76/119

precast column

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 77/119

Precast girder erected

on top of the piers toform the main span of the footbridge

Extending precast plank toform the deck of the footbridge

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 78/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 79/119

Structural arrangementof the footbridge

Precast V-shape beamfor the Route 3elevated expresswayat Kwai Chung

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 80/119

g

Precast V-shape beam being lifted to pier head by launching gantry

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 81/119

Precast box-girder for the Rambler Strait Bridge of Route 3

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 82/119

Forming the elevated bridge of the West Kowloon Expressway

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 83/119

West Kowloon Expressway – installing the precast box girder using balanced cantilever method with the

help of track mounted gantry crane

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 84/119

Forming the elevated track of the West Rail using theslung launching girder

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 85/119

Forming the elevated track of the West Rail using the

longitudinal steel support beam

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 86/119

Forming the elevated track of the KCR Ma On Shan Line

by precast girder and lifted todeck level for erection usingmobile crane

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 87/119

Placing the precastgirder in position

Project example – Road T7 in Ma On Shan (TTD project)

Technical Features

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 88/119

1. Total length of viaduct – 2200m (approx.)

2. Span length – Average 40m

3. Total nos. of segment used – 790 nos.

4. No. of segment per span – average 14 nos.

5. Weight of segment – ranging from 50 to 98 tons

6. Weight of the launching machine – 310 tons

7. Max. weight of machine with segments – 1300 tons

8. Length of launching machine – 85m

9. Casting of the box-girder segment – match-cast

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 89/119

Construction of highway bridge using precast box-girder (viaduct) – Road T7 in Ma On Shan

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 90/119

Early stage of the project – formation and forming the piers for the viaduct

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 91/119

Overall layout of the precasting yard

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 92/119

Forming the box-girder units

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 93/119

Formwork to form the inner void of the box-girder units

Overview of the

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 94/119

Overview of thelaunching machine

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 95/119

Drawing provided by

China Harbour Engg.Co. (Group)

Launching sequence of the box-girder units using launching machine

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 96/119

Installation of the box-girders

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 97/119

Installation of the box-girders

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 98/119

Other example of applicationin civil engineering works

Precast parapet unit for the highwayand railway road/track way

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 99/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 100/119

Precast floating slab for the laying of railway track

Tunnel lining formedb

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 101/119

g by precast segments

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 102/119

Detail of the lining as

seen inside the tunnel tube

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 103/119

Forming the station platformusing precast curb and plank (KCR Tsim Sha Tsui Station)

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 104/119

Forming the cable hood

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 105/119

Delivery of the precast units

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 106/119

Forming the deck of the berth for the Container Terminal No. 9

Forming the deck of the Ting KauBridge using precast concrete plank

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 107/119

Precast concrete plank as cover to podium deck

Precast vertical panelforming an earth-reinforcedtype retaining structure

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 108/119

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 109/119

Forming storm water discharge culvert – Tseung Kwan O Reclamation

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 110/119

Delivery and storage along

the temporary seawall

Prepare for the foundation

to support the culvert

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 111/119

Precast units to form the 4mhigh 5-cell culvert system inTseung Kwan O

Positioning the Precast units

onto the culvert alignment

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 112/119

Precast culvert in the formof semi-submerged tube – Tsuen Wan WestReclamation as advancedwork for the West Rail

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 113/119

work for the West RailTsuen Wan Station

Sinking of the precastculvert section

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 114/119

Positioning of the culvertsection onto to formed bed

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 115/119

Connecting the culvertfrom the precast section

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 116/119

to the in-situ section

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 117/119

Precast box as footing to bridgetower – Tsing Ma Bridge tower on Ma Wan side

Precast box as pump house

for water cooling system inthe Central Reclamation

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 118/119

End of Presentation

andThank you

7/29/2019 Prefabricated 110303031212 Phpapp02

http://slidepdf.com/reader/full/prefabricated-110303031212-phpapp02 119/119

Thank you

If you require more information about the Author’s recent work on various

technology topics, you can enter his

homepage at

http://personal.cityu.edu.hk/~bswmwong /