M cKenney’s upgraded the air handlers feeding the offices of a major broadcasting campus in Atlanta, Georgia. THE CHALLENGE The customer needed to double its HVAC capacity to accommodate a change in floor- plan from existing office space to a broadcast- ing studio. There was limited shut down time and the project required expert management of logistics and scheduling during demolition of existing air handling units (AHUs) and installation of replacement systems. THE SOLUTION McKenney’s collaborated extensively with its field personnel, the customer’s staff and the project engineer to preplan and schedule the many moving parts and people for the job. The team shut down each of the four existing AHUs in the mechanical room one at a time and removed each unit in pieces while the other AHUs remained connected. Then, a new custom-fabricated AHU was installed piece-by-piece and brought online. THE RESULTS Due to McKenney’s meticulous scheduling and planning—along with a staged AHU installation approach—the HVAC update was completed on time and under budget for the broadcasting and studio space. Precise Planning, Staged Installation PROJECT NAME Critical HVAC Upgrade PROJECT LOCATION Atlanta, Georgia PROJECT TEAM Owner: Broadcasting Company Engineer: HPD Engineers, LLC Subcontractor: McKenney’s, Inc. SPECIALIZATIONS Sheet Metal Shop Prefab MARKETS Commercial Offices The content of this document is not intended as an endorsement. www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

description

McKenney’s upgraded the air handlers feeding the offices of a major broadcasting campus in Atlanta, Georgia.

Transcript of Precise Planning, Staged Installation

Page 1: Precise Planning, Staged Installation

McKenney’s upgraded the air handlers feeding the offices of a major broadcasting

campus in Atlanta, Georgia.

THE CHALLENGEThe customer needed to double its HVAC capacity to accommodate a change in floor-plan from existing office space to a broadcast-ing studio. There was limited shut down time and the project required expert management

of logistics and scheduling during demolition of existing air handling units (AHUs) and installation of replacement systems.

THE SOLUTIONMcKenney’s collaborated extensively with its field personnel, the customer’s staff and the project engineer to preplan and schedule the many moving parts and people for the job. The team shut down each of the four existing AHUs in the mechanical room one at a time

and removed each unit in pieces while the other AHUs remained connected. Then, a new custom-fabricated AHU was installed piece-by-piece and brought online.

THE RESULTSDue to McKenney’s meticulous scheduling and planning—along with a staged AHU installation approach—the HVAC update was completed on time and under budget for the broadcasting and studio space.

Precise Planning, Staged InstallationPROJECT NAME

� Critical HVAC Upgrade

PROJECT LOCATION

� Atlanta, Georgia

PROJECT TEAM

� Owner: Broadcasting Company

� Engineer: HPD Engineers, LLC

� Subcontractor: McKenney’s, Inc.

SPECIALIZATIONS

Sheet Metal Shop Prefab

MARKETS

� Commercial Offices

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214