PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE –3 (Area: 183.11 Ha) Neredcherla Mandal, Nalgonda district. Telangana. For INCREASE OF LIMESTONE PRODUCTION FROM 0.3 TO 2.3 MTPA Of DECCAN CEMENTS LTD Mahankaligudem, Neredcherla Mandal, Nalgonda District, Telangana.

Transcript of PRE FEASIBILITY REPORT Of...

Page 1: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

PRE FEASIBILITY REPORT

Of

BHAVANIPURAMLIMESTONE MINE – 3

(Area: 183.11 Ha)Neredcherla Mandal,

Nalgonda district. Telangana.

For

INCREASE OF LIMESTONE PRODUCTIONFROM 0.3 TO 2.3 MTPA

Of

DECCAN CEMENTS LTDMahankaligudem, Neredcherla Mandal,

Nalgonda District, Telangana.

Page 2: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

Table of Contents

1. Executive summary2. Introduction of the project/ Background information3 Project Description.4 Site Analysis5. Planning Brief.6 Proposed Infrastructure7. Rehabilitation and Resettlement (R & R) Plan.8. Project Schedule & Cost Estimates9. Analysis of Proposal (Final Recommendations).

Page 3: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

CHAPTER – 1 EXECUTIVE SUMMARY

1.0 Executive Summary

DECCAN CEMENT LIMITED., DCL is one of the cement producingbusiness houses having installed production capacity of about 1.5MTPA Cement Production in the state of Telangana.

The limestone requirement of the cement plant is met fromBhavanipuram Limestone Mine – 2 (ML-2) at rated production of 2.0MTPA and from Bhavanipuram Limestone Mine – 3 (ML-3) at ratedproduction of 0.3 MTPA. Both the mining leases are adjacent to eachother.

DCL now proposes to enhance Limestone production ofBhavanipuram Limestone Mine – 3 from 0.3 to 2.3 MTPA to meet thelimestone requirement of Cement Plant due to exhaust of reserves atBhavanipuram Limestone Mine – 2

BHAVANIPURAM limestone mine – 3 is spread over an area of 183.11Ha. with about proved mineral reserves of 80.62 Million Tonneswhich will last for 35 years with proposed production capacity of 2.3MTPA.

Fully Mechanized method of mining is adopted. The benches are 6 mheight. The limestone produced from the mine transported from themines to the crusher inside the plant by dumpers of 19 t capacity.

183.11 Ha is part of Saidulnama Reserved Forest (Compartment No.26 & 27). Forest Clearance was obtained vide letter No.Rc.No.31015/2007/F2, dated 13.08.2013.

No top soil or waste is envisaged from the mine. The soil as andwhen generated from the mining will be used for greenbeltdevelopment. Hence stocking of top soil/waste in the form of dumpsis not envisaged.

Water requirement for the mine at 2.3 MTPA limestone production isabout 120 m3/day for dust suppression, plantation and domesticpurposes. This requirement is sourced from River Krishna.

The capital Investment Cost is estimated as Rs 2.0crores.

Page 4: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

CHAPTER – 2 INTRODUCTION OF THE PROJECT/ BACKGROUNDINFORMATION

i. Identification of project and project proponent. In case of miningproject, a copy of mining lease / letter of intent should be given.

PROJECT: DECCAN CEMENT LIMITED proposes to Increaselimestone production from 0.30 to 2.3 MTPA from BhavanipuramLimestone Mine – 3 mine located at jurisdiction of SaidulnamaReserved Forest (Compartment No. 26 & 27), MahankaligudemVillage, Nereducherla mandal, of Nalgonda District Telangana.

DCL has earlier obtained EC (vide Letter No: J-11015/642/2007-IA.II(M) Dated October 18 2007) for 0.3 MTPA of Limestone production.

Mine was opened on 23rd March 2015.

The present proposal is for obtaining Environmental Clearance forIncrease of limestone production from 0.3 to 2.3 MTPA from Ministryof Environment & Forests & Climate Change (MoEF&CC) under 1(a)category of EIA notification SO1533 dated 14th Sep. 2006 andsubsequent amendments dated 01.12.2009 & 04.04.2011.

A copy of the mining lease letter is enclosed as Annexure – 1

PROJECT PROPONENT:

DECCAN CEMENT LIMITED., DCL is one of the cement producingbusiness houses having installed production capacity of about 1.5MTPA Cement Production in the state of Telangana.

DCL was promoted by Sri M.B.Raju and associates in 1979 to set upa mini cement plant with an installed capacity of 66000 tonnes perannum in Nalgonda District of Telangana. The company commencedit’s commercial production in the year 1982.

DCL was the first mini cement plant in the country to adopt the dryprocess Rotary Kiln Pre-calcinatory technology for the manufacture ofOrdinary Portland Cement (OPC) in technical collaboration withOnoda Engineering of Japan.

DCL also diversified into manufacturing ‘special grade cements’ likeSulphate Resistant Cement, Low Heat Cement, Low Alkali Cement,Pozzolona Portland cement and other customized cements for use invarious projects such as Thermal Power Plants, Bridges, Fertilizer

Page 5: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

Plants, Hydro Power Plants, etc. DCL is presently manufacturing 0.3MTPA of these cements.

DCL has also been manufacturing and marketing Slag cement, withvarious compositions of clinker and slag, as per marketrequirements, for which purpose it has setup a separate unit forproduction of slag cement up to 0.3 MTPA

As a part of its corporate diversification plans, DCL ventured intopower generation. DCL has put up a Hydro Power project of 3.75 MWinstalled capacity on the Guntur Branch Canal near Narsaraopet,Guntur District and Wind Farm Power project of 2.025 MW capacitiesat Ramagiri, Ananthapur District, both in Andhra Pradesh. Theseprojects were the first of its kind in the state of Andhra Pradesh andalso the first to enter into Wheeling Agreements with the erthswhileAPSEB for captive utilization of energy at its cement plant. Thesepower plants have been successfully operating and have generatedover 23 million units per annum during the last ten years.

DCL has also installed and successfully commissioned a 1.650 MWWind Mill Project at Surandai, in Tirunelveli District of Tamilnadu, inSeptember, 2006, at a total project cost of Rs. 10.40 crores. This unitis now operational and will generate about 5 million units perannum.

DCL has setup a new cement plant of 1.50 MTPA at Mahankaligudemvillage, Neredcherla Mandal of Nalgonda district in Telanganaadjacent to the existing cement plant.

ii. Brief description of nature of the project

The limestone mine is spread over 183.11 Ha with about provedmineral reserve of 80.62 Million Tonnes to produce 2.3 MTPA ofLimestone from Mahankaligudem Village, Nereducherla mandal,Huzur Nagar Taluk of Nalgonda District Telangana.

The mining of the deposit is worked by deep hole drilling & blastingwith fully mechanized open cast mining method.

The benches are 6 m height. The limestone produced from the mineis transported from the mines to the crusher inside the plant bydumpers of 19 t capacity.

No top soil or waste is envisaged from the mine. The soil as andwhen generated from the mining will be used for greenbelt

Page 6: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

development. Hence stocking of top soil/waste in the form of dumpsis not envisaged.

iii. Need for the project and its importance to the country and orregion.

Cement industry is one of the main beneficiaries of the infrastructureboom. While on the one hand several big and small cementcompanies are actively considering expansion plans in anticipation offurther growth in demand for cement, on the other, a phase ofacquisitions and mergers among the existing players is also going on.

In India, the south consumes maximum of 30% followed by East at17%, North at 19%, central at 16%, and West 18%. Also, there is anincrease in the consumption of PPC cement from 48% to 50%.

Weaker sections’ housing, construction of public toilets, schools inrural area apart from several private and public infrastructureprojects will also give tremendous boost to the cement consumptionin the state

As per the industry sources, demand has mainly come from theconstruction sector with the three main cities in the South -Bangalore, Chennai and Hyderabad - witnessing hectic constructionactivity, be it for the information technology sector, shopping malls orintegrated townships.The construction of AP new capital coming up in the vicinity raisedthe demand for more cement in the region. The growth in demandhas prompted many cement industries to consider expanding theircapacities, both in present locations and in Greenfield locations.

To meet the limestone requirement of the plant, DCL proposes forincrease of limestone production from 0.3 to 2.3 MTPA from thismine.

Since Limestone is the main raw material for cement production, thedemand is always there with that of cement. Moreover, the subjectmine produces good grade limestone leading to conservation ofmineral resources.

Demand– supply Gap

Since Limestone is the main raw material for cement production, thedemand is always there with that of cement. Moreover, the subjectmine produces good grade limestone leading to conservation ofmineral resources.

Page 7: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

The cement market has growth due to the central governmentliberalization policies and new schemes for housing, road projects.

iv. Imports Vs Indigenous production.

The limestone produced from the Deccan Cements Limited is meantfor the captive consumption in the cement plant.

v. Export possibility.

No exports of limestone are proposed.

vi. Domestic / export markets

The limestone produced from the Deccan Cements Limited is meantfor the captive consumption in the cement plant.

vii. Employment generation (direct and indirect) due to the project.

Mechanized method of mining is adopted.

Manpower Requirement 39

Page 8: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

CHAPTER – 3 PROJECT DESCRIPTION

i. Type of project including interlinked and interdependentprojects, if any.

The project is for Increase of 0.30 MTPA to 2.3 MTPA fromBhavanipuram Limestone Mine – 3 spread over an area of 183.11Ha. With about proved mineral reserve of 80.62 Million will last for 33years. The limestone produced from the mine is of good gradelimestone and is directly utilized for the cement production

It is categorized as Category ‘A’ Project under Schedule 1(a) as themining lease area is more than 50 Ha hence it necessitates obtainingEnvironment Clearance from Ministry of Environment & Forest(MoEF).

ii. Location (map showing general location, specific location, andproject boundary & project site layout) with coordinates.

The mining lease area comprising 183.11 Ha is situated atNeredcherla Mandal, Huzur Nagar Taluk, Nalgonda district.Telangana.

The mine area is a part of the Survey of India Toposheet No 56P/10.The mine area falls between 16°42'27.00" N - 16°43'17.00" N Latitudeand 79°42'37.00" E - 79°44'13.00" E Longitude, with an averagealtitude of 74 m above MSL.

The location map of the mine site is shown in Fig – 1.

Page 9: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

LOCATION MAPFIG - 1

INDIA

Warangal

TELANGANA

Nalgonda

Khammam

Adilabad

KarimnagarNizambad

Medak

Rangareddi

Mahabubnagar

NALGONDA

Atmakur

Niradcherla

MathampalliDamaracherla

Chiwemla

Tungaturti

Bibinagar

Gundlapalli

NALGONDAMunugod

Kongal

Peddavur

Gurrampod

Nagarjuna Sagar

AdsarlapalliDevarakonda

Chandampet

MarrigudemNampalli

Chintapalli

Chandur

Adavi devulapalli

Vijayapuri north

Vemalpalli

Tipparti

NidamanurTripurawaram

Anmola

Mirialguda

Penpahad

Gundal

Ramannapeta

Narkatpalli

Chautuppal

Narayanpur

Pochampalli

Chityal

Valigond

AlerTurkapally

Bhongir

YadagiriguttaRamawaram

Atmakur

Nakrekal

Shali gourawaram

Katangur

Jajireddigudem

Motkur

Musi

Ketthepalli

Musi Reservoir

Suryapet

Nutankal

Tirmalgiri

Kodad

ChilkuruHuzurnagar

Gardepalli

Mellacheruvu

Munagala

Moteh

Nadigudem

ML-3 MINING LEASE AREA

LEGEND

RAILWAY TRACK

RIVER

ROAD

DISTRICT BOUNDARY

STATE HIGHWAY

TALUK HEADQUARTER

DISTRICT HEADQUARTER

TOWN

STREAMS

ML-3 MINING LEASE AREA

NATIONAL HIGHWAYNH 9

NH 9

NH 9

Note : Not to scale

NH 9

Page 10: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

Nearest railway line connecting Motamarri – Vishnupuram of SouthCentral Railway line, at a distance of 0.7 km to NW direction from theMining Lease Area. Key map showing the location of various featuresaround the Mining Lease Area is shown in Fig – 2.

Nalgonda is major town at a distance of 60.3 km in NW direction.

The National Highway (NH-9) connecting Hyderabad - Vijayawada atabout 36.8 km in NE direction and State High way No.2, Narketpallyto Mederametla is at a distance of 15km.

The nearest railway station is Vishnupuram RS at 0.7 km in NWdirection.

Nearest Settlements from the Mine site

Ravipahad – 0.6 km – SE

Nearest Reserved Forests from the Mining Lease Area

Pasupulabodu RF – 0.8 km – WNW Ravipahad RF – Adjacent Mangalabodu RF – 2.7km – NNW Saidulnam RF – Adjacent

Inter state boundary Telangana and Andhra Pradesh is at a distanceof 1.5 km – E

Salient features of Mine site are given in Table – 1 and Fig - 3 showsthe study area of 10 km radius around the Mine site.

Page 11: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:
Page 12: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:
Page 13: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

TABLE - 1SALIENT FEATURES OF THE MINE SITE

Feature DetailsAltitude 74 m above MSLLongitude Between 79°42'37.00" E - 79°44'13.00" E,Latitude Between 16°42'27.00" N - 16°43'17.00" N

Village, Mandal, District, StateBhavanipuram, Janpahad (PO),Nereducherla Mandal, Nalgonda Dist,Telangana State.

Max. Temp. 47.2oCMin. Temp. 9.4oCRelative Humidity 35-83 %Annual rainfall 1031.6 mmLand availability 183 haTopography PlainSoil Type Black Cotton

Nearest River

Musi River – 3.4 km – WVemuleri River – 5.9 km – ENEKrishna River – 0.9 km – SEBay of Bengal Sea – 127.7 km - SE

Nearest Highway

National Highway (NH-9) connectingHyderabad - Vijayawada at about 65 kmin NEState High way No.2, Narketpally toMederametla is at a distance of 15km

Nearest Railway station Vishnupuram RS - 7.3 km - WNearest Industries None within 10 km radiusNearest Village Ravipahad – 0.6 km – SENearest City Nalgonda - 60.3 km - NW.

Nearest Air port Hyderabad ( Shamshabad ) – 147.3 km -WNW

Nearest Forest

Pasupulabodu RF – 0.8 km – WNWRavipahad RF – AdjacentMadinapadu – RF – 1.5 km – SESaidulnam RF - Adjacent

Historical places None within 10 km radius*All distances mentioned in the above table are aerial distances

iii. Details of alternate sites considered and the basis of selectingthe proposed site, particularly the environmental considerationsgone into should be highlighted.

No alternate sites were considered as the project is site specific.

Page 14: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

iv. Size or magnitude of operation.

Mine area is 183.11 Ha. It is proposed to increase limestoneproduction from 0.3 to 2.3 MTPA.

v. Project description with process details (a schematic diagram/flow chart showing the project layout, components of the projectetc. should be given)

The mining is by opencast mechanized mining, employing DTHdrilling for blast holes, after blasting the mineral is loaded into thetippers using hydraulic excavator. The limestone is hauled to thefactory.

i) Drilling

Drilling is accomplished by Wagon drill machine capable of drillingblast hole of 115 mm dia.

Primary Drilling

Bench Height

As per the deposit characteristics the bench height is kept at 6.0 m.

Burden

55% to 60% of the bench height i.e. 3.5 m depending on the height ofthe bench and also depends upon the thickness of individual lithounit.

Spacing

A spacing of 5.0 m is maintained based on nature and stratigraphicsequence of the rock.

Angular Holes

The blast hole is vertical only.

Depth of Holes

The depth of the hole is kept at 6.7 m equal to bench height with subgrade drilling.

Page 15: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

Secondary drilling

No secondary drilling will be carried out. The boulders are broken bydeploying Rock – Breaker or by using secondary blasting if required.

ii) Blasting

Blasting is one of the most important operations in the productioncycle of a mine. Open cast mining adopting deep hole blastingtechnique & deploying HEMM.

Type of explosives used / to be used

The explosives will be stored in the licensed explosive magazine. Theexplosive will be brought to the site in the explosive van.

Explosive magazine (Type - A) License No. E / HQ / TG / 22 / 418 (E34636)Dt: 27.06.2002 valid up to 31.03.2019. The capacity of the magazineis 1ton.

iii) Loading

Loading of limestone will be carried out with the help of twoexcavators with bucket capacity of 2.1cu.m capacity.

iv) Hauling

Tippers of 19 tonne capacity will be used for transport of limestonefrom pit to crusher.

v) Raw material required along with estimated quantity, likelysource, marketing area of final product/s, mode of transport ofraw material and finished product.

No raw material is required.

vi) Resource optimization / recycling and reuse envisaged in theproject, if any, should be briefly outlined.

The area is devoid of top soil.

vii) Availability of water its source, energy /powerrequirement

Page 16: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

Water requirement for enhanced production is 120 m3/day for dustsuppression, plantation and domestic purposes. Water requirementof the mine is met from River Krishna.

The power required for illumination will be met from grid.

viii) Quantity of wastes to be generated (liquid and solid) andscheme for their management / disposal.

No top soil or waste is envisaged from the mine. The soil as andwhen generated from the mining will be used for greenbeltdevelopment. Hence stocking of top soil/waste in the form of dumpsis not envisaged.

Waste water generated from domestic uses will be treated in septictank followed by soak pit.

ix) Schematic representations of the feasibility drawing which giveinformation of EIA purpose.

Page 17: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

CHAPTER – 4 SITE ANALYSIS

i. Connectivity.

The mine area under reference extends over an area of 183.11 Ha inMahankaligudem Village, Nereducherla Mandal, of Nalgonda DistrictTelangana.

Nearest railway junction Nadikudi at a distance of 13.2 km . Key mapshowing the location of various features around the Mining LeaseArea is shown in Fig – 2. Hyderabad is major city at 178 km.

State highway-SH-02 connecting Narketpally to Mederametla is at adistance of 15km.

Infrastructural facilities like Post, Telephone, Police Station andPrimary Health Center etc., are available in the nearby villages. Thenearest airport is Hyderabad at 147.3 km.

ii. Land form, land use and land ownership.

Land use:

Total area of 183.11Ha is part of Saidulnama Reserve Forest.

The Mining will be continued up to 33 years @ 2.3 million tonnes oflimestone per year. The land use pattern is furnished in the followingtable.

LANDUSE PATTERN OF THE MINE AREA (Ha.)Land Use Area in Ha.

Mine pit 151.177.5m wide barrier all along UPL/leaseboundary

5.35

Infrastructure (work shop,Mine office, crusher,roads etc.) with surroundings

3.37

Remaining area including (Blocked underPublic Road & Electrical line)

23.22

Total 183.11

Topography (along with map)

The topography is Plain terrain.The surface elevation range from 80 m above MSL.

Page 18: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

Fig – 4 shows the survey map/surface layout of the mining leasearea.

ROAD

GATE

CANTE

EN B

UILD

ING

SECU

RITY

ROOM

DRA

INAG

E

TIM

E O

FFIC

E &

EXCIS

E O

FFIC

E

WEI

GH

BRI

DG

E

MAIN GATE

Pow

er L

ine

H.T

. PO

WER

LIN

E

RO

AD

ROAD

Wat

ch T

ower

53

54

MAG

ZIN

E BU

ILD

ING

R F

AREA

R F

AREA

PATT

A L

AND

S

SC

ALE

: 1c

m =

20

mD

AT

E O

F S

UR

VE

Y: 2

7.10

.201

4

DRAINAGE

(RF

81)

TO R

AVIP

AHAD

ROAD

COMPOUND WALL

90.7

4M

88.7

4M

B.M

. 76

.29m

SEAS

ONAL W

ATER

COUR

SE-2

SEAS

ON

AL W

ATER

CO

URS

E-4

SEAS

ONAL

WAT

ER C

OURS

E-1

SEAS

ON

AL W

ATER

CO

URS

E-3

50m

SAF

ETY

BARR

IER

ZONE

50m

SAF

ETY

BARR

IER

ZON

E

TO J

ANPA

HAD

I N

D E

X

M.L

. BO

UN

DAR

Y

CO

NTO

UR

, VA

LUE

IN m

RO

AD

SEA

SO

NAL

STR

EAM

65

BEN

CH

MAR

K

POW

ER L

INE

7.5

m B

UFF

ER Z

ON

E

SAF

ETY

ZO

NE

(RO

AD,

POW

ER L

INE)

PRO

POSED

HAU

LAG

E RO

AD

BH

-30

BH

-29

BH

-40

BH

-41

BH

-54

BH

-21

BH

-39

BH

-28

BH

-53

BH

-25

BH

-24

BH

-36

BH

-35

BH

-34

BH

-33

BH

-50

BH

-49

BH

-48

BH

-47

BH

-55

BH

-61

BH

-60

SU

RFA

CE

PLA

N

BH

AV

AN

IPU

RA

M, J

AN

PA

HA

D (

PO

), N

ER

ED

UC

HE

RLA

(M

), N

ALG

ON

DA

(D

T.)

, T.S

.

BH

AV

AN

IPU

RA

M L

IME

ST

ON

E M

INE

(M

L-3)

M/s

DE

CC

AN

CE

ME

NT

S L

TD

.

RQ

P/H

YD/2

43/2

005/

B

PREP

ARED

BY:

B.S

.EN

VI-

TE

CH

(P

) LT

D.,

FIG

- 4

EX

TE

NT

-

183

.11

HE

CT

AR

ES

(45

2.42

96 A

CR

ES

)

DR

G N

O: D

CL/

ML-

3/03

SC

ALE

:- 1

: 20

00

MO

DIF

ICA

TIO

N I

N T

HE

AP

PR

OV

ED

MIN

ING

PLA

N

64

67

6970

71

7273

74

75

75

75

76

76

7778

80

81

84

84

83

84

82

80

80

79

79

79

77

77

77

78

76

75

75

74

74

74

74

73

73

73

73

72

71

71

72

72

71

71

70

69

70

71

71

71

72

72

71

70

69

6867

67

68

6970

7071

70

69

68

67

68

68

67

66

66

67

6768

68

67

66

66

65

65

6565

6464

64

65

66

63

6984

63 62

61 60

61

60

62

63

64

E 36

2100

E 36

2300

E 36

2500

E 36

2700

E 36

2900

E 36

3100

E 36

3300

E 36

3500

E 36

3700

E 36

3900

E 36

4100

E 36

4300

E 36

4500

E 36

4700

E 36

4800

N 1

8479

00

N 1

8481

00

N 1

8483

00

N 1

8485

00

N 1

8487

00

N 1

8489

00

N 1

8491

00

N 1

8493

00

N 1

8495

00E

3621

00E

3623

00E

3625

00E

3627

00E

3629

00E

3631

00E

3633

00E

3635

00E

3637

00E

3639

00E

3641

00E

3643

00E

3645

00E

3647

00E

3648

00

PLAN

T AREA

E-01

E-03

E-05

E-04

E-07

E-06

E-08

E-10

E-09

1A

2A

3A

4A

5A

6A7A23

A20

A

17A

24A

22A

9A

21A

8A

16A

11A

15A

10A

14A

13A

18A

25A

19A

12A

GRAB S

AM

PLE

LOCAT

ION

STR

EAM

CU

TTIN

G S

AM

PLE

LOC

ATIO

NE-

03

19A

ULT

IMAT

E PI

T LI

MIT

50m

SAF

ETY

ZON

E

50m

SAF

ETY

ZON

E

50m

SAF

ETY

ZONE

50m

SAF

ETY

ZONE

Page 19: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

iii. Existing land use pattern (agriculture, non-agriculture, forest,water bodies (including area under CRZ), shortest distances fromthe periphery of the project to periphery of the forests, nationalpark, wild life sanctuary, eco sensitive areas, water bodies(distance from the HFL of the river), CRZ, in case of notifiedindustrial area, a copy of the Gazette notification should begiven.

Total area of 183.11 Ha is part of Saidulnama Reserve Forest.

No sensitive areas or National parks are located within 10 km of themine area.

The following are the Nearest Reserved Forests from the MiningLease Area

Pasupulabodu RF – 0.8 km – WNW Ravipahad RF – Adjacent Saidulnam RF – Adjacent

iv. Existing infrastructure.

None

v. Soil classification

Area is devoid of any top soil.

vi. Climatic data from secondary sources

In general, the study area experiences subtropical climate with coldwinter nights with a minimum temperature of 9.2oC and hot summerdays with a peak temperature of 47.2oC. Monsoon starts in themonth of July with peak precipitation in the months of August andSeptember. The annual rainfall is 627 mm.

vii. Social infrastructure available.

DCL has provided employment to local population and it will givepreference to the local people whenever there is requirement of manpower. The company also encourages and provides the required spacefor setting up small shops to local population.

DCL maintains roads to the project site from nearest state roads.

Page 20: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

DCL has established a public relation office to maintain a good line ofcommunication between the management and the public on mattersof environmental concern. All public grievances are redressed.

The impacts of mining on the economic aspects are clearly observed.The existing mining activities provided employment to persons ofdifferent skills and trades. The local population is the largestplausibility among these employees. The employment potentialameliorated economic conditions of these families directly andprovided employment to many other families indirectly who areinvolved in business and service oriented activities. This in-turn willimprove the socio-economic conditions of the area.

DCL has spent an amount of Rs. 2.0 crores for providing varioussocial infrastructure/measures towards Health Care, Education,Drinking Water / Sanitation / Infrastructure Religious Sports /Cultural / Social / Plantation Water Supply for Agriculture Fieldsand Flood Relief Activities for the past 11 years.

Page 21: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

CHAPTER – 5 PLANINIG BRIEF

i. Planning concept (type of industries, facilities, transportationetc.) town and country planning / development authorityclassification.

The subjected mine is the captive limestone mine of DeccanCements Limited at Mahankaligudem Village, Nereducherla mandal,of Nalgonda District Telangana with mine extent of 183.11 Ha. Theproposal is for increase of limestone production from 0.3 to 2.3MTPA.

ii. Population projection

Man power is 39. No increase in manpower is proposed.

iii. Land use planning (breakup along with greenbelt etc.,)

At the end of mining operations, about 151.17 Ha of mined-out areawill be developed into water reservoir and 5.35 Ha along the minelease boundary (7.5m barrier zone) will be afforested under GreenBelt development. 3.37 Ha will be developed under work shop, Mineoffice, crusher, road etc., 23.22 Ha area remaining including (Blockedunder Public Road & Electrical line).

iv. Assessment of infrastructure demand (physical & social )

After this Increase, the mine will provide employment to about 39people in the form of contractual jobs, business opportunities, servicefacilities etc. This will enhance the economic status of the area.

Apart from the jobs, the company will provide medical andeducational facilities to the employees which can also be availed bythe people in nearby villages.

v. Amenities / Facilities.

Infrastructural facilities like Post Office, Telephone and PrimaryHealth Centre etc., will be provided at cement plant of The DeccanCements Limited. The mine office with first aid rooms, rest shelters,toilets, tool/store room, etc., are proposed in cement plant.

Page 22: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

CHAPTER – 6 PROPOSED INFRASTRUCTURES

i. Industrial area (processing area)

No processing is involved

The mine is operated by means of opencast fully mechanised methodof mining which includes deep drilling and blasting, loading thebroken material by heavy machinery like two excavators with bucketcapacity of 2.1 m3 capacity.

ii. Residential area (non-processing area)

No residential area is proposed at mine.

iii. Greenbelt.

DCL has proposed to develop an area of 16.06 ha under greenbeltDCL has taken up massive planting in the leased area and outsidethe leased area also.

Survival rate in the area is found to be about 60 %. Apart from theplantation in the proposed mine area, DCL has taken up afforestationoutside the mine area (at cement plant and colony).

iv. Social infrastructure.

The mining activity carried out in the area rather has a positive socio-economic impact upon the nearby human settlement as indirectemployment potential is created due to mining and allied activities inthe area. Apart from these, the company promotes health andeducation awareness in the area time to time by organizing healthcamps and educational infrastructure.

In addition Deccan Cements Limited will take various social welfareprogrammes in the surrounding villages. The focus areas include:

Drinking Water Sanitation Health & Hygiene Education

Page 23: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

v. Connectivity (traffic and transportation road/ rail/ metro/ waterways etc.,)

Nearest railway line connecting Miryalaguda - Guntur of SouthCentral Railway line, at a distance of 6.6 km to SW direction from theMining Lease Area. Key map showing the location of various featuresaround the Mining Lease Area is shown in Fig – 2.

Nalgonda is major town at a distance of 60.3 km in NW direction.

The National Highway (NH-9) connecting Hyderabad - Vijayawada ata distance of about 36.8 km in NE,

The nearest railway station is Vishnupuram RS at 7.3 km in Wdirection.The nearest international airport is at Hyderabad – 147.3km- WNW.

vi. Drinking water management (source & supply of water)

Water requirement for the mine is about 120 m3/day. For dustsuppression the water is supplied to the mine site from KrishnaRiver.

vii. Sewerage system

Domestic waste water from mines office is treated in septic tankfollowed by soak pit.

viii. Industrial waste management

Not Applicable

ix. Solid waste management.

Area is devoid of any topsoil.

No top soil or waste is envisaged from the mine. The soil as andwhen generated from the mining will be used for greenbeltdevelopment. Hence stocking of top soil/waste in the form of dumpsis not envisaged.

x. Power requirement & supply / source.

The power required for illumination will be supplied from grid.

Page 24: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

CHAPTER – 7 REHABILITATION AND RESETTLEMENT (R & R) PLAN

i. Policy to be adopted (central / state) in respect of the projectaffected persons including home oustees, land oustees andlandless labourers (a brief outline to be given).

The mine area does not cover any habitation. Hence the miningactivities does not involve any displacement of human settlement. Nopublic buildings, places, monuments etc exist within the lease areaor in the vicinity. The mining operations will not disturb/relocateany village or need resettlement. Thus no adverse impact isanticipated.

Page 25: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:

CHAPTER – 8 PROJECT SCHEDULE & COST ESTIMATES

i. Likely date of start of construction and likely date of completion(time schedule for the project to be given).

Enhanced production will be commenced after getting EC, CFE, CFOand all other regulatory clearances. Life of the mine @ 2.3 milliontonnes per annum for the proved mineral reserve of 80.62 milliontonnes would be 33 years.

ii. Estimated project cost along with analysis in terms of economicviability of the project.

The estimated project cost for the limestone production will be aboutRs. 2.0 Crores.

CHAPTER–9 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

i. Financial and social benefits with special emphasis on thebenefit to the local people including tribal population, if any, inthe area.

Economic development of the region depends largely upon the natureof activities undertaken in the surrounding region. Corporatedevelopment invariably contributes towards acceleration of theprocess of socio-economic upliftment of the rural society by meansof employment, health & study programme, medical camps etc.

Employment: Preference will be given for locals for employmentbased on qualifications & requirement

Medical facilities: Medical facilities will be provided for employee aswell as people of nearby villages.

Educational facilities: Basic educational and vocational facilitieswill be provided to the children of employees as well as nearbyvillages.

Infrastructure facilities: Approach roads were already developed.

Page 26: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:
Page 27: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:
Page 28: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area:
Page 29: PRE FEASIBILITY REPORT Of BHAVANIPURAMenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-09-30 · PRE FEASIBILITY REPORT Of BHAVANIPURAM LIMESTONE MINE – 3 (Area: