PRE-FEASIBILITY REPORT OF Masonry Stone Mining Project, (M.L. No. 95/2011(Block-C, Plot-176), ML Area 1.0 ha, Production Capacity-1,36,000 TPA) At Near Village: Chinawara, Tehsil: Pahari, District: Bharatpur (Rajasthan) PROJECT PROPONENT Miss Nisha Yadav D/o Shri Gyanendra Yadav R/o Village – Shroti Mohalla Kama, Tehsil- Kaman, Distt.- Bharatpur(Raj). Contact Person- Shri Rajender Kumar S/o Shri Munshi Ram Contact No- 09414025797

Transcript of PRE-FEASIBILITY REPORT -...

Page 1: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

PRE-FEASIBILITY REPORT

OF

Masonry Stone Mining Project,

(M.L. No. 95/2011(Block-C, Plot-176), ML Area 1.0 ha,

Production Capacity-1,36,000 TPA)

At

Near Village: Chinawara,

Tehsil: Pahari,

District: Bharatpur (Rajasthan)

PROJECT PROPONENT

Miss Nisha Yadav D/o Shri Gyanendra Yadav

R/o Village – Shroti Mohalla Kama,

Tehsil- Kaman, Distt.- Bharatpur(Raj).

Contact Person- Shri Rajender Kumar S/o Shri Munshi Ram

Contact No- 09414025797

Page 2: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

INDEX

S. NO. PARTICULARS PAGE NO.

1.0 EXECUTIVE SUMMARY 1

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2

3.0 PROJECT DESCRIPTION 3

4.0 SITE ANALYSIS 8

5.0 PLANNING BRIEF 10

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 11

8.0 PROJECT SCHEDULE & COST ESTIMATES 12

9.0 ANALYSIS OF PROPOSAL 12

10.0 ENVIRONMENTAL MANAGEMENT PLAN 13

10.1.1 Air Pollution Control 13

10.1.2 Water Management 13

10.1.3 Noise Pollution Control 13

10.1.4 Land Reclamation 13

10.1.5 Solid Waste Management 13

10.1.6 Green Belt Development 13

Page 3: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 16

PRE – FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY

The proposal for Masonry Stone Mining Project (Production Capacity-1,35,720 TPA), M.L. No.

95/2011(Block-C, Plot-176), ML Area 1.0 ha at Near Village: Chinawara, Tehsil: Pahari,

District: Bharatpur (Rajasthan).

This is an New Mining lease for which the letter of Intent has been issued by Superintendent

Mining Engineer Bharatpur Circle, Bharatpur. For reshuffle of lessee’s lottery for delineated

plots for block C was held on dated 28.03.2011. The lessee got plot number 176 of block C in

this lottery and Environmental clearance from central level MoEF & CC , New Delhi.

Table-1

Salient features of the Project

S. No. Particulars Details

A. Mining Lease Details

1. Name of the Project Masonry Stone Mining Project M.L. No.

95/2011(Block-C, Plot-176), ML Area 1.0 ha

2. Mineral Masonry Stone

3. Mining Lease Number M.L. No. 95/2011(Block-C, Plot-176),

4. Mining Lease Area 1.0 ha

5. Lease Holder Miss Nisha Yadav D/o Shri Gyanendra Yadav

6. Lease Validity 20 years

B Location

7. Village Chinawara

8. Tehsil Pahari

9. District Bharatpur

10. State Rajasthan

11. Latitude & Longitude Pillar Latitude Longitude

A 27°43'21.33"N 77°00'13.52"N

B 27°43'24.52"N 77°00'14.21"N

C 27°42'23.9"N 77°00'17.8"N

D 27°42'20.72"N 77°00'17.11"N

C. Other details

12. Cost of the project Rs. 20 Lakh

13. Cost for

Environmental

Protection Measures

Rs. 0.45 lakh

14 Entrepreneur social

responsibility

activities & budgetary

Rs 0.75 Lacs

Page 4: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 17

S. No. Particulars Details

allocation

15 Budgetary allocation

for facility provided

for the Labourers

Rs 0.50 Lacs

14. Seismic Zone II

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

(i) Identification of Project and Project Proponent

The project proponent is a private individual involve in mining with this

Masonry Stone Mining Project M.L. No. 95/2011(Block-C, Plot-176), ML Area

1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District: Bharatpur

(Rajasthan) .

(ii) Brief Description of the Nature of Project

This is an Existing Mining lease for which the letter of Intent has been issued by

Superintendent Mining Engineer Bharatpur Circle, Bharatpur. For reshuffle of

lessee’s lottery for delineated plots for block C was held on dated 28.03.2011. The

lessee got plot number 176 of block C in this lottery and Environmental clearance

from central level MoEF & CC , New Delhi.. As per EIA Notification dated 2006, as

amended time to time, this project is comes under A Category. (G.C. applicable)

(iii) Need for the Project & Its Importance to the Country/ Region

The mineral Masonry stone is used in various construction activities and will

be sold to nearby markets to fulfill the requirements of the local people.

(iv) Demand – Supply Gap

Considering the demand of mineral sufficient availability of the mineral in the

area, it is essential to have Masonry stone mine to sustain the supply of

mineral for construction purpose.

(v) Imports vs. Indigenous Production

It is a cheap mineral used in construction activities in rural areas therefore

export is not possible.

(vi) Export Possibility

There is no export possibility as these mineral is quite cheap and locally

available in abundance and used in rural areas.

(vii) Domestic/Export Markets

These minerals have only domestic market and will fulfill the requirement of

local. The stone may also be supplied to stone crusher proposed to be installed

outside the lease area.

Page 5: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 18

(viii) Employment Generation (Direct and Indirect) due to the Project

The total 60 skilled and unskilled manpower needed to run the mine.

3.0 PROJECT DESCRIPTION

(i) Type of Project Including Interlinked And Independent Projects, If Any

This is opencast semi-mechanized mining project. There is no interlinked or

interdependent project based on mineral produced. The mineral will be sold

directly.

(ii) Location (map showing general location, specific location, and project

boundary & project site layout) with coordinates

Page 6: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 19

Figure1: Location Map

Page 7: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 20

(iii) Details of Alternate Sites Considered

No alternative site has been taken into consideration due to availability of

mineral resources in the area.

(iv) Size and magnitude of operation

The Production of Masonry Stone-1,36,000 TPA from the mine located Near

Village: Chinawara, Tehsil: Pahari, District: Bharatpur (Rajasthan).

(v) Project Description with Process Detail

(1) Salient features along with project vicinity details of the Mining

project is given below:

Table - 2

Salient Features of the Project

S. No. Particulars Details

1. Name of the Project Masonry Stone Mining Project M.L. No. 95/2011(Block-

C, Plot-176), ML Area 1.0 ha

2. Mineral Masonry Stone

3. Mining Lease Number M.L. No. 95/2011(Block-C, Plot-176)

4. Mining Lease Area 1.0 ha

5. Lease Holder Miss Nisha Yadav D/o Shri Gyanendra Yadav

6. Lease Period 20 years

7. Method of mining Opencast Semi-Mechanized

8. Geological reserve 1288400 tonnes

9. Mineable Reserves 731050 Tonnes

10. Life of the Mine 5 Years

11. Bench Height & Width 6.0 m

12. Ultimate Pit Slope angle 45°

13. Elevation Range 330 mRL to 355 mRL

14. General Ground Level 180 mRL

15. Ground Water table 20-25 meter bgl

16. Ultimate working depth 25 Meters

17. Stripping Ratio 1:0.3

Page 8: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 21

(2) GEOLOGY OF THE AREA

Recent Soil

Post Delhi Pegmatite , Granitite, albetite

Delhi Super

Group

Ajabgarh Group Phyllite interbedded with quartizite , carbonaceous

phyllite, calcareous shale, conglomerates spongy

quartizite

Alwar Group Flaky quartizite, massive quartizite, Schist phyllite

Local Geology:

Recent Soil

Post Delhi

Delhi Super Group Ajabgarh Group Phyllite interbedded with

quartizite

(3) ESTIMATION OF RESERVES

Proved reserves : Nil

Probable reserves : 731050 tonnes

Mineable Reserves : 731050 tonnes

(4) MINEABLE RESERVES AND ANTICIPATED LIFE OF THE MINE

The Mineable reserves of Masonry Stone have been calculated by taking into account

the reserves in proved and probable category only. The mineable reserves are

731050 tonnes and life of mine is 5 Years.

(5) Method of Mining

The mining will be done by semi-mechanized opencast method. The height & width

of bench will be 6 meters at a time. For the systematic working of opencast mines,

benching will be done. The main work will be systematic benching. This benching

will also give the desired production of the mineral. Hydraulic excavator/loader and

tippers are proposed for removal and loading of mineral in tippers/trucks.

The haul/ approach roads will be provided up to the proposed working, site

services, site of dump and site of stock from the nearest tar road.

The mineral is proposed to transport by tractor trolley and tippers.

Table No-3

Extent Mechanization

Machinerries Number

Hydraulic Excavator/Loader with

rock breaker arrangement

1

Air Compressure tracktor mounted

or wheel mounted

1

Page 9: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 22

Jack hammer 2

Drillo roads As required

Water tank trolley mounted 1

Tippers 1

Hand tools As required

Source: Approved Mining Plan

(6) PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARS

The proposed Year-wise production plan for next five years is mentioned in the

table given below:

Table – 4

Year Wise Production for Next Five Years

Year Masonry Stone ROM

(tones)

I 68250

II 84560

III 99210

IV 111880

V 135720

Source: Approved Mining Plan

(7) LOADING & TRANSPORT

Tyre mounted Hydraulic machinaries will be deployed from time to time as

and when required. Trucks and tracor troley will be deployed for

transportation of masonry stone from working to consumer.

(8) WASTE GENERATION & DISPOSAL

Waste will be used as a second grade mineral and sold out by the lessee as well

as used for maintenance of roads and top will be used for plantation purpose.

Table – 5

Year Wise Production of waste for Next Five Years

Year Waste

(tones)

I 6820

II 8450

III 9930

IV 11040

V 13570

Source: Approved Mining Plan

Page 10: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 23

(9) CONCEPTUAL PLAN

Total waste generated will be 28117 cu.m which will be used as a second grade

mineral and sold out by the lessee as well as used for maintenance of roads.

At the five year of life of mine, total excavated area will be about 0.85 ha, which

will be converted in to water reservoir and 0.15 ha will be covered under

greenbelt.

(vi) Raw Material Required Along With Estimated Quantity, Likely Source,

Marketing Area of Final Products, Mode of Transport of Raw Material and

Finished Product

This is masonry stone Mining Lease. The mineral will be used for construction

purposes. No raw material will be required to dependent industries.

(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if

any, should be briefly Outlined

� No waste water will be generated from mining operation

� Domestic sewage water generated from office toilet will be disposed in soak

pits via septic tank.

(viii) Availability of Water Its Source, Energy /Power Requirement and Source

A. Water requirement:

Total water requirement for the project will be 5.0 KLD which will be sourced

from nearby villages.

B. Power requirement:

The electric power will not be use for the process of mining. Only HSD Fuel will

be required for operating machineries.

(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for

Their Management/Disposal:

Domestic sewage water generated from office toilet will be disposed in soak

pits via septic tank.

4.0 SITE ANALYSIS

(i) Connectivity

The lease area about 70.0 km from Bharatpur. Nearest Airport is Agra Air Port, Agra at a

distance of around ~110 km. in SE direction from Mining Lease area. Nearest Railway

station is available in Ramgarh Railway Station at a distance of ~25.0 km. in SW

direction from Mining Lease area and nearest city is Pahari at a distance of ~7.0 km in

East Direction. The lease area connected with approach roads.

(ii) Land Form, Land Use and Land Ownership

Existing Land Use Pattern

The mining lease area is 1.0 ha which is Government Land.

(iii) Topography

The Mining lease area comprises part of a mount trending north-south. The highest

contour is 355 mRL and lowest is 330 mRL.

Page 11: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 95/2011, ML Area 1.0 ha. at Near Village: Chinawara, Tehsil: Pahari, District:

Bharatpur (Rajasthan)

Pre-feasibility Report

Miss Nisha Yadav D/o Shri Gyanendra Yadav 24

(iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water

Bodies (Including Area Under CRZ)}, Shortest Distances From The Periphery Of

The Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco

Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In Case

Of Notified Industrial Area, A Copy Of The Gazette Notification

Table – 5

Environmental Settings

S. No. Particular Details

1. Nearest Village Village Chinawara at distance of ~2.0 km. in South

direction from the Mining lease area

2. Nearest city/ town Pahari at a distance of ~7.0 km in East Direction

3. National Highway/State Highway SH-22 is ~3.0 km in NE direction from the mine site.

SH-13 is ~6.0 km in NW direction from the mine site.

4. Nearest Railway Station Ramgarh Railway Station at a distance of ~25.0 km. in

SW direction from Mining Lease area

5. Nearest Airport Agra Air Port, Agra at a distance of around ~110 km. in

SE direction from Mining Lease area

6. Archaeological Important Place None, within 10 km radius area of mine site.

7. Ecological Sensitive Areas

(National Park, Wildlife

Sanctuary, Biosphere Reserve

etc.)

There is no National Park, Wild Life Sanctuaries,

Biosphere Reserves, Tiger Reserves, Wildlife Corridors,

etc. within 10 km radius

8. Reserved/Protected Forest

within 10 km radius

None, within 10 km radius area of mine site.

9. Nearest River / water body � Alampur Dam is ~ 4.0 km SE direction

� Kanmaida Dam is ~7.0 km NW direction

� Papra Dam is ~4.0 km in South direction

Source: Preliminary Site Visit

Page 12: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 96/2011(Block-B-Plot-109), ML Area 1.0 ha. at Near Village: Gangora, Tehsil: Pahari, District: Bharatpur (Rajasthan)

Form - 1 / Appendix – I

Miss Nisha Yadav D/o Shri Gyanendra Yadav 25

Figure 2: Key plan

Page 13: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 96/2011(Block-B-Plot-109), ML Area 1.0 ha. at Near Village: Gangora,

Tehsil: Pahari, District: Bharatpur (Rajasthan)

Form - 1 / Appendix – I

Miss Nisha Yadav D/o Shri Gyanendra Yadav 26

(v) Existing Infrastructure:

There is no building & structure within mining lease area except some

vegetations existing on the lease area which will be cleared when required.

Total lease area is Government Land.

5.0 PLANNING BRIEF

(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.)

Town and Country Planning/Development Authority Classification

This is a mining Project

(ii) Population Projection

Manpower required will be engaged from nearby areas. No significant influx of

people is anticipated in the area.

(iii) Land Use Planning

The mining lease area is 1.0 ha which is Government Land. At the five year of

life of mine, total excavated area will be about 0.85 ha, which will be converted

in to water reservoir and 0.15 ha will be covered under greenbelt.

(iv) Assessment of Infrastructure Demand (Physical & Social)

Lessee will assess the demand of infrastructure (Physical & Social) in nearby

area of the mine site and same will be developed under social work.

(v) Amenities/Facilities

Mining Management will develop the Amenities/Facilities in the nearby area of

the mine site as per requirement of local people of the nearby area under

corporate social responsibility programs.

6.0 PROPOSED INFRASTRUCTURE

(i) Residential Area (Non Processing Area)

This is not required as mine workers comes from nearby villages. Rest

shelter to the workers will be provided outside the lease area.

(ii) Green Belt

Green Belt/plantation will be developed equal to 33% of total Mining lease

area. The dead plants will be replaced by fresh plants. Native Plant species

will be planted.

(iii) Connectivity

The lease area about 70.0 km from Bharatpur. Nearest Airport is Agra Air

Port, Agra at a distance of around ~110 km. in SE direction from Mining

Page 14: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 96/2011(Block-B-Plot-109), ML Area 1.0 ha. at Near Village: Gangora,

Tehsil: Pahari, District: Bharatpur (Rajasthan)

Form - 1 / Appendix – I

Miss Nisha Yadav D/o Shri Gyanendra Yadav 27

Lease area. Nearest Railway station is available in Ramgarh Railway Station

at a distance of ~25.0 km. in SW direction from Mining Lease area and

nearest city is Pahari at a distance of ~7.0 km in East Direction. The lease

area connected with approach roads.

(iv) Water Management (Source & Supply of water)

Total water requirement for the project will be 5.0 KLD which will be used

for domestic as well as dust supression purpose and sourced from nearby

village .

(v) Sewerage System

Domestic sewage water generated from office toilet will be disposed in soak

pits via septic tank. Outside discharge is not envisaged.

(vi) Industrial Waste Management

No industrial waste water will be generated from this mine during mining

operation.

(vii) Solid Waste Management

Waste will be used as a second grade mineral and sold out by the lessee as

well as used for maintenance of roads and top soil will be used for plantation

purpose.

(viii) Power Requirement & Supply/Source

Electric power will not be required in mining operations.

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected

Persons Including Home Oustees, Land Oustees And Landless Laborers

(Brief Outline To Be Given)

Not Applicable as the lease area falls in Government waste land.

8.0 PROJECT SCHEDULE & COST ESTIMATES

(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time

Schedule For The Project To Be Given)

The mining activity will be started after obtaining Environmental clearance from

central level MoEF & CC , New Delhi. and acquiring the valid mining lease from

Mines and Geology Department of the State Government.

(ii) Estimated Project Cost Along With Analysis In Terms Of Economic

Viability of the Project

Cost of the project Rs. 20 Lakh

Page 15: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 96/2011(Block-B-Plot-109), ML Area 1.0 ha. at Near Village: Gangora,

Tehsil: Pahari, District: Bharatpur (Rajasthan)

Form - 1 / Appendix – I

Miss Nisha Yadav D/o Shri Gyanendra Yadav 28

Cost for Environmental Protection

Measures

Rs. 0.45 lakh

Entrepreneur social responsibility

activities & budgetary allocation Rs 0.75 Lacs

Budgetary allocation for facility

provided for the Labourers Rs 0.50 Lacs

9.0 ANALYSIS OF PROPOSAL

���� The Masonry Mining Lease will result in growth of the surrounding areas by

increasing direct and indirect employment opportunities in the region

including ancillary development and supporting infrastructure. Special

emphasis on Financial and Social benefits will be given to the local people

including tribal population, if any, in the area.

���� Development of social amenities will be in the form of medical facilities,

education to underprivileged and creation of self help groups.

���� No major adverse effect on environment is envisaged as the required

mitigation measures are inbuilt in the project.

10.0 ENVIRONMENTAL MANAGEMENT PLAN

10.1.1 AIR POLLUTION CONTROL

���� Wet drilling with sharp drill bits will be done for drilling to reduce generation

of dust.

���� Green Belt will be developed on periphery of the lease boundary and haul

roads,

���� Periodical water spraying on the haul roads will be done.

10.1.2 WATER MANAGEMENT

���� There is no surface water body in and around the mining lease area.

���� The rain water collected in mining pit will be diverted in the abandoned

existing and the area used in spraying.

���� Domestic waste water generated from office toilet will be disposed in soak pits

via septic tank.

10.1.3 NOISE POLLUTION CONTROL

���� Proper maintenance of all machines will be carried out which will reduce noise

generation during operations.

���� Workers exposed to high noise levels will be provided with ear defenders.

10.1.4 LAND RECLAMATION

Page 16: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o

Masonry Stone Mining Project M.L. No. 96/2011(Block-B-Plot-109), ML Area 1.0 ha. at Near Village: Gangora,

Tehsil: Pahari, District: Bharatpur (Rajasthan)

Form - 1 / Appendix – I

Miss Nisha Yadav D/o Shri Gyanendra Yadav 29

���� Total mining lease area is 1.0 hectares.

� At the five year of life of mine, total excavated area will be about 0.80 ha, which

will be converted in to water reservoir and 0.20 ha will be covered under

greenbelt.

10.1.5 SOLID WASTE MANAGEMENT

Waste will be used as a second grade mineral and sold out by the lessee as well as

used for maintenance of roads and top soil will be used for plantation purpose.

10.1.6 GREEN BELT DEVELOPMENT

���� Local species will be preferred for plantation

���� Tree guards will be provided for production

���� Green Belt/plantation will be developed equal to 33% of total Mining lease

area. The dead plants will be replaced by fresh plants. Native Plant species will

be planted.

Page 17: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o
Page 18: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o
Page 19: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o
Page 20: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o
Page 21: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o
Page 22: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o
Page 23: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o
Page 24: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_09_Mar_2015_1634548401... · Pre-feasibility Report Miss Nisha Yadav D/o