PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli,...

15
Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi 17PREFEASIBILITY REPORT

Transcript of PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli,...

Page 1: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐17‐ 

 

 

 

 

 

PRE‐FEASIBILITY REPORT

Page 2: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Envirosolutions (P) Ltd. New Delhi                                                                                                                  ‐18‐

1. EXECUTIVE SUMMARY The total reserves/resources of  limestone of all categories and grades  in the country as per NMI data 

based on UNFC system as on 1.4.2015 have been estimated at 203,224 million  tons, of which 16,336 

million  tons  (8%)  are  placed  under  reserves  category  and  1,86,889  million  tons  (92%)  are  under 

remaining resources category. Karnataka is the leading state having 27% of the total resources followed 

by  Andhra  Pradesh  and  Rajasthan  (12%  each),  Gujarat  (10%),  Meghalaya  (9%),  Telangana  (8%), 

Chhattisgarh  and Madhya  Pradesh  (5%  each)  and  remaining  12%  by  other  states.[Indian Minerals 

Yearbook 2017, 56th Edition]. Indian cement industry is fast going industry and therefore requirement 

of  lime stone which  is  the main raw material  for manufacturing cement  is also  increasing day by day. 

The lime stone from the present mine is planned to be supplied to its own proposed cement plant and 

also to other cement plants. 

The proposal  is  for open cast mechanized extraction of  limestone mineral  from  Ittigehalli Village. The mining  lease was first granted on 18.01.1983 under ML No.1862 for a period of 20 years for mining of 

Limestone & Dolomite minerals  to  Shri. B. Ramaswamy.  Later  lease was  transferred  to M/s. Mysore 

Housing Co. Pvt. Ltd for extraction of limestone. The lessee Shri B. Ramaswamy has been appointed as 

director  of  the  company.  Subsequently  the  lease was  renewed  for  another  20  years  in  2003, w.e.f. 

18.01.2003 under ML No. 2473 over an area of 80.94 ha. Lease will be valid for 50 years from the date of 

grant  i.e.  17.01.2033  as  per MMDR Act  2015,  for  the  purpose  of  supplying  limestone  to  consumers 

industry/ or various buyers. (Lease deed Annexure‐I)  

Maximum annual proposed production from the limestone mine is 0.60 Million Tons. 

Scheme  of  Mining  was  approved  for  a  period  of  2008‐09  to  2012‐13,  vide  letter  no. 

MS/CTD/LST‐141‐SZ dated 13.08.2009 & valid up to 31.03.2013. 

The  latest  review & updation of mining plan  in  respect of  Ittigehalli Limestone Mine  (ML No. 2473) over an area of 80.94 ha at village Ittigehalli, Tehsil Hosadurga, District Chitradurga, State Karnataka was approved vide File no.‐279/769/2003/BNG Dated 12/04/2018.  (copy of mining plan approval letter enclosed as Annexure II). 

Earlier ToR was granted to Ittigehalli Limestone Mine vide  letter no. J‐11015/516/2008‐IA. II (M) dated 

25.02.2009 for production capacity of 0.6 million tons per annum. Since the market condition was very 

poor the ToR could not be persuaded, hence it got lapsed. (copy of earlier ToR enclosed as Annexure III). 

Now the PP  is applying for grant of Terms of Reference at a production 0.60 million tons of  limestone 

mineral  under  EIA  notification  2006  and  subsequent  amendments.  The  mode  of  mining  method 

proposed is Open cast mechanized with adoption of drilling and blasting.  

During previous mine plan  and  scheme of mining period no mining  activities were  taken up, due  to 

unfavourable conditions  like  lack of market, climatic conditions, etc. Hence,  the proposed production 

could not be achieved. Mine has not worked since 1994, therefore no production was carried out from 

the mine since 1994.Now the company  intends to carry‐out the mining operations  in accordance with 

the rules & regulations and present demand and favourable market conditions for limestone.  

The proposal is considered under Category “A” as the mining lease area of 80.94 ha situated at Village‐ 

Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga,  State‐ Karnataka  at  the  latitude  is 13⁰83’46.53"  to 

13⁰82’26.78” N, and longitude 76⁰28’50.64" to 76⁰48’32.12” E. The lease area falls in the Survey of India 

Toposheet No. 57 C/5 (OSM sheet no. D43Q5). 

Page 3: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐19‐ 

The  leasehold area displays an undulating  topography. The maximum and minimum elevations  in  the 

lease are 730 mRL and 652 mRL respectively. The lease area is non‐forest government revenue land.  

Method  adopted will  be mechanized  open  cast mining with  drilling  and  blasting. Drilling  equipment 

which may use are Wagon Drill, excavator, Jackhammer, compressor and tippers etc.  The bench height 

of 6m and working bench width of 10m is proposed to be maintained. The side burden, waste and other 

interburden materials will be dumped  separately  in  the waste dump yard as  shown  in  the  respective 

plates and later on utilized for rehabilitation of the area. Based on proved reserve of 7.329 million tons, 

the life of mine is estimated to be about 12 years however based on reserve & resource of 23.61 Million 

Tons as per mine plan, the life of mine has been estimated as 40 years.  

During  the plan period about 0.30 million  tons OB/reject will be generated which will be stacked  into 

dump  yard  created  in  the mined‐out  area. Mined  out  area  is  proposed  to  be  partially  reclaimed  by 

backfilling and rest of the area will be converted into water recharge pit. Plantation will be carried out at 

the  end  of  conceptual  period  over  backfilled  area.  The  raw materials  required  for working  includes 

21KLD water per day and 1400 litre diesel per day.  The project cost is about Rs. 242 Lakhs.  

ROM will be dispatched to consumers/ buyers directly. The mine will always have economic viability as 

the market is already assured. 

Nearest hospital  is Government Hospital,  located  in Siddapura, Chitradurga at about 4.87 km SW from 

this mining  lease  area.  All  other  community  facilities  like  Post  office,  ATM,  Police  Stations  are  also 

available in nearby villages. The lease area lies in the seismic zone II, which is least active zone. 

Analysis of proposal (Final Recommendations) 

The project is proposed to mine limestone in an area of 80.94 ha. It will provide direct employment to 

about 80 workers. Besides there will be  indirect employment for transportation, canteen, repair shop, 

security etc. Most of the employment will be given to locals from the nearby village. Further, the share 

of  indirect employment  like  increased purchasing power, dhabas and retail shops etc.  is  largely shared 

by local residents.  

 

 

 

 

 

 

 

 

 

 

 

Page 4: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐20‐ 

2. PREFEASIBILITY REPORT Introduction of Project—Background information 

The proposal is for Ittigehalli Limestone Mine over an area of 80.94 ha of M/s Mysore Housing Co. Pvt. 

Ltd located in village Ittigehalli, Tehsil Hosadurga, District Chitradurga of Karnataka state at the latitude 

is 13⁰83’46.53" to 13⁰82’26.78” N, and longitude 76⁰28’50.64" to 76⁰48’32.12” E. The lease area falls in 

the Survey of India Toposheet No. 57 C/5 (OSM sheet no. D43Q5). The proposed Maximum Production 

from the mine is 0.60 Million Tons per Annum. ROM from this mine will be sold to various buyers. 

M/s Mysore Housing Co. Pvt. Ltd  is promoted  to undertake mining activity. The company’s registered 

office  is  located  at  No.  302,  RV  Apartments,  No.  31,  99  Pipeline  road,  Malleshwaram  Bangalore 

Karnataka 560003. 

The mining lease was first granted on 18.01.1983 under ML No.1862 for a period of 20 years for mining 

of Limestone & Dolomite minerals to Shri. B. Ramaswamy. Later  lease was transferred to M/s. Mysore 

Housing Co. Pvt. Ltd for extraction of limestone. The lessee Shri B. Ramaswamy has been appointed as 

director  of  the  company.  Subsequently  the  lease was  renewed  for  another  20  years  in  2003, w.e.f. 

18.01.2003 under ML No. 2473 over an area of 80.94 ha. Mining  lease  located  in Sy No. 9 & 42. Lease 

will be valid for 50 years from the date of grant i.e. 17.01.2033 as per MMDR Act 2015, for the purpose 

of supplying limestone to consumers industry/ or various buyers. (Lease deed Annexure‐1)  

Earlier ToR was granted to Ittigehalli Limestone Mine vide  letter no. J‐11015/516/2008‐IA. II (M) dated 

25.02.2009 for production capacity of 0.6 million tons per annum. Since the market condition was very 

poor the ToR could not be persuaded, hence it got lapsed. (copy of earlier ToR enclosed as Annexure III). 

Now the PP  is applying for grant of Terms of Reference at a production 0.60 million tons of  limestone 

mineral under EIA notification 2006 and subsequent amendments. The present proposal  is categorized 

under “A” category as mining lease area is 80.94 ha, therefore it is being submitted to MoEF&CC. 

During previous mine plan  and  scheme of mining period no mining  activities were  taken up, due  to 

unfavourable conditions  like  lack of market, climatic conditions, etc. Hence,  the proposed production 

could not be achieved. Mine has not worked since 1994, therefore no production was carried out from 

the mine since 1994.Now the company  intends to carry‐out the mining operations  in accordance with 

the rules & regulations and present demand and favourable market conditions for limestone. 

Based on proved  reserve of 7.329 million  tons,  the  life of mine  is estimated about 12 years however 

based on reserve & resources which is 23.61 Million Tons as shown in the mine plan the life of mine has 

been estimated as 40 years. 

Need of the Project: 

There  is a growing demand of Cement  in  the  country. Production  from  the mine, will be  supplied  to 

consumers  industry and buyers. The project will generate direct and  indirect employment which will 

help in improving socio‐economic growth in the area. 

Demand‐Supply Gap: 

Accelerated growth in consumption of mineral in cement plant is taking place in the country; therefore, 

there will always be demand of limestone. The mined‐out mineral will be transported to various buyers 

for manufacturing of cement. 

 

Page 5: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐21‐ 

Imports vs. Indigenous production: 

There will be no import of limestone in the country as India has vast reserve of limestone.  

Export Possibility: 

Since  entire  limestone  will  be  transport  to  nearby  consumer’s  industry  hence  there  is  no  export 

possibility. 

Domestic/ export Markets: 

Entire limestone from the mine will be consumed domestically in nearby consumer’s industry. No export 

is proposed. 

Employment Generation: 

The maximum strength of direct workers will be 80. Majority of them will be hired locally. Besides direct 

employment,  substantial  amount  of  indirect  employment will  be  generated  in  the  form  of  dhabas, 

transporters, repair shops etc which will improve the economic conditions of the area. 

3. PROJECT DESCRIPTION Type of Project: 

Present  proposal  pertains  to  mining  of  Limestone  mineral  in  80.94  ha  in  Vill.  Ittigehalli,  Tehsil‐ 

Hosadurga, District‐ Chitradurga, State‐ Karnataka. The mine is categorized as category ‘A’ for obtaining 

the environmental clearance as per EIA notification 2006. Location of mine  is given ahead. This  is an 

opencast mechanized mine with  drilling  and  blasting. Maximum  annual  proposed  production  is  0.60 

Million Tons. (Location Plan is at Annexure IV) 

 

Interlinked Projects: 

No, It is not an interlinked project.   

 

Page 6: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐22‐ 

Lease Details: 

Name of the company    : M/s Mysore Housing Co. Pvt. Ltd. 

Name of Authorized person  : B. Ramaswamy 

Designation      : Managing Director   

Contact no      : 7829296630 

Email Id       : [email protected]  

Status of lessee          : Private Company 

Address  :  Village‐  Ittigehalli,  Tehsil‐  Hosadurga,  District‐  Chitradurga,  State‐                  

Karnataka 

Lease Area              : 80.94 Hectares 

Date of Grant           : 18.01.1983 

Location            :  Latitude    13⁰83’46.53" to 13⁰82’26.78” N 

                                                             Longitude 76⁰28’50.64" to 76⁰48’32.12” E 

The area falls  in the Survey of India Toposheet No. 57 C/5 (OSM sheet 

no. D43Q5). 

                                                  Vill. Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka 

 

Details of Alternate Sites: 

The mining of  limestone  is site specific and  is dependent on availability of mineral and grant of mining 

lease by the State Government. In the present case PP has been granted the lease of limestone having 

area 80.94 ha at village‐ Ittigehalli, Tehsil‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka. Therefore, 

no alternative site has been considered. 

Magnitude of operation: 

Page 7: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐23‐ 

Working for limestone is done by adopting mechanized opencast method with drilling and blasting. The 

mining lease has been granted over an area of 80.94 ha. It has been proposed to extract mineral of 0.60 

Million Tons Per Annum. The average number of working days in the year would be 300. 

Project description with process details 

Past Production: 

There has been no past production from the mining lease area since 1994 due to poor market conditions 

as depicted in the approved Mine Plan. 

Proposed Production: 

Proposed production  in  the  first 5  years of  the Mining plan  are  given  as under: However, maximum 

production will be 0.60 Million tons per annum. 

Year  Soil  Total Production 

(million tons) 

Waste 

(million tons) 

1st year  Nil  0.60  0.30 

2nd year  Nil  0.60  0.30 

3rd year  Nil  0.60  0.30 

4th year  Nil  0.60  0.30 

5th year  Nil  0.60  0.30 

Total  Nil  3.0  1.5 

The Surface & Geological Plan and the conceptual plan are shown as Annexure‐VI, VII & VIII. 

Equipment: 

The mine will be worked by opencast mechanized method. Mineral shall be exploited with the adoption 

of drilling and blasting. ROM will be transported by trucks/tippers to their consumer’s industry/ buyers. 

List of equipments is given below — 

Type  HP  Capacity  Nos. 

i) Excavator  150  200 t/h  3  

ii) Wheel Loader  120  3.2 m3  2  

iii) Rock breaker‐60  110  ‐  1  

iv) Wagon Drilling Equipment  100  115mm 

350 cfm 

1  

v) Dumpers Tata  110  20 tons  10 

vi) Tractor  mounted  water 

tanker 

40  5000 L  1 

vii) Mobile  Crushing  and 

screening Plant RM 100 

250  100t/hr  1 

viii) Service vehicle Tata Sumo  50  10 person  1 

ix) Water Pump  25  10,000 L  1 

x) Weigh Bridge  ‐  25.0 tons  1 

Hired dumpers will be deployed for transportation purpose. 

Page 8: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐24‐ 

Mobile Crushing unit  is proposed  to be deployed as per  requirement having a capacity 100  t/hr. This 

mobile crushing unit will have inbuilt dust extraction system with backfilter to restrict the fugitive dust 

going to the atmosphere. In addition, water spraying at the main transfer point will also be practiced.    

Salient Features of the proposed Working:  

Mechanized open cast mining with drilling & blasting. 

The area  is rocky having  least soil cover, 0 to 2m thick top‐soil  is observed  in  lower portion of the 

lease area.   

The  height  &  width  of  benches  will  be  kept  6.0m  &  10m  respectively.  Approach  road  having 

gradient 1:16 will be provided to join the mining faces. 

Ultimate depth of the pit will be 600 mRL. 

No. of working day will be 300. 

Total no. of direct employment is about 80(skilled, semi‐skilled and unskilled.) 

During mining water table is not likely to get intersected. 

ROM will be excavated by  excavator and sent to consumer by trucks/tippers.  

Raw Materials: 

The important inputs required for mining of desired quantity of mineral are given below.  

Inputs  Approx Quantity required  

Water for Drinking & Domestic  2KLD 

Water for Sprinkling and allied activities & Plantation  19 KLD 

Market and Mode of Transport: 

 The mineral produced from this mine will be sent to consumers by trucks/tippers. 

Resource Optimization/Recycling: 

It  is proposed to produce 0.60 million tons/annum of  limestone for the cement  industry which will be 

fully utilized for the purpose. While producing the limestone there will be generation of small quantity 

of soil which will be used for plantation. In addition, waste rock is also likely to be generated during the 

mining of  limestone which will be utilized for backfilling/reclamation of the mined‐out pit. Thus, there 

will be optimum utilization of all the material coming out from the mine.  

Requirement of Water, Energy/Power: 

The water will  be  used  for  drinking  purpose, wet  drilling,  sprinkling  and  plantation. Domestic water 

requirement will be 2 KLD approx.   Water  for sprinkling, dust suppression  in  the  lease and green belt 

development in the areas will be about 19 KLD. Thus, there will be total requirement of 21 KLD water (at 

peak demand). Water will be drawn  from existing borewell of  the company  located outside  the  lease 

area. No electricity will be required. All mining work will be carried out in day time. All equipments are 

diesel driven. 

Waste Generation and Disposal: 

The area is stony topography having no soil cover therefore generation of top soil shall be insignificant 

as only small quantities of top soil  is observed  in the  lower portion of the  lease area. Removed topsoil 

will be used for afforestation in 7.5m boundary barrier zone. 0.30 million tons per annum of waste will 

be generated due to advancement of mining faces, which will be used in backfilling. 

Page 9: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐25‐ 

4. SITE ANALYSIS:  Location and Connectivity of the lease is given as under: 

Location and Connectivity:  

The lease area falls in the Survey of India Toposheet No. 57 C/5. (OSM sheet no. D43Q5). The lease area 

is  non‐forest  government  revenue  land.  The  Latitude  13⁰83’46.53"  to  13⁰82’26.78” N  and  longitude 

76⁰28’50.64" to 76⁰48’32.12” E marks the lease area.  

SH‐19  is 10 km E from the mine  lease. The nearest railway station  is Hosadurga Railway Station about 

36.87 km W from the lease area. The location plan is shown in Annexure IV and 10 Km. Buffer area at 

Annexure V 

Land use and Land ownership: 

It is a government revenue land, involving 80.94 ha. Land is mainly rocky terrain. The details of existing and 

proposed land use are given below — 

S.NO.  Activities  Present 

land use 

(in ha) 

Plan period 

 (in ha) 

 conceptual /lease 

period (in ha) 

1  Area earmarked for mining  4.00  7.00  40.00 

Backfilling & Plantation  ‐  ‐  8.00 

Top bench Plantation  ‐  ‐  17.00 

Water recharging pit  ‐  ‐  15.00 

2  Area  earmarked  for  7.5m 

statutory  boundary  where 

plantation  in  this area will be 

done  in  plan/conceptual 

period  3.15  3.15  3.15 

3  Area under Roads  1.00  1.00  1.00 

4  Area  under  temporary 

dumping 

0.15  2.3  ‐ 

5  Unused area  72.64  67.49  36.79 

  Total area  80.94  80.94  80.94 

Total 28.15 ha area during conceptual period will be converted in to green area.  

Topography of the area: 

The  topography  is  rough  and  rugged  representing  the  typical  scenario  of mountainous  region.  The 

maximum and minimum elevations in the lease are 730 mRL and 652 mRL respectively. The lease area is 

non‐forest government revenue  land. The  lease area  is hilly terrain sloping towards north. The subject 

area is surrounded by revenue waste lands, Vanivilasa Sagara Reservoir and agricultural, forest lands. 

 

Page 10: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐26‐ 

 

Drainage 

Core zone: 

The  drainage  pattern  of  the  lease  area  is  dendritic  to  sub‐dendritic  in  nature.  No  perennial  and 

ephemeral stream are seen with‐in the mining lease area. 

Buffer zone: 

The drainage pattern of buffer‐zone area is dendritic to sub‐dendritic in nature. Three seasonal nallahs 

flows on western, eastern and southern sides of the lease area and flows to Vanivilasa Sagara Reservoir. 

Geology of the area: 

Regional and Local Geology of the area is briefly described as under: 

Regional Geology: The Chitradurga basin is an elongated narrow belt of 450 kms in length. It narrows southwards and splits 

up  into  several  linear  strips  south  of  Dodguni.  The  basin  is  structurally  disturbed,  followed  by  later 

folding and shearing movements and covers an area of about 5550 sq,km.  It trends NNW‐SSE with an 

Page 11: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐27‐ 

easterly moderate dip. Shelf facies is subordinate confined to a narrow strip along the western margin. 

In the main, the basin shows characteristics of sedimentation in deep water. The mafic complex to the 

south of Chitradurga  town  represents one of  the  thickest  accumulations of pillowed  tholeiitic basalt 

associated with pyro‐clastics. Basement gneiss of smaller dimensions is present. The eastern margin is a 

thrust contact with mylonite zone. An  intrusive granite [2500 Million years] sets the upper  limit to the 

sedimentation.  The  change  of  oxide  –  carbonate  facies  with  chert  and  manganese  ore  [gradually 

subsiding  basin]  to  sulphide  facies  with  carbonaceous  shale,  chert  layers  with  dominant  pyrite  is 

observed in the deeper parts of the Chitradurga basin. Thus, traced along the strike the iron formation 

appears  differently,  having  formed  under  different  environments  of  deposition.  Metamorphism  of 

Chitradurga basin is of Green schist facies, at places it graduates into amphibolite facies, though garnet 

do occur. 

Local Geology: 

This  area  forms  a  part  of  Vanivilasa  Formation,  Chitradurga  group  of  rocks.  The  general  geological 

sequence of rock formations found  in the  lease area on the basis of field observations (marked on the 

geological plan) are as given below: 

‐‐ Soil cover ‐ broken BHQ / Calcareous 

‐‐ Limestone/Dolomite 

‐‐ Manganiferous Phyllites 

‐‐ BHQ 

‐‐ Conglomerates 

‐‐ Granites 

The  general  strike  direction  of  the  formations  is  north  to  south  in  the  region.  And  exhibit  50°  dip 

towards East. 

Soil cover/Calcareous soil: 

Soil cover in the lease area in general is very small hence insignificant. However in lower portion of lease 

area about 0 to 2m thick mixed top‐soil is observed at some places. The soil cover is generally reddish in 

colour,  lateritic  in  nature  with  fragments  of  BHQ  and  Calcareous.  The  soil  is  not  conducive  for 

agriculture. 

Limestone: 

Limestone occurring  in  this area  is steel grey  in colour, crystalline,  fine  to medium grained  in  texture, 

massive,  hard  and  compact  with  occasional  dolomite,  schistose  laminations.  The  limestone  shows 

typical bedded nature with  varying  thickness.  The  general  strike of  the  limestone bed  is N15°W  and 

S15°E with easterly dipping with 50°. 

Manganiferous phyllites: 

Manganiferous phyllites occur adjacent  to  limestone  in  the  foot wall side.  It  is extensively weathered 

and often attains powdery forms. Phyllites are generally greyish in colour.  

BHQ/Conglomerate/Granites: 

From  the western part of  the  lease area  /Granites, conglomerates and BHQ was observed within  the 

lease area. Which are shows same dip and strike of the limestone beds. 

 

 

Page 12: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐28‐ 

Structure: 

Sedimentation and volcanism in the Chitradurga supracrustal belt is linked to variable subsidence of the 

basement foundation, probably as a result of rifting. The structural evolution of the belt followed as a 

direct  continuation  of  events  that  controlled  the  depositional  and  volcanic  history.  Variable 

displacement of the basement during these late Archaean events in the Karnataka craton took place on 

shear zones and related fractures that acted as channels for water and CO2 as indicated by vein minerals 

and alteration products. Deformation  led  to a series of upright anticlines and synclines and related LS 

fabrics with extreme variations in plunge of the coaxial fold axes and L fabrics within axial surfaces which 

maintain a steep orientation. Low‐grade metamorphism outlasted the deformation. 

Exploration:    

Diamond drilling of 20 holes, were drilled by the M/s. Madras Cements Pvt. Ltd., during the period 2001‐

02. 

Proposed method for mining is open cast mechanized mining. Drilling and blasting will be carried out by 

use deep hole drilling and blasting as and when required. During the plan period, it is proposed to work 

in eastern side of the mining lease in Pit‐1 and by merging Pits 2 & 4, advancing towards northern side. 

Quality & Grade of Mineral: 

Cut‐off grade for limestone is 35% CaO. However, the lowest grade available in this mine is 35.48% CaO. 

Reserves: 

The  reserve &  resources  estimated  at  about 23.61 Million  Tons  as on date which will  increase  after 

further exploration carried out after obtaining Environmental Clearance. 

Life of Mine: 

Based  on  proved  reserve  of  7.329 million  tons,  the  life  of mine  is  estimated  to  be  about  12  years 

however based on reserve & resource of 23.61 Million Tons as per mine plan, the life of mine has been 

estimated as 40 years.   

Sensitivity of Location: 

The nearest water body is Vani Vilasa Sagara reservoir about 0.96 km NW.  

There is Marikanave Reserved forest at 0.60 Km E to the lease boundary. 

The lease area lies in the seismic zone II. 

The nearest settlement is Nagathihalli village at 2.55 km SW.  

Existing Infrastructure:  

The area is connected with all season motor roads. The nearby villages are electrified.  

Soil classification: 

There is very little soil in the lease area. However about 0 to 2m thick mixed top‐soil is observed in lower 

portions of the lease area. The soil cover is generally reddish in colour, lateritic in nature with fragments 

of BHQ and Calcareous. The soil is not conducive for agriculture. 

Climatic Data from Secondary sources:  

The climate is tropical with temperatures ranging from 26 °C to 36 °C in the summer and 12°C to 28 °C in 

the winter. The district receives low to moderate rainfall and is one of the drought prone districts in the 

state.  Normal  annual  rainfall  varies  between  668mm  in  Holalkere  in  western  part  to  457mm  in 

Chellakere, in the northeastern part. 

Page 13: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐29‐ 

Social Infrastructure Available: 

Nearest hospital  is Government Hospital,  located  in Siddapura, Chitradurga at about 4.87 km SW from 

this mining  lease  area.  All  other  community  facilities  like  Post  office,  ATM,  Police  Stations  are  also 

available in nearby villages. 

5. PLANNING BRIEF Planning Concept 

Proposed  project  is  an  open  cast  mechanized  mining  with  adoption  of  drilling  and  blasting  using, 

excavator, Wagon drilling equipment, Rock breaker‐60 and tippers etc. 

Population Projection 

There will be employment to about 80 persons in the mine (skilled, semi‐skilled and unskilled). Most of 

the  labor will be employed from nearby villages hence there will be  insignificant  impact  in  increase of 

population.  

Land use planning 

Mined out area will be backfilled with waste generated during mining & sub soil shall be carpeted over it 

to bring back its maximum original topography. There will be plantation in the safety zone of 7.5 m. 

Assessment of Infrastructure Demand 

The proposed mining activity will produce limestone. There will be construction of temporary structures 

such as mine office, rest shelters, store etc as per approved mine plan. 

6. PROPOSED INFRASTRUCTURE Industrial Area: 

No infrastructure is proposed.  

Residential Area: 

As most of workers are employed from nearby villages, no residential area/ housing is proposed. 

Physical Infrastructure: 

There will be construction of  temporary structures  such as mine office,  rest shelters, store etc as per 

mine plan. 

Green Belt/Afforestation: 

Proposed Plantation: 

The plantation details  for  the plan period and next  successive block of 5 years upto conceptual/lease 

period is given in the table below. 

Period  Proposed plantation  location  Name of species 

2018‐19 to 2022‐

23 

2500  On safety zone  Species Like Kanuga, Neem, 

Tamarind and other local 

species 2023‐24 to 2027‐

28 

5000  Back filling area 

and Top bench 

Page 14: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐30‐ 

2028‐29 to 2032‐

33 upto lease 

period i.e. 

17.01.2033 

5000  Plantation 

Number  of  plants will  go  up  substantially  as  and when mined  out  benches will  be  available  for 

reclamation. 

Social Infrastructure: 

Due  to  initiation of mining project  there will be  an overall development  in  social  infrastructure  as  a 

result of indirect employment. 

Drinking Water Management (Source & Supply of Water): 

Domestic water requirement will be approx 2 KLD, Water for sprinkling & dust suppression and green 

belt  development  about  19  KLD.  Thus,  there  will  be  total  requirement  of  21  KLD  water  (at  peak 

demand). Water will be drawn from existing borewell of the company located outside the lease area. 

Solid Waste Management: 

The waste consists of murrum and Manganiferous phyllites, which is nontoxic in nature. It is proposed to 

handle  about  1.5  Million  Tons  of  waste  during  first  five  year  plan  period  which  will  be  dumped 

temporarily at in earmarked area of 2.3 ha. at north eastern side of the lease area. Power Requirement: 

No electricity  is required for  limestone mine. Work will be carried out  in day time. All equipments are 

diesel driven. 

Supply/Source of Energy: 

Overall average diesel consumption will be 1400 L/day. 

7. REHABILITATION AND RESETTLEMENT (R &R) PLAN:  The mining lease encompasses about 80.94 ha area which consists of limestone. Entire lease area falls in 

Government revenue land. Since there is no displacement of any person from the lease area hence no 

rehabilitation and resettlement will be needed. 

8. ENVIRONMENT MANAGEMENT PLAN  Mining  operations mainly  contribute  to  generation  of  dust  for  which  sprinkling  of  water  is 

proposed. 

Vegetative barrier is proposed for dust suppression. 

All the equipment’s will be of highest standard of reputed make and adhered to  international 

standards.  

Groundwater table is not going to be intersected throughout the future mining. 

Maintenance of approach road will be done regularly. 

Benches shall be rehabilitated by planting local species in place of existing rocky land. 

Labours will be made aware of the ways of clean and green environment. 

9. PROJECT SCHEDULE & COST ESTIMATES. Likely date of start of Mining and likely date of completion: 

Page 15: PRE FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/26...Ittigehalli, Taluk‐ Hosadurga, District‐ Chitradurga, State‐ Karnataka at the latitude is 13⁰83’46.53"

Ittigehalli Limestone Mine (80.94 ha) of M/s. Mysore Housing Co. Pvt. Ltd. 

Prepared by: Perfact Enviro Solutions (P) Ltd. New Delhi                                                                                                                 ‐31‐ 

After grant of EC for extraction of limestone, mining from lease area will be started after 3‐4 months.  

Project Cost along with analysis in terms of Economic Viability of the Project:  

The project cost is about Rs. 242 lakhs. mine will always have economic viability as the market is already 

assured. 

10. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) The project is proposed to mine limestone in an area of 80.94 ha. It will provide direct employment to 

about 80 workers. Besides, there will be indirect employment from transportation, canteen, repair shop, 

security etc. Most of the employment will be given to locals from the nearby village. Further, the share 

of  indirect employment  like  increased purchasing power, dhabas and retail shops etc.  is  largely shared 

by local residents.  

The  Company  M/s.  Mysore  Housing  Co.  Pvt.  Ltd.  Mining  Industries  is  committed  to  fulfill  its 

responsibilities towards CSR.