Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble...
-
Upload
rudolf-cook -
Category
Documents
-
view
218 -
download
0
Transcript of Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble...
![Page 1: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/1.jpg)
Predictability of explosive cyclogenesis over the northwestern Pacific region
using ensemble reanalysisAkira Kuwano-Yoshida (Application Laboratory, JAMSTEC)
Takeshi Enomoto (University of Kyoto)2014. 8. 17
WWOSC 2014
Kuwano-Yoshida, A. and T. Enomoto 2013, Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis, Mon. Wea. Rev., 141, 3769 – 3785.
![Page 2: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/2.jpg)
Introduction• Explosive cyclones, “Bomb
cyclones”, can cause several disasters in winter.
• Bomb cyclones are sometimes difficult to forecast.
• The predictability of Bomb cyclones is unclear.
2013. 1. 14Photo by A. Yamazaki
![Page 3: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/3.jpg)
Bomb cyclones in the northwestern Pacific region
OJ: Dry PO: Moist
Yoshida and Asuma (2004, MWR)
![Page 4: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/4.jpg)
ALERA (AFES-LETKF Experimental Ensemble Reanalysis, Miyoshi et al. 2007, SOLA)
• AFES2 (T159 (80km) L48) + LETKF• 40 member ensemble• 2005.5.1 ~ 2007.1.10• U, V, T, TTD, Z, SLP(1.25deg, 17 layer)
– 6 hourly analysis ensemble mean and spread– daily 40 member analysis (6-hourly interpolation) – 6 hourly first guess ensemble mean and spread
• Available from DODS server– http://www.jamstec.go.jp/esc/research/oreda/products/aler
a.html– or google “ALERA JAMSTEC”
![Page 5: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/5.jpg)
Information from ensemble reanalysis• Analysis increment
• Skill of model forecast (model bias)
• Assimilated analysis – first guess (6-hour forecast)
• Guess spread:• Uncertainty of forecast (initial
condition error and its growth)• Standard deviation of first guess
40-member ensemble• Analysis spread:
• Uncertainty of analysis (initial condition)
• Standard deviation of assimilated 40-member ensemble
First Guess
Observation
Ensemble forecast
Increment
How do errors distribute and develop associated with phenomena?
![Page 6: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/6.jpg)
Objects
• Uncertainty and skill of 6-h forecast at explosive cyclogenesis in the northwestern Pacific region
• 3D structure of uncertainty in explosive cyclones
• The relationship between developing mechanisms and uncertainty
![Page 7: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/7.jpg)
Detection of explosive cyclones
• Tracking local minimum of SLP
• Making cyclone-relative composites for OJ and PO at the time of the maximum deepening rate.
MAXIMUM DEEPENING RATE (bergeron)
MAXIMUM DEEPENING RATE (bergeron)
(Nu
mb
er)
(Nu
mb
er)
1sin
60sin
6
p
![Page 8: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/8.jpg)
SLP increment
• OJ BOMB is forecast too far north compared to analysis.• PO BOMB is forecast shallower than analysis.
OJ PO
![Page 9: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/9.jpg)
Zwack-Okossi (1986)development equation
• The local tendency of geostrophic relative vorticity at 925 hPa is diagnosed.
t
l
t
l
tt
t t
l
t
p
p
p
p
p
p
d
p
p
pd
p
p
p
p
p
p
dadg
dpdpp
S
f
RPdpdp
p
cQ
f
RP
dpdpp
T
f
RPdpP
t
)()/(
)()(
22
2
.
V
V
VADV TADV
LATH ADIA
![Page 10: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/10.jpg)
OJ Z-O Eq. increment
• Negative increment by adiabatic heating corresponds to positive increment of SLP.
• Forecast errors associated with the upper trough is large.
VADV TADV
LATH ADIA
Z300
![Page 11: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/11.jpg)
PO Z-O Eq. increment
• Positive increment by latent heating is large at the cyclone center.
• Cloud and precipitation cause cyclogenesis forecast error.
Z300 VADV TADV
LATH ADIA
![Page 12: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/12.jpg)
Annual mean of surface pressure spread
Spread includes errors associated with observation density.Few (Many) observations → Large (Small) spread
![Page 13: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/13.jpg)
Spread normalization
• Normalization of spread by its annual local standard deviation in time extracts the uncertainty depending on flow.
Guess spread Normalized guess spread
![Page 14: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/14.jpg)
SLP normalized guess spread
• SLP spread is large southwest of cyclone in OJ BOMB, while west or northwest in PO BOMB.
OJ PO
![Page 15: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/15.jpg)
Uncertainty associated with adiabatic heating is the largest among the terms northwest and west of the center.
OJ Z-O Eq. spreadVADV TADV
LATH ADIA
SLP
![Page 16: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/16.jpg)
PO Z-O Eq. spread
• Uncertainty of latent heating is large around the center.
• In contrast to increment, adiabatic heating shows no significant signal.
VADV TADV
LATH ADIA
SLP
![Page 17: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/17.jpg)
SummaryOJ PO
Forecast bias Too far north Shallower
Upper trough Precipitation
Uncertainty Westside Center
Adiabatic heating Latent heating
The characteristics are consistent with the most important processes of explosive developments for OJ and PO cyclones, respectively.
![Page 18: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/18.jpg)
ALERA2ALERA ALERA2
Model AFES2, T159L48 AFES3, T119L48
Ensemble members 48 63+1
Observations JMA NCEP PREPBUFR
Periods1 May 2005 – 10 Jan 2007 1 Jan 2008 – 31 Aug 2010
1 Aug 2010 –
![Page 19: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/19.jpg)
Future work 1• Interpretation of OSE for
winter T-PARC cyclones
![Page 20: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/20.jpg)
Future work 2• Similar analysis for longer ensemble forecast using TIGGE
– Dependency on forecast system.9-day forecast
![Page 21: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/21.jpg)
7-day forecast
![Page 22: Predictability of explosive cyclogenesis over the northwestern Pacific region using ensemble reanalysis Akira Kuwano-Yoshida (Application Laboratory, JAMSTEC)](https://reader030.fdocuments.in/reader030/viewer/2022032709/56649ebc5503460f94bc5257/html5/thumbnails/22.jpg)
Comparison of extra-tropical cyclone tracks
Lizzie Froude, U. Reading
Ensemble mean error: Position(verified against ECMWF analyses)
Ensemble mean error – Propagation speed
Propagation speed bias
From Richard Swinbank presentation, GIFS-TIGGE WG Meeting