PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
17
PRE – FEASIBILITY REPORT
4.7415 Hectares Hillock Mining
(Mauza Churan, Tahsil Nahan, District Sirmour)
1. Project Location: The proposed project is located in village Churan, Tehsil Nahan, District Sirmaur
in Himachal Pradesh. The proposed mining of minor minerals like Sand, Silt, Boulders, Bajri and Clay
etc project stretches over an area of 4.7415 ha.
Figure 1.1 Project Site Location
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
18
2. Connectivity: The proposed project site is connected to important city Ambala by National
Highway – 73 and National Highway– 72 towards Southwest. It is connected to Chandigarh via
National Highway – 1 followed by National Highway– 73, towards Northwest.
To the main highway the project site is well connected by bituminous roads. The connectivity
map of project site and highway is shown in figure 1.2.
Figure 1.2: Connectivity of project site with Highways
Distances of mining site from Important Places:
Table 1.1: Important places with their respective distances
S.No Places Distance
1. Narayangarh (Haryana) by Road 8 km
2. Nahan (Sub – Division office & District Headquarter by road 25 Km
3. Shimla (State Captial) via Hamirpur by road 150 km
4. Ambala (Haryana) by Road 48 km
5. Chandigarh (Union territory) by road 70 km
6. Dehradun by road 135 km
7. Paonta Sahib 76 Km
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
19
3. Project Features:
The proposed project is mining of minor minerals like Sand, Silt, Boulders, Bajri and Clay from
lease area comprising of partly hillock. It stretches over an area of 4.7415 ha. It is near Village
Churan, Post office Palion in Tehsil Nahan, District Sirmaur, Himachal Pradesh.
The mining lease is granted for 5 years which can be further renewed for 15 years, from the date
of execution of lease deeds. The lease is granted to mine Sand, Silt, Boulders, Bajri and Clay.
The Stone and Bajri will be used in crushing unit for making angular grit. The sand, after sieved
is to be sold to construction industry.
The proposed project has geographical Coordinate for Site A:
Latitude: 30˚32’30.53” N
Longitude: 77˚8’56.84” E
Elevation: 360 m
4. Site Surrounding Features: (Adjacent)
North: There is forest area towards Northwest & Hillock. Gumti River adjacent towards
Northeast.
South: Gumti River and fallow land towards South & Southeast.
East: Gumti River 20 meters away.
West: Forest land and hillocks.
Figure1.3. Site surrounding features
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
20
Site Surrounding features within 15 km radius from project boundary:
Figure 1.4: Surrounding Feature within 15 km from project Boundary
Site Surrounding Feature:
1 Forest area:
a) Gumti Sambhalwa Reserve Forest – 3 km towards Northeast
b) Bhogpur Kotla Reserve Forest – 2.5 km towards East
c) Andheri Gurudwara Reserve Forest – 4.1 km towards Northeast
d) Trilokpur Reserve Forest – 6.5 km towards Northwest.
2 Water Courses
Gumti Nadi river bed is about 20 meter towards east. Other river in study area are Run
Nadi – 2.8 km towards east, Trilpkpur Nadi – 4.5 km towards east, Ujjal Nadi – 1.2 km
towards South and Begna Nadi – 3.4 km towards west.
3 Inter State boundary is about 0.65 km towards South.
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
21
4 Densely Populated are like Ujjan Majri – 0.62 km towards South, Churan – 0.25 km
towards East, Sambhalwa – 1.6 km towards Southwest, Khanpur Rajputan – 2.8 km
towards Southeast, Firozpur – 1.9 km towards Southeast, Mirzapur – 3.1 km towards east
and Bhandariwala – 5.2 km towards southeast.
5. Landuse of the area:
The landuse within 5 km radius of the mining lease are comprise of Agricultural land,
Agricultural fallow land, Dry river bed, Settlements, barren land etc. Area wise details of
the land use within 5 km of the project boundary is given in Table 1.2
Table 1.2: Land use within 5 km from project boundary
Class Area(sqkm)
Agricultural land 17.67
Agri. Fallow land 23.48
Dry river bed 4.90
Settlement 0.92
Vegetation 28.47
Barren land 3.49
Total 78.93
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
22
Figure 1.5: Land use within 5 km from project Boundary
6. Contour of the Study area The contour of the project site ranges between 355m to 362 meter above mean sea level
(msl)
The contour of the study area within 2 km from the project site ranges between 340 to 490 meters above msl.
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
23
Figure 1.6: Contour within 2 km from project boundary
7. Digital Elevation model (DEM)
Digital Elevation models show that the project lies in the range of 359 to 382 meter.
Figure 1.7: Digital Elevation Model within 5 km from project boundary
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
24
8. Mining Procedure:
The mining of mineral in the proposed project site will be carried out in semi –
mechanized way. The mining activity will be carried out during day time from 9:00 A.M
to 6:00 PM. About 8 -9 people will be engaged in mining and that to from the nearby
villages. No power and D.G set will be installed within the site or in close proximity. The
total water requirement for drinking, washing will be about 300 lit/day. The water will be
supplied in water tanks or water container by the project proponent.
Instruments like iron pan, shovel, hoe and pickaxe will be used for manual mining. For
the safety of the labors steel tip shoe, helmets, gloves, mask will be provided. Provision
of medical kits will be made at site for emergency situation.
9. Mining Depth:
The mining will be up to 3m depth as per the rules of State Mining Department for
mining in river bed. No mining will be carried out during monsoon season.
10. Description of Mineable Area:
The buffer zone of about 7.5 meter has been provided.
There is no place of public utility is situated nearby
In the leased out area rocks are friable boulder conglomerates
The boulders and bajri is compacted in a matrix of sand, silt and clay
The sand, silt and clay are mixed in the matrix and sand cannot be segregated at
commercially viable cost, therefore the entire matrix is considered as waste
In all, five benches are suggested at following level
364 metres level
361 metres level
358 metres level
355 metres level
351 metres level
Hence, first five years working is suggested up to 355 meters level by considering the factor that
mine can be further developed.
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
25
The rehabilitation is suggested only at places where no future mining will be possible and no
abandoned benches.
The bench wise production of the mineral, waste and top soil is given in the 1.8.
Figure 1.8: Showing year wise progressive mineable area.
11. Transportation and Route:
The mined material will be transported by Lorries to the local venders. While
transportation these lorry will be covered by plastic sheet to prevent it dispersion in air.
Care will also be taken to avoid peak traffic hours, school timing and office timing.
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
26
There exist bituminous road about 150 m away from project site. These roads via state
and national highway connect to the major part of district and adjacent states. Figure 1.2
given connectivity of the project site within district and adjoining state.
12. Land details:
As much as 4.7415 Hectares of mining lease has been granted for 5 years for mining of
minor minerals . The whole of the land belongs to private owners. Table 1.3 gives the
details of the leased out area. Kahsra Document is attached as Annexure– I
Table 1.3: The details of the leased out area
S.No Khasra
Number
Area (in
Bighas)
Status Owner of
Land
Kism Mauza
1 61/3 36-00 Kabja samve Private Ober Duom Banjar
Quadeem
Churan
2 172/62/3 1-00 Kabja samve Private Ober Duom
Banjar Quadeem
Churan
4 67/2 3-10 Kabja Samve Private Ober Doum
Banjar Quadeem
Churan
4 68 /2 2-05 Babja Samve Private Ober Doum Banjar
Quadeem
Churan
5 174/63/2 5-14 Kabja Samve Private Ober Doum Banjar
Quadee
Total 48-09 Bighas (4.7415 ha)
13. Reserve: For the calculation of reserve three geographical sections at the interval of
30 meter figure 6 were plotted along N-S grid and E–W grid and slice at intervals of 2
metres were also drawn to get the 3 D view of the deposit.
Total Geological Reserve
The total reserve is divided into two categories
Reserve up to 5 meter is categorized as proved
5 to 10 meter as probable
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
27
Total geological reserve is calculated just on the basis of section lines surface area but
mine ability and other factor i.e are not considered in calculation of geological reserve.
o All the top soil is waste
Total Mineable reserve
For mineable reserve following are important consideration
The buffer zone of 7 meters is left as safe zone
The reserve upto 354 meter by making five benches of 3 x 2 meters from the 364 meters
level. Hence reserve is calculated by considering all possible options. The total
cumulative mineable reserves after considering matrix waste of 40% are shown in the
figure 8.
Figure 1.9: The bench wise reserve & cumulative Reserves; Waste and Cumulative Waste
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
28
14. Development and Production Programs for the First Five Years.
Production of the 1st Year
25900 metric tons of Boulder/stone and 18500 metric tons of bajri/cobbles and pebbles
would be extracted for feeding the crusher.
29800 metric tons of waste of mixed sand, silt and clay would be generated.
Figure 2.0: Material Handling and Production of Minerals (metric tons) during First year
Production of the 2nd Year
26600 metric tons of stones and 19000 metric tons of bajri / pebbles and cobbles will be
produced.
30400 Metric Tons of waste will be generated
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
29
Figure 2.1: Projected total material Handling and Production of Minerals, in metric tons
during second year
Production of the 3nd Year
27300 Metric tons of stones and 19500 metric tons of Bajri/ pebbles and cobbles will be
produced, which will be utilized in the crusher.
31200 Metric tons of waste will be generated.
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
30
Figure 2.2: Projected total material Handling and Production of Minerals, in metric tons
during Third year
Production of the 4th Year
28000 metric tons of stones and 20000 metric tons of bajri / pebbles and cobbles wii be
produced.
32000 Metric tons of waste will be generated.
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
31
Figure 2.3: Projected total material Handling and Production of Minerals, in metric tons
during fourth year.
Production of the 5th Year
28700 metric tons of stones and 20500 metric tons of Bajri / pebbles and cobble will be
produced.
32800 Metric tons of waste will be generated.
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
32
Figure 2.4: Projected total material Handling and Production of Minerals, in metric tons
during fifth year.
Total Material Handling and Production of Minerals, in metric tons during Planned Five
Year
The total mineral mined in planned five year is 390000 metric tons
Total of 136500 metric tons of stones.
97500 metric tons of Bajri / cobbles.
156000 Metric tons of waste.
PRE – FEASIBILITY REPORT, 4.7415 Hectares Hillock Mining,
(Mauza Churan, Tahsil Nahan, District Sirmour)
33