PRE-FEASIBILITY REPORT For Kutrumali Bauxite Mine Mining Capacity: 3.0 MTPA (Mine Lease Area: 696.734 ha)

Transcript of PRE-FEASIBILITY REPORT For Kutrumali Bauxite...

PRE-FEASIBILITY REPORT

For

Kutrumali Bauxite Mine Mining Capacity: 3.0 MTPA

(Mine Lease Area: 696.734 ha)

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 1

TABLE OF CONTENTS

1.0. Executive Summary .................................................................................... 2

2.0. Introduction of the Project/Background Information ....................................... 4

3.0. Project Description ..................................................................................... 8

4.0. Site Analysis ............................................................................................ 18

5.0. Planning Brief .......................................................................................... 22

6.0. Proposed Infrastructure ............................................................................ 25

7.0. Rehabilitation And Resettlement (R&R Plan) ................................................ 28

8.0. Project Schedule and Cost Estimates .......................................................... 28

9.0. Analysis of Proposal (Final Recommendation) .............................................. 29

LIST OF FIGURES

Figure-1. Flow Chart of the Project ....................................................................... 9

Figure-2. Clearance Process for Category-A Project .............................................. 17

LIST OF TABLES

Table-1. Salient Feature of the Project ................................................................... 2

Table-2. Proposed Extent of Mechanisation ............................................................. 5

Table-3. Quantity and Value of Import of Bauxite .................................................... 7

Table-4. Quantity and Value of Export of Bauxite .................................................... 7

Table-5. Employment Potential ............................................................................. 7

Table-6. Location Coordinates ............................................................................... 8

Table-7. Water Requirement ............................................................................... 15

Table-8. Year Wise Production of Minerals ............................................................ 16

Table-9. Mining Lease Area Breakup and Land Use Details ...................................... 18

Table-10. Landuse / Landcover of Core Zone ........................................................ 19

Table-11. List of Major Forest In Buffer Zone ........................................................ 20

Table-12. Village Wise Population ........................................................................ 22

Table-13. Landuse Pattern .................................................................................. 23

Table-14. Proposed Yearwise Plantation Programme .............................................. 24

Table-15. Project Cost Breakup ........................................................................... 28

LIST OF ANNEXURE

Annexure-I. Index Map ...................................................................................... 30

Annexure-II. Khasra No’s/ DGPS Map Certified by ORSAC ...................................... 31

Annexure-III. Study Area Map ............................................................................ 41

Annexure-IV. Mine General Layout ................................................................... 42

Annexure-V. Afforestation / Greenbelt ................................................................. 43

Annexure-VI. Surface Plan ................................................................................. 44

Annexure-VII. Geological Plan ............................................................................. 45

Annexure-VIII. Geological Cross Section .............................................................. 46

Annexure-IX. Conceptual Mine Plan ..................................................................... 47

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 2

1.0 Executive Summary

Introduction

M/s Larsen & Toubro Limited is proposing the bauxite mining project located in

the districts of Kalahandi and Rayagada, Odisha State. The proposed capacity of

the project is 3.0 MTPA.

The proposed bauxite mining project in ML area of 696.734 ha. About 8.22% of

the ML area is forest land (Forest land- 14.23 ha [village forest – 12.61 ha & DLC

forest – 1.62 ha], Proposed Reserved forest- 43.09 ha). Opencast mechanized

mining method without blasting is proposed for this project. Brief description of

the project is described below:

Salient Feature of the Project

The salient features of the mining details are presented in Table-1.

TABLE-1

SALIENT FEATURES OF THE PROJECT

Sr. No. Parameters Description

1 Name of the project Proposed Mining project of M/s Larsen & Toubro

Limited at Kutrumali Bauxite Mine

2 Location of the project

Kutrumali, Podapai, Majhigan, Murlimuhin,

Melrapa, Salabali villages and Mohangiri

Reserve Forest (Proposed) under Thuamal

Rampur Tehsil of Kalahandi District and

Padelgura, Alutunga under Kashipur Tehsil and

Sadalasa under Rayagada Tehsil of Rayagada

District in Odisha

Index map enclosed as Annexure-I

3 Nature of the project Bauxite Mining

4 Project Proponent M/s Larsen & Toubro Limited, Mumbai

5 Lease period validity 50 years

6 Total Lease area 696.734 ha (1721.68 acres)

7 Life of Mine 22 years

8 Details of the Lease

Area

Details provided in the map enclosed as

Annexure-II

9 Lease area Coordinates

(Details are as per DGPS map certified by

ORSAC enclosed as Annexure-II)

Corner Latitude Longitude

A 19° 27’ 48.25” N 83° 10’ 11.47” E

B 19° 29’ 6.12” N 83° 12’ 49.41” E

C 19° 26’ 33.88” N 83° 13’ 7.87” E

D 19° 25’ 50.28” N 83° 12’ 55.32” E

E 19° 26’ 49.64” N 83° 10’ 59.35” E

10 Capacity of the project

(peak) 3.0 MTPA

11 Category of the project “A”

12 Land Type Rain fed Single crop agricultural land and stone

waste land

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 3

Sr. No. Parameters Description

13 Method of Mining Opencast Mechanized Mining

14 Operational days/year 250 days

15 Bench Height 10 m

16 Ore to OB ratio 1 : 0.4

17 Overall pit slope 45o

18 Total water requirement 500 m3/day

19 Source of water Naragul nala, 3.5 km

20 Man power requirement 193

21

Nearest Railway

Station/ Airport along

with distance in km.

Nearest Railway Station

Sikarpai RS -12.5 km, SE

Nearest Airport

Visakhapatnam – 188 km, S

22 Nearest Highway

SH-44 (Rupkona – Kashipur – Gunupur -

Bawanipatna), 5.20 km, W

SH-45 (Jaykaypur - Kalyansinpur), 9.25 km, E

23

Nearest Town, city,

District Headquarters

along with distance in

km

Kashipur – 13.1 km, SW

Rayagada – 34 km, SSE

24

Ecological Sensitive

Areas (Wild life

Sanctuaries, National

Parks, Biosphere

Reserves,

Reserve/Protected

Forest etc.)

Karlapat wildlife sanctuary, 20.5 km, NNW

Reserved/Protected Forests

1. Mohanagiri RF

2. Mandibishi RF

3. Kalibhata RF

4. RF near Budegarha village

5. RF near Aliguna Village

6. Amapadar RF

7. Ladakhman RF

8. Singari RF

9. Kalyansinpur RF

10. Chhatapadar RF

11. Paharhapadas RF

12. Khakes RF

13. Kandabindha RF

14. Sajja PF

15. Kasapari RF

16. Kasapar Extn RF

17. Karanja RF

18. Karhakhaman RF

1.0 km, N

2.3 km, S

5.2 km, W

8.3 km, ESE

8.7 km, NW

9.4 km, NW

9.9 km, W

11.2, NNE

11.3 km, ENE

11.6 km, NE

12.3 km, N

12.6 km, NW

12.6 km, SW

13.9 km, ESE

14.0 km, NW

14.5 km NW

14.3 km, NE

14.7 km, NNW

Proposed Reserved Forest

1. Bijay Nagar RF

2. Kalagan RF

3. Melaghara RF

4. Dhanda RF

5. Bartibal RF

6. Ajaygarh RF

7. Bhasangamali RF

8. Mohanagiri RF

9. Rastugurha RF

Adj. East

2.15 km, S

2.9 km, N

3.1 km, SW

3.7 km, SSE

4.0 km, E

5.7 km, S

5.8 km, N

6.2 km, SSW

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 4

Sr. No. Parameters Description

10. Utang RF

11. Alanda RF

12. Sunger RF

13. Bijepur RF

14. RF near Sikarpai

15. Ribal kana RF

6.8 km, SE

6.9 km, ESE

7.0 km, W

9.0 km, NNE

9.8 km, ESE

11.3 km, ESE

25 Historical Places Nil

26 Seismicity Seismic zone-II as per IS 1893 (Part-I):2002

All values are aerial distance

2.0 Introduction of the Project/Background Information

2.1 Identification of the Project and Project Proponent

Larsen & Toubro Limited (L&T) is a diversified Indian multinational conglomerate

with very sound technical and financial resources. During 2014-15, the

consolidated revenue was in excess of Rs. 92,000 Crores. It operates in over 30

countries worldwide. A strong, customer–focused approach and the constant

quest for top-class quality have enabled L&T to attain and sustain leadership in its

major lines of business for over seven decades.

L&T has proposed to set up an alumina refinery project in Odisha. Investment

decision is dependent on the captive source of sizeable reserves of bauxite. The

state government granted the prospecting licenses to L&T for Kutrumali and

Sijimali bauxite deposits. Both the deposits are nearby and are located in

Kalahandi and Rayagada districts. After successfully completing the prospecting

operations, L&T applied for mining leases. State government has recommended

the applications to central government for their approval for grant of mining

leases in accordance with law.

Out of total estimated mineable reserves of bauxite in these two deposits to the

tune of 249 million tonnes, Kutrumali deposit has got 47 million tonnes and the

balance 202 million tonnes are from Sijimali deposit.

The ultimate capacity of 3 MTPA of the proposed alumina refinery will require

bauxite of 9 MTPA, considering 3 tonnes of bauxite for 1 tonne of alumina. This

requirement will be met partly from Kutrumali (3 MTPA) and partly from Sijimali

(6 MTPA). This report is for mining of bauxite from Kutrumali deposits at a rate of

3 MTPA (peak). A separate report for mining of bauxite from Sijimali deposits has

been prepared.

L&T is known to be a reputed engineering conglomerate having highly qualified

engineers. L&T is a leading manufacturer of state of the art mining equipment and

a global engineering player in the field of metals and mining and therefore they

are in a pre-eminent position to conduct scientific and environment friendly

mining. The mining methods, amongst others, shall aim at minimising or

eliminating blasting operations. Extensive use of Surface Miners and/or IPCC (In

Pit Crushing and Conveying) shall be resorted to.

2.2 Brief Description of Nature of Project

The lease area of 696.734 hectares (1721.680 acre) falls under tehsil Thaumul–

Rampur of Kalahandi district and tehsils Kashipur & Rayagada of Rayagada district

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 5

in the state of Odisha. The lease area falls under the Survey of India toposheet

no. E44F3 and bounded by latitude of 19° 25’ 50.28” to 19° 29’ 6.12” N &

longitude of 83° 10’ 11.47” to 83° 13’ 7.87” E. The proposed lease area is having

about 47 million tonnes of mineable reserves.

The extracted bauxite will be used in the proposed 3 MTPA production capacity

alumina refinery in Rayagada district, Odisha. The mining lease shall be granted

for Bauxite mining for a period of 50 years. The proposed Bauxite mine shall be

developed by opencast mechanized mining method. The main operation shall

include removal and stocking of top soil by excavator cum loaders, exposing the

aluminous bauxite/bauxite zone and proper levelling by dozer and use of surface

miners. Bauxite will be then sorted out and reduced its size. The remaining rejects

will be used for backfilling.

Extent of Mechanization

The entire mining activity involves fragmentation/loosening of in-situ rock mass,

excavation, loading and hauling, sizing and subsequent handling/transportation

etc. These are envisaged to be carried out by employing equipment like rippers,

drills, excavators and loaders, rear dump trucks, crusher, feeders and belt

conveyors etc. the details of proposed extent of Mechanization are given in below

Table-2.

TABLE-2

PROPOSED EXTENT OF MECHANISATION

Type No’s Capacity Motive Power

Surface Miner 1 800 tph Diesel/electrical

Primary Crusher 1 800 tph Electrical

Single shank ripper for Area-I & II 2 400 tonnes/hr 770 HP diesel

engine

150 mm crawler-mounted drills with

onboard compressor

3 12 m/hr diesel

105 mm crawler-mounted drills with

onboard compressor

4 12 m/hr diesel

Hydraulic excavator 3 3.8 m3 diesel

Front-end loader 5 5.6 m3 diesel

Dumper for bauxite transportation 12 50 tonnes diesel

Dumper for overburden

transportation

6 50 tonnes diesel

Rear dump trucks for bauxite

transportation

17 35 tonnes diesel

Rear dump trucks for overburden

transportation

8 35 tonnes diesel

Crawler-mounted bulldozer 4 - 410 HP diesel

engine Tyre-mounted bulldozer – 300 HP 2 -

Road grader 1 - 145 HP diesel

engine

Water Tanker 3 28 KL diesel

Tyre-mounted hydraulic rock breaker 2 - diesel

Truck-mounted AN-FO mixing cum

charging unit

2 - diesel

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 6

2.3 Need for the project and its importance to the country and region

Bauxite is basically an aluminous rock containing hydrated aluminium oxide as

the main constituent and iron oxide, silica and titania in varying proportions.

Hydrated aluminium oxides present in the bauxite ore are diaspore and

boehmite, Al2O3. H2O (Al2O3- 85%; Al- 45%); gibbsite or hydrargillite, Al2O3.

3H2O (Al2O3-65.4%; Al-34.6%), and bauxite (containing colloidal alumina

hydrogel), Al2O3. 2H2O (Al2O3-73.9%; Al-39.1%). Bauxite is an essential ore of

aluminium and is one of the most important nonferrous metals used in the

modern industry. It is also an essential ore for refractory and chemical

industries. The country has abundant resources of bauxite which can meet both

domestic and export demands.

The production of mineral and its subsequent use in the Alumina Refinery will

benefit by way of royalty and taxes and will also bring in large employment

opportunities to the local populace thereby usher in socio-economic benefit to

the backward region.

2.4 Demand and Supply Gap

The production of bauxite at 15,360 thousand tonnes in 2012-13 increased by

13% as compared to previous year, due to better market demand.

There were 152 reporting mines in 2012-13 as against 172 in the previous year.

Besides, production of bauxite was reported as associate mineral by 10 mines

during the year. In all, 70 producers reported production of bauxite in 2012-13.

Ten principal producers having 42 mines contributed 86% of the total

production. Forty seven major mines, each producing more than 50 thousand

tonnes per annum, together accounted for 93% of the total production. The

contribution of the Panchpatmali bauxite mine of NALCO was 35% of the total

production. The share of public sector mines was about 42% of the total

production in 2012-13 as against 43% in the previous year. About 63% of the

total production of bauxite was of 40-45% Al2O3 grade, 15% was of Cement

grade, 12% was of 45-50% Al2O3 grade, 7% was of below 40% Al2O3 grade,

2% was of Refractory grade and one percent of production was reported

together in 50-55% Al2O3, 55-60% Al2O3, Abrasive and Chemical grades during

the year under review.

Odisha continued to be the leading producing state and accounted for about

36% of the total production. Next in the order of production were Gujarat (20%)

Jharkhand & Maharashtra (13% each), Chhattisgarh (12%), Madhya Pradesh

(5%) and the remaining one percent was produced by Goa, Karnataka and Tamil

Nadu.

Mine-head stocks at the end of 2012-13 was 6,902 thousand tonnes as

compared to 7,988 thousand tonnes at the beginning of the year. About 90% of

the total stock was held in Gujarat at the end of the year. The average daily

employment of labour in bauxite mines was 6,905 in 2012-13 as against 7,684

in the previous year.

It has always been seen that in the cases i.e. for Bauxite there remains a

demand and supply gap as demand is always high in respect of supply.

(Source: Indian Mineral Year Book 2013, Part-III: Mineral Reviews)

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 7

2.5 Imports V/s indigenous production

The country has large resources of Bauxite, occupying the sixth place in the

world’s total resources. The resources of metallurgical grade Bauxite are quite

adequate while those of the chemical and refractory grade Bauxite are relatively

limited considering the future requirements. That’s why it is necessary to import

Bauxite of this grade. The quantity and value of import of Bauxite is given in the

following Table-3:

TABLE-3

QUANTITY AND VALUE OF IMPORT OF BAUXITE

Year Quantity (Thousand Kg.) Value (Rs. Lakhs)

2013-14 3,30,265.03 18,608.02

2014-15 (Apr-Oct) 10,47,315.00 41,245.14

(Source: Ministry of Commerce and Industry)

2.6 Export Possibility

The quantity and value of export of Bauxite is given in the following Table-4.

TABLE-4

QUANTITY AND VALUE OF EXPORT OF BAUXITE

Year Quantity (Thousand Kg.) Value (Rs. Lakhs)

2013-14 33,26,678.00 61,199.34

2014-15 (Apr-Oct) 37,88,039.50 74,105.96

(Source: Ministry of Commerce and Industry)

2.7 Domestic Markets

The bauxite of the lease area is of metal grade (+40% Al2O3 on an average),

therefore is suitable for Aluminium plants, like NALCO, Hindalco and BALCO.

2.8 Employment Generation (Direct & Indirect) due to the project

Actual requirement of manpower is generally worked out after industrial

Engineering study during project implementation stage. However, a preliminary

estimate has been made to indicate the order of manpower requirement. The

detail of manpower requirement is given in Table-5.

TABLE-5

EMPLOYMENT POTENTIAL

Sr. No. Category Manpower

1 Managerial 10

2 Supervisory 14

3 Clerical 09

4 Skilled 117

5 Semi- Skilled 22

6 Un-Skilled 21

Total 193

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 8

3.0 Project Description

3.1 Type of Project

As per Gazette notification of Ministry of Environment Forests and Climate Change

(MoEF&CC), New Delhi all projects greater than 50 hectare falls in category “A”.

As in this case, the lease area is 696.734 hectare, so this project falls in “A”

category. The extracted bauxite will be used in proposed aluminium refinery (3.0

MTPA) in Rayagada district, Odisha.

Bauxite is a naturally occurring rock which is site specific due to its geological

origin. No alternative sites are proposed.

3.2 Location (map showing general location, specific location, and project boundary &

project site layout) with coordinates

The Kutrumali bauxite mine is located at Villages - Kuturumali, Podapai,

Majhigaon, Murlimuhin, Melrapa, Salabali villages and Mohangiri Reserve Forest

(Proposed) under Thuamal Rampur Tehsil of Kalahandi District; Padelgura,

Alutunga under Kashipur Tehsil and Sadalasa under Rayagada Tehsil of Rayagada

District, State-Odisha over an area of 696.734 ha (1721.680 acre). The

geographical coordinates of ML area is given in Table-6. Study area map

enclosed as Annexure-III.

TABLE-6

LOCATION COORDINATES

Corner Latitude Longitude

A 19° 27’ 48.25” N 83° 10’ 11.47” E

B 19° 29’ 6.12” N 83° 12’ 49.41” E

C 19° 26’ 33.88” N 83° 13’ 7.87” E

D 19° 25’ 50.28” N 83° 12’ 55.32” E

E 19° 26’ 49.64” N 83° 10’ 59.35” E

Note: Details are as per DGPS map certified by ORSAC enclosed as Annexure-II

3.3 Details of alternate sites considered and the basis of selecting the proposed site,

particularly the environmental considerations gone into should be highlighted

Bauxite is a naturally occurring rock which is site specific due to its geological

origin. No alternative sites are proposed.

3.4 Size and Magnitude of Operation

The total geological reserve is 70 million tonnes, out of which 47 million tonnes

have been considered as mineable reserves.

Of the total mineable reserves, about 34 million tonnes occur in the western block

and the balance 13 million tonnes in the eastern block. It is proposed to

undertake mining operation initially in the western block having reserves of 34

million tonnes with an average alumina 43.5 % and silica 1.42 % which would last

for about 10/12 years at the end of which the eastern block will be taken up.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 9

Mine general layout

General layout of the mine showing the proposed mining areas.

Overburden/waste and topsoil dumps, crushing plant, service centre, electric sub-

station, on-ground water reservoir, explosive magazine, haul roads, roads to

crusher house and waste disposal area etc. Mine general layout is enclosed as

Annexure-IV.

3.5 Project Description with Process Details

It is proposed to carryout mining activities at two locations in the western block,

namely Area-1 and Area-2. Two to three bauxite benches will be developed in

each of these areas. However, the two areas will merge in due course. Process

flow sheet is shown in Figure-1.

Based on the respective reserve base and average grade, it is planned to

excavate about 70 % of the annual requirement of bauxite from Area-2 and about

30% from Area-1. The suggested quantum of excavation from two areas is,

however, provisional only, and maybe adjusted suitably depending upon the

quality requirements and day to day situation in the field.

In order to ensure sustained availability of bauxite, the development work of

overburden removal will continue during production stage. The overburden raised

will be disposed-off to the waste stockpile and the r.o.m bauxite will be delivered

either to crusher house directly or to r.o.m Ore stockpile, the space for which has

been provided near crusher house.

FIGURE-1

FLOW CHART OF THE PROJECT

REMOVAL OF TOP SOIL

EXCAVATION AND SORTING OF MINERAL

LOADING ON DUMPERS FOR FINAL DISPATCH

BACKFILLING OF TOP SOIL/OB

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 10

Layout of Mining Benches

The layout/orientation of the mining benches depends mainly on:

i. Method of working;

ii. Topography of the area;

iii. Degree of variations in grade within the deposit;

iv. Degree of intercalations in the deposit;

v. Required output of r.o.m material per day; and

vi. Degree of pit blending required for quality control.

Taking the above factors into considerations, it is proposed to advance the mining

faces generally from east to west. The benches are planned to be laid accordingly.

Further it has been planned to leave a barrier all around the periphery of

adequate width as required under relevant mining laws and other statutory

provisions to prevent boulders rolling down or Surface runoff spilling into the hill

slope. A green belt is to be created on the barrier.

Bench Height

At kutrumali, the bench height in a 10 m slice may vary from place to place

depending upon topography, as well as varying thickness of overburden and ore.

The benches are proposed to be planned generally to follow the contour and

topography without much loss on dilution.

Accordingly, the overburden having varying thickness, maximum being about 9 m

in Area-1, will be removed ahead of bauxite excavation. The bulk of the bauxite

will be mined at 10 m bench height while benches of 5m height will be developed

in places. However, some of the benches, for both bauxite and overburden, will be

less than 5m height and will be exploited by ripping. Bauxite of 2m to 4m

thickness occurring immediately.

Overall Pit Slope

A steep overall pit slope is expected to be stable with 10 m bench height.

However, to assess this aspect more precisely, certain additional information such

as angle of friction and coefficient of cohesiveness of the rock are required which

are not presently available. It is, therefore planned to maintain the overall pit

slope at 45 degree.

Mine Drainage

The kutrumali plateau has almost a flat topography except at the western part

where the khondalite is exposed. The natural drainage, generally in the southeast

direction, drains the surface run-off into valleys which ultimately converges with

the main water courses.

During the initial years of mine operation, top soil and overburden excavated shall

be dumped at the selected sites. Peripheral drains all around the dumps shall be

made to trap rain water washing out of the dumps, which in turn will reduce the

load of suspended solids in the discharged waster. Sump pits will be provided

along the length of the drains for effective trapping of rain water washings and

discharging the clear overflow water to the nearby streams.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 11

It is observed that ground water level at kutrumali region generally lies between

800 to 900 m above MSL which in words about 300 m below the plateau top.

Further, during drilling operation in kutrumali plateau, no sub-surface water to be

encountered to a level up to 1000 m above MSL. Hence, the effect of mining on

ground water is extremely remote.

Crushing Plant

The ore being of high grade, any preliminary treatment/beneficiation is not

envisaged at the mine head. However, to enable smooth and easy transportation,

the minus 800 mm r.o.m. bauxite will be required to be reduced to a suitable size

prior to delivering the same to the long distance transportation system. Crushing

plant and conveyor system to process and transfer 3 million tonnes of bauxite per

year as required by the alumina plant.

The crushing plant will consist of four sections namely:

i) R.O.M ore stockyard;

ii) Crushing section;

iii) Belt conveyor system; and

iv) Surge bin.

R.O.M Ore Stockyard

The ore transported from the mine may be dumped directly into the crusher or to

the stockpile depending upon the grade of bauxite and the requirement of the

crushing plant. Subsequently bauxite from the stockpile may be reclaimed in

appropriate proportions conforming to the stipulated blending requirement and

dumped into the crusher hopper.

Crushing Section

Receiving Hopper

One r.c.c. hopper will be provided at the crusher house to receive the ore directly

transported from the mine and dumped by 35 ton rear dump trucks. Ore

reclaimed from the r.o.m stockpile by front end loader and hauled by 35 ton rear

dump trucks will also be received in this hopper. The rear dump trucks will

approach the hopper though a ramp. The hopper will be of about 100 tons

capacity and fitted with MS grid on top to arrest stray plus 800 mm boulders. The

oversize boulders will be removed from the top of the hopper, fragmented with

the help of a hydraulic rock breaker provided for the purpose, and recharged into

the hopper from time to time.

Apron Feeder

The hopper will be equipped with a heavy duty apron feeder of 2000 mm x 7500

mm size suitable to withstand the load of big boulders dumped by 35 ton rear

dump trucks from large tipping height. The apron feeder will be driven by

thyristor controlled variable speed D.C. motor, and draw out and deliver the

material at a regulated rate to a set of stationary drizzly.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 12

Stationary Grizzly

A set of stationary grizzly of robust construction and 2000 mm x 4000 mm size,

having wedge shaped opening tapering out towards the discharge end, will be

installed ahead of the crusher for scalping out as much minus 150 mm fraction as

possible from the r.o.m material to avoid unnecessary volumetric loading of the

crusher.

Crusher

Oversize of the grizzly will be fed directly to a crusher to reduce the same to

minus 150 mm. considering the size and other, physical characteristics of the feed

ore, throughput rate and the stipulated product size, it is proposed to provide a

toothed double roll crusher of 1700 mm dia x 2000 mm width. Each of the rolls

will have separate squirrel cage induction motor drive, and will run at different

speeds to ensure efficient crushing by the process of compaction and shearing.

Belt Conveyor System

A belt conveyor system will be provided to collect the minus 150 mm crushed

material and the scalped product, and transfer the same to the surge bin, located

near the long distance bauxite transport conveyor system. Each of these

conveyors will be 1000 mm wide operating at a speed of about 2 m per second,

and will be laid over a fairly level land avoiding the promising mining areas to the

extent possible.

Surge Bin

A surge bin complex will be provided to collect the minus 150 mm material and

feed the same at an uniform rate to the long distance transport system.

Bin Compartment

The surge bin will be of r.c.c. construction and have 2 compartments, each of 500

ton capacity. The crushed material of kutrumali mine will be delivered in one

compartment. The other compartment will be used for crushed material conveyed

from Sijimali at a later date. The bin will be enable to even out any fluctuation in

the feed rate of the incoming material and maintain a uniform rate of loading of

the long distance transport system throughout the period of its operation.

Apron Feeder

An apron feeder, 1500 mm x 6000 mm will be provided below each of the

compartments of the bin for drawing out and delivery of the material.

Belt Conveyor

A belt conveyor, 1000 mm wide and operating at about 2 m per sec, will collect

the material discharged by the apron feeder and transfer the same to the long

distance bauxite transport system. The capacity of this conveyor will be

augmented by suitably speeding it up, to match the envisaged transfer rate of

2000 tons per hour after commissioning of Sijimali mine.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 13

Other Facilities

Other facilities envisaged to be provided for smooth functioning of the sizing plant

are briefly described below:

Crane and Hoist

The crusher house will be equipped with a 20/5 ton capacity E.O.T crane for

maintenance and upkeep of equipment there. The crane will also be used to

handle and remove the oversize boulders arrested by the MS grid fitted on top of

the receiving hopper. Besides the crane, mechanical traveling hoists of

appropriate capacity will be provided in the conveyor junction houses and the

surge bin.

Belt Scale

An electronic belt weight will be provided on belt conveyor to record and indicate

the rate of transfer of material.

Metal Detector and Magnetic Separator

A metal detector consisting of a search coil and a solid state control unit will be

provided on belt conveyor to facilitate detection and removal of tramp metal

pieces from bauxite being despatched to the alumina plant. The search coil

mounted on the conveyor senses the presence of any unwarranted metal piece in

bauxite, and through the control unit, activities an overband magnetic separator

which in turn ejects the piece from the system. In the event of failure of the

ejection device, a second metal detector installed further downstream will actuate

the trip circuit of the conveyor drive to facilitate manual removal of the metal

piece.

Automatic Sampler

A cutter type automatic primary sampler will be mounted at the discharge end of

belt conveyor for collection of representative samples at predetermined intervals

as required for monitoring of quality of despatchable bauxite. Along with sample

collector, facilities for preparation of samples consisting of two stage crushing,

handling and secondary sampling will be provided.

Dust Abatement Facilities

To combat dust nuisance caused by crushing, screening, transfer through chutes

etc, it is proposed to provide appropriate dust extraction facilities comprising

multiple collection hoods and ducting, bag filter, stack/exhaust duct in crusher

hoods and ducting, bag filter, stack/exhaust duct in crusher house, surge bin and

junction houses. The dust extraction system will be designed to limit the dust

content in the buildings to 5 mg per Nm3 for breathable fraction and that in the

stack discharge to 50 mg per Nm3. The dust arrested in the bag filters will be

recharged to the belt conveyors.

Besides the dust extraction system, water will be sprinkled at the receiving

hopper through appropriate header, pipeline and sprinklers to control generation

of dust.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 14

3.6 Raw materials required along with estimated quantity, likely source,

marketing area of final products/s, Mode of transport of raw Material and

Finished Product.

No raw material will be required for production of Bauxite.

Use of Mineral

The bauxite from Kutrumali deposit will be used for production of metallurgical

grade alumina. The proposed alumina plant will be located at a distance of around

9 km in East direction from this bauxite deposit.

Bauxite Transportation

The bauxite raised from Kutrumali mine will be used for production of

metallurgical grade alumina at the plant proposed to be installed by L&T located

at about 9 km away from this deposit. The bauxite will, therefore, have to be

transported to the proposed alumina plant. After considering various options, it

has been decided to provide a belt conveyor system for the purpose. The belt

conveyor will be of either steel chord supported or conventional idler supported

type, or any other state of the art type, laid on generally on a declining ground

slope.

The drive house for the conveyor system will be located on the feed end at

Kutrumali plateau top and conveyor will receive bauxite feed from the surge bin

via apron feeder. However, most of the conveyor system will be installed outside

the Kutrumali ML area and its alignment will be generally follow the gorge of a

stream to terminate at the proposed plant site. The access road between

Kutrumali the alumina plant site is planned to be laid as close to the conveyor

installation as possible to facilitate its regular inspection, upkeep and

maintenance.

3.7 Resource optimization/recycling and reuse envisaged in the project, if

any, should be briefly outlined.

Water will be accumulated in the excavated mined out pit area during rains and

the pits shall serve as natural ground water recharging structure. As a result of

extraction of mineral, the rate of charging of ground water is likely to be

increased considerably.

3.8 Availability of water its source, Energy/power requirement and source

should be given

Water Source and Requirement

It is proposed to tap water from Naragul nala at an approximate distance of 3.5

km from Kutrumali hilltop.

Water will be required in the mining area for sprinkling on the roads to suppress

the dust, watering of green belt/green verge and trees planted to comply with

requisite EMP measures, miscellaneous industrial use, and drinking and sanitation.

The water requirements, source of water and distribution system envisaged for

Kutrumali are briefly discussed below:

For the purpose of design of water system, projected water requirement for

Kutrumali is given below Table-7:

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 15

TABLE-7

WATER REQUIREMENT

Consumer Requirement of Water (m3/day)

Mine road sprinkling 250

Provision for vegetation 50

Industrial use 125

Drinking and sanitation 75

Total 500

Power requirement

The requirement of power for crushing plant, bauxite transport conveyor, service

centre, water supply units, mine and plant lighting and other miscellaneous

consumers has been estimated as follows:

Annual energy consumption, 16.5 x 106 kwh

15 min maximum demand, 4.0 MVA

Source of Power

It has been envisaged that power will be made available at the main receiving and

step-down substation (MRSS) of the proposed alumina plant by Odisha State

Electricity Board (OSEB) over 132 KV double circuit overhead line from Theruvali

substation. Power will be stepped down to 33 KV at the MRSS. It is also planned

to establish one in-house captive power at Alumina Refinery plant based on co-

generation system to meet the power demand. The in-plant power generation will

be connected to the 33 KV system.

33 KV power will be taken to Kutrumali mine over double circuit overhead line

from the 33 KV substation of the alumina plant. Further 33 KV power to Sijimali

mine will be taken over double circuit overhead line from the 33 KV substation at

Kutrumali. The 33 KV overhead line will generally follow the bauxite transport

conveyor alley.

Requirement of the construction power will be met from the DG sets.

It is also envisaged to install solar panels to produce green energy and fulfil part

of the requirement.

3.9 Stacking of Mineral and Disposal of Waste

Opencast working: taking into consideration factors, such as nature of occurrence,

geological setting of the deposit, topography, scale of operation, ore to waste

ratio etc., it is proposed to adopt opencast mechanised mining by top slicing

method in multiple benches. Proposed five year production details are shown in

the Table-8.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 16

TABLE-8

YEAR WISE PRODUCTION OF MINERALS

3.10 Schematic representations of the feasibility drawing which give

information of EIA purpose

As per the Environment Impact Assessment (EIA) notification dated 14th Sept.

2006 and subsequent amendments, the proposal falls under category A. EIA/EMP

report shall be prepared to get the Environmental Clearance for this project from

the MoEF&CC. The baseline studies will be undertaken as per schematic diagram

given as Figure-2.

Plan Year Waste

(000’ Tonnes)

Bauxite

(000’ Tonnes)

Top soil Laterite Khondalite Total

First year 99 388 213 700 200

Second year 31 769 - 800 250

Third year 21 813 166 1000 2400

Fourth year 40 1049 111 1200 3000

Fifth year - 1200 - 1200 3000

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 17

FIGURE-2

CLEARANCE PROCESS FOR CATEGORY-A PROJECT

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 18

4.0 SITE ANALYSIS

4.1 Connectivity

Kutrumali Bauxite deposit is located in Thuamul-Rampur, Kashipur and Rayagada

sub-divisions in Kalahandi-Rayagada district. The bauxite deposit is located at a

distance of about 34 km from Rayagada town. Rayagada is the district

headquarter and is connected by SE railway.

The state highway connects Sunger with Rayagada via Kashipur, the sub-

divisional head quarter. From Sunger, the deposit is approachable by 11 km long

fair weather village road, followed by a 4 km kutcha road from the foothill to the

plateau top. The total road distance from Kutrumali hilltop to Rayagada is

approximately 97 km.

4.2 Land Form, Land Use and Land Ownership

The abstract of the details of land schedule and landuse is given in Table-9.

TABLE-9

MINING LEASE AREA BREAKUP AND LAND USE DETAILS

* All values are in ha

District

Name of

the

Village

Govt. Land

Private Total Village

Forest

DLC

Forest

Proposed

RF

Other

than

Forest

Kalahandi

Kutrumali 7.58 - - 165.12 13.66 186.36

Majhigan - - - 67.51 - 67.51

Melrapa - - - 52.56 - 52.56

Murlimuhin - - - 12.96 - 12.96

Podapai - 1.62 - 184.12 5.03 190.77

Salabali - - - 0.66 - 0.66

Mohangiri

Proposed

Reserve

Forest

- - 43.09 - 43.09

Rayagada

Pedalgura - - 86.73 - 86.73

Alutunga 5.03 - - 37.15 3.24 45.42

Sadalasa - - - 10.64 - 10.64

Total 12.61 1.62 43.09 617.45 21.93 696.73

It may be seen from the above table that the bulk of area is non-forest

government land. The total forest land covers about 8.22% of the ML area is

forest land (forest land- 14.23 ha [village forest – 12.61 ha & DLC forest – 1.62

ha], proposed reserved forest- 43.09 ha).

4.3 Topography

The area forms a part of the Eastern Ghat hill ranges which have a general NE-SW

trend. Series of hills ranging in an elevation between 1000 m and 1400 m have

been interspersed with valleys having an average elevation of 850 m and are

dotted with several isolated hillocks.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 19

The main drainage pattern in this area is controlled by a number of streams,

which drains their water into Nagavalli River that flows from north to south. The

Barha Nadi, a tributary of Nagavalli River, flow along northeast direction on the

northern side of the Kutrumali plateau. The streams originating from the northern

part of the plateau drains the water into Barha Nadi. No streams are passing

through proposed ML area.

4.4 Existing Land use Pattern

The prevailing land use pattern in the study area has been divided into two

distinct zones, namely (i) the core zone covering an area about 7.0 sq.km over

the Kutrumali plateau top where the mining activities will be confined and (ii) the

buffer zone covering a total land area of 720 sq.km (exceeding 10 km radial

coverage).

Core Zone Land Use /Land Cover

The proposed mining site at Kutrumali plateau is principally a stony waste land.

However, there are patches of tree cover at the edge of plateau. The broad

distribution of the prevailing landuse/landcover in the core zone of the study area

as observed is presented in below Table-10.

TABLE-10

LANDUSE / LANDCOVER OF CORE ZONE

Sr. No. Land Use / Land Cover Unit Area (ha)

1 Village Forest 12.61

2 DLC Forest 1.62

3 Proposed RF 43.09

4 Scrub Land 83.29

5 Agricultural Land 0.00

6 Residential Land 2.61

7 Stony Waste Land 553.51

8 Roads / Corridors 0.00

9 Water Bodies 0.00

Total 696.73

Note: However, as per legal status, 43.09 ha of land area in northern sector of

plateau falls under Mohangiri proposed reserve forest. This area accounts for

total plateau land surface.

Buffer Zone Land Use/Land Cover

The buffer zone area has got substantial forest coverage of varying canopy

density. This is one way beneficial to the proposed project. The vast forest

coverage provides substantial ecological resources which are not being affected by

the present project activities. In the buffer zone, five major forest types are

recognised in Rayagada and Kalahandi forest divisions. The details of forests are

given in Table-11.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 20

TABLE-11

LIST OF MAJOR FORESTS IN BUFFER ZONE

Sr. No. Name of Reserve/

Protected Forest

Forest Type Distance/

Direction

1 Sunger PRF Moist deciduous with scattered

evergreen patches

7.1 km / W

2 Mandibishi RF Moist deciduous with frequent

evergreen patches around

village settlement with rampant

podu cultivation

2.3 km / S

3 Bijayanagar PRF Dry and noist deciduous forest

rampant podu cultivation, severe

timber extraction

2.8 km / NE

4 Leliguma RF Moist deciduous and evergreen 15.2 km / S

5 Mohangiri PRF Dry deciduous forest with

extensive podu cultivation open

and degraded forest

5.8 km / N

There are no Ecological Sensitive Areas (Wild life Sanctuaries, Tiger reserves,

elephant reserves, National Parks and Biosphere Reserves etc.) present in the

study area.

4.5 Existing Infrastructure

Access roads:

The access roads to the nearby villages and to Kutrumali plateau from Sunger are

not metalled roads but jeepable throughout the year except during the period

from June to October covering monsoon and part of post-monsoon period.

Water:

Villages tap the water mostly from the natural springs and the nallahs and use it

in untreated form. Few hand tubewells have been set up in the study area.

Dugwells are also available in the valley land.

Electricity:

Electric poles have been laid under Rural Electrification Programme. Power will be

made available to some of the villages when the transformers are installed.

Education facilities:

Limited number of schools up to primary level are available in the valley area.

Health care:

Primary health care center is available in Sunger village.

Fuels:

The fuels used by the villagers are forest wood and kerosene.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 21

Trade and Commerce Centre:

Kashipur is the sub-divisional headquarters located at a distance of 13.1 km from

Kutrumali ML area in SW direction. Basic infrastructural facilities like all-weather

road to the District headquarters Rayagada, electricity, schools, post office, STD

facilities, bank and police station are available at Kashipur, the main trade

commerce centre for almost all the villages in the study area.

Monuments/Buildings of Archaeological Significances:

There is as such no monument or public buildings of interest in the study area as

observed during field study.

4.6 Soil Classification

Top soil is yellowish brown to dark reddish brown and developed from the

tropical/subtropical weathering of khondalite and laterite residuum.

4.7 Climate data from Secondary Sources

The study area lies in the humid tropical climatic zone and receives the annual

precipitation in the range of 1400 to 1600 mm. Nearly 80 per cent of this rainfall

occurs during the period June to September. India Meteorological Departments

(IMD) nearest observatory at Koraput reports maximum temperature at 37.3°C

during summer and minimum temperature at 7.1° C during winter season. The

wind speeds lies within 11 kmph having predominant wind direction from

southwest (SW) to northwest (NW). The relative humidity lies in the range of 50

% to 80 % depending on the seasons.

In general, the climate in the study area is temperate type and there is a good

amount of rain during June to August which sustains the vegetation cover on the

hill slopes.

4.8 Social Infrastructure Available

Access roads:

The access roads to the nearby villages and to Kutrumali plateau from Sunger are

not metalled roads but jeepable throughout the year except during the period

from June to October covering monsoon and part of post-monsoon period.

Water:

Villages tap the water mostly from the natural springs and the nallahs and use it

in untreated form. Few hand tubewells have been set up in the study area.

Dugwells are also available in the valley land.

Electricity:

Electric poles have been laid under Rural Electrification Programme. Power will be

made available to some of the villages when the transformers are installed.

Education facilities:

Limited number of schools up to primary level are available in the valley area.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 22

Health care:

Primary health care center is available in Sunger village.

Fuels:

The fuels used by the villagers are forest wood and kerosene.

Trade and Commerce centre:

Kashipur is the sub-divisional headquarters located at a distance of 13.1 km from

Kutrumali ML area in SW direction. Basic infrastructural facilities like all-weather

road to the District headquarters Rayagada, electricity, schools, post office, STD

facilities, bank and police station are available at Kashipur, the main trade

commerce centre for almost all the villages in the study area.

Monuments/Buildings of archaeological significances:

There is as such no monument or public buildings of interest in the study area as

observed during field study.

5.0 PLANNING BRIEF

5.1 Planning concept (type of industries, facilities, transportation etc.) Town

and country Planning/Development authority Classification

The bauxite mining project of M/s Larsen & Toubro Limited, Mumbai is located at

Villages- Kutrumali, Podapai, Majhigaon, Murlimuhin, Melrapa, Salabali villages

and Mohangiri Reserve Forest (Proposed) under Thuamal Rampur Tehsil of

Kalahandi District; Padelgura, Alutunga under Kashipur Tehsil and Sadalasa under

Rayagada Tehsil of Rayagada District , District- Kalahandi & Rayagada, State-

Odisha over an area of 696.734 ha (1721.680 acre). The proposed capacity of

the project is 3.0 MTPA. The bulk of Mine Lease area is non-forest government

land. Open-cast mechanized mining method without blasting is proposed for this

project

5.2 Population Projections

The project will employ most of the workers from nearby villages. Only

supervisory staff will be hired from outside. There will not be any increase in

population due to the project. However, few people from other areas may migrate

in this area for business opportunities. Village wise population of the core zone is

given in Table-12.

TABLE -12

VILLAGE WISE POPULATION

District Village Population

Kalahandi Kutrumali 250

Podapai 207

Majhigaon 382

Murlimoi 158

Melrupa 264

Salabali 20

Mohanagiri 1467

Rayagada Alutunga 68

Pedalguda 38

sadalasa 187

Source: Census Handbook, 2011

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 23

The above villages partly/fully fall within the proposed ML area. The actual

project affected people are 377 from 105 families out of the above.

5.3 Land Use planning (breakup along with green belt etc.)

Land Reclamation - Concomitant to Mining

During the course of mining, the original topography will be disturbed. It becomes

necessary to reclaim the degraded land so as to bring back to its approximate

original topography. It is planned to remove the top soil first and to dump at the

selected sites. Removal of the overburden and waste material would follow

thereafter and suitably dumped at the selected sites. During the operation of the

mining, concomitant reclamation of the land during the first five years may not be

possible because:

i) Opening of the different benches at different levels simultaneously for

achieving the desired tonnage and grade;

ii) Irregular and heterogeneous nature of the bauxite and non-exposure of

bottom profile of mineralization; and

iii) Unfavourable topography limiting the total backfilling of the mined out

areas.

Hence, it has been decided to take up the restoration of the degraded land in the

western block after exploitation of the bauxite. The restoration will cover

backfilling and terracing of the mined out area with overburden /waste and

surfacing the same with topsoil. The fast growing trees like Auriculiformis (Sona

Jhuri), Cassia Siamea (Chakunda), Albizzia Lebbek (Siris), Leucaena Leucocephala

(Suo Babul), Bombax Malabaricum (Simul), Butea Frondosa (Palas) and shrubs

will be planted to stabilise the reclaimed land. Landuse pattern of project area is

given in Table-13. The year wise plantation programme as proposed, is

presented in Table-14.

TABLE-13

LANDUSE PATTERN

Sr. No Particular Area (in ha)

1 Mining area 128.65

2 Over Burden Dump 24.51

3 Storage for Top Soil 9.34

4 Roads/ Connectivity 36.73

5 Infrastructure, like- Crusher house,

Belt conveyor etc. 68.13

6 General Administrative office

/Repair Shop 3.27

7 Greenbelt 201.57

8 Undisturbed land 224.53

Total Area 696.73

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 24

TABLE-14

PROPOSED YEARWISE PLANTATION PROGRAMME

Period Item Area, Ha No. of

Trees

Cost Rs

‘000

1st and 2nd

Year

Peripheral plantation

Nursery development

Tree plantation

9.9

2.0

10.0

25,000

-

25,000

145

40

145

3rd Year Tree plantation

Nursery development

Green belt development

25.0

4.0

15.0

62,500

-

16,500

360

80

150

4th Year Tree plantation

Green belt development

Arbori culture

Office garden

15.0

18.3

5 km

4.6

37,500

20,300

6,000

-

215

180

100

410

5th Year Tree plantation

Green belt development

Arbori culture

Land scape garden

Overburden dump

vegetation

15.0

22.0

3.8

5.1

10.6

37,500

35,500

-

-

26,500

215

220

180

460

150

5th to 10th

Year

Tree plantation

Overburden dump

vegetation

Green belt development

23.7

13.2

50.2

59,000

33,000

550,000

340

190

502

10th to 15th

Year

Post mining land

development in western

block (Part)

89.0 222,500 1290

15th to 20th

Year

Post mining development

in the Eastern Block

(balance)

44.0 110,000 638

Land Restoration – Post –Mining

Biological Stabilisation

Since the mining operation will degrade the landscape, it will be prudent to plan

and execute the post-mining restoration with an objective to recoup the lost

vegetation, restore the degraded land and impart advantages and benefits which

would not have otherwise been conceived. In European and other countries,

there are numerous examples where the reconstituted landscape has created

benefits with joint efforts of the mining agencies and the Government

authorities.

At the end of the total exploitation of the deposit, about 30 per cent of mine

leasehold land would be degraded due to the mining. It is proposed to reclaim

the degraded land to bring back to it’s approximate original contour by

backfilling and terracing the overburden and waste materials. Most of the land

would be suitable for plantations. It is proposed to plant quick growing trees,

shrubs and creepers taking advantages of the climatic conditions, altitude and

rainfall so that these vegetations cover up the dump quickly and stabilize the

same to prevent soil erosion.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 25

Peripheral drains are to be provided around the dump sites and trees are to be

planted along both the sides of the drains. Local species of the vegetation’s

which attract the fauna like birds, will also be planted. Suitable trees capable of

arresting surface run-off will be planted.

5.4 Assessment of Infrastructure Demand (Physical & Social)

The access roads to the nearby villages and to Kutrumali plateau from Sunger

are not metalled roads but jeepable throughout the year except during the

period from June to October covering monsoon and part of post-monsoon

period. Preference will be given to local labour from nearby villages. Other

requisite infrastructures as transport of mine labours will be made available by

way of jeep and two-wheeler. Medical facility will be available for First Aid and

providing ambulance service at the project site.

5.5 Amenities/Facilities

The service centre will be provided with auxiliary facilities, namely quality

control centre, repair and maintenance shop, stores, training centre, canteen,

ambulance room, transport, communication facilities, the utility supplies, namely

power and water supply systems, and the auxiliary facilities.

6.0 PROPOSED INFRASTRUCTURE

6.1 Industrial Area (Processing Area)

The lease area shall be the processing area for the mining works. No other

industrial area has been proposed in the applied area.

6.2 Residential Area (Non Processing Area)

A separate campus has been provided on the south side of the crushing plant

where the administrative building and site service facilities will be located.

6.3 Greenbelt Development / Afforestation

Greenbelt development: As a part of the eco-restoration programme, it has been

decided to carry out afforestation in the following mine leasehold land:

i) Creation of greenbelt along the periphery of the mining area to take

effective measures for dust suppression and noise baffling, reducing

unpleasant visual impacts and prevention of soil erosion and landslide.

Further it has been planned to leave a barrier all around the periphery of

adequate width as required under relevant mining laws and other statutory

provisions. The vegetation of cover is planned to be created with a mixed

vegetation of quick growing trees and hardy indigenous slow growing trees.

ii) The greenbelt is required to be developed on both sides of the conveyor

gallery, haul roads, junction house, surge bin, r.o.m ore stockyard,

administrative office, service centre, magazine building, etc.

iii) Biological stabilization and protection of old and new waste dumps by

plantations and providing garland drains around these overburden/waste

dump sites. Since the overburden and waste dump would not be utilized

with in the period of five years or so, it is proposed to plant quick growing

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 26

trees, shrubs and creepers to cover up the dump and stabilize the same to

prevent erosion. The afforestation programme as envisaged for 2nd, 3rd, 4th

and 5th year is shown in Annexure-V.

Nursery

For taking up afforestation, road side plantation, garden development etc., it is

essential to develop a small nursery which is proposed to be developed near

administrative building.

Landscape Garden

An area near administrative building which commands the beautiful valley site is

proposed to be developed as landscape garden with lawn and flower beds.

Pisciculture

Some of the pits ranging in depth in between 13 m and 15 m will be utilised to

impound rain water to convert into ponds. These ponds will be utilised for

pisciculture growth and greenbelts will be developed around the pond.

6.4 Social Infrastructure and Benefits

The proposed mining project at Kutrumali will improve their present economic

conditions by having direct and indirect employment opportunity as miners,

skilled/semi – skilled workers, contractor’s labours etc. Thus the project will

have ‘significant beneficial impact on the economic condition and life style of the

local people.

Apart from this the following benefits will accrue to the local people:

- Road facility

- Medical camps

- Social awareness camps

- Secondary employment opportunities

6.5 Connectivity

The access road will be laid alongside the belt conveyor connecting Kutrumali

and Alumina plant site. Besides transportation of machineries for development

and construction, the road will also be used for regular transportation of

employees from township to mine, maintenance a regular surface linkage

between mine and plant.

6.6 Drinking Water Management (Source & Supply of Water)

It is proposed to tap this quantity of water from Naragul nala at an approximate

distance of 3.5 km from Kutrumali hill top. Total requirement of water amounts

to about 500 m3 per day. The project has not envisaged using tube well water

for drinking purpose. However, for drinking purpose the water may be

disinfected through chlorination.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 27

Water supply distribution scheme

To enable tapping of water, it is proposed to construct a weir on the nala and an

intake well on the nala bed upstream of the weir. On the basis of 10 to 12 hours

working hours per day, two pumps (one working and one standby), each 50 cu

m per hour capacity at 500 mwc head will be provided to pump water from the

intake well to a ground water reservoir in the mine.

6.7 Sewerage System

A sewerage system of septic tanks followed by soak pits shall be provided for

the project area.

6.8 Power Requirement, Source/Supply of Power

The requirement of power for crushing plant, bauxite transport conveyor, service

centre, water supply units, mine and plant lighting and other miscellaneous

consumers has been estimated as follows:

Annual energy consumption, 16.5 x106 kwh

15 min maximum demand, 4.0 MVA

Source / Supply of Power

It has been envisaged that power will be made available at the main receiving

and step-down substation (MRSS) of the proposed alumina plant by Odisha state

Electricity Board (OSEB) over 132 KV double circuit overhead line from Theruvali

substation. Power will be stepped down to 33 KV at the MRSS. It is also planned

to establish one in-house captive power at Alumina Refinery plant based on co-

generation system to meet the power demand. The in-plant power generation

will be connected to the 33 KV system.

33 KV power will be taken to Kutrumali mine over double circuit overheat line

from the 33 KV substation of the alumina plant. Further 33 KV power to Sijimali

mine will be taken over double circuit overhead line from the 33 KV substation at

Kutrumali. The 33 KV overhead line will generally follow the bauxite transport

conveyor alley.

It is also envisaged to install solar panels to produce green energy and fulfil part

of the requirement.

6.9 Solid Waste Management

Disposal of Waste/ Overburden

The waste generated in course of pre-mining development and subsequent

mining operation will consist of topsoil and overburden comprising mainly

laterite and low grade unusable bauxite. The rate of generation of

overburden/waste is expected to be of the order of 1.2 million tonnes per year

considering an average ore to waste ratio of about 1:0.4 in the initial years of

operation. However, during first five years of operation including two years of

pre-mining development, the total generation of overburden/waste has been

estimated at about 5 million tonnes, of which top soil is around 1,91,000 tonnes.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 28

It is planned to stack topsoil and overburden separately on ground till some of

the bauxite benches have been worked out and the bottom of bauxite

mineralisation exposed in some of the benches. Two separate locations have

been selected on almost barren and non-promising zones for dumping of top soil

and overburden/waste. One on the lower eastern part marked OB-1 and TS-1

and the other on the lower western part marked OB-2 and TS-2. About 15 ha

and 7.5 ha of land have been provided for OB-1 and OB-2 respectively.

The waste/overburden loosened mostly by ripping would be loaded on rear-

dump truck by front-end loaders for transportation to waste disposal areas.

Overall height of the stacks would be 20 m, each step being 5 m high. The slope

of the individual terraces will be dictated by the angle repose of laterite which,

considering the size of the material, is about 30 degrees. The overall slope will

be maintained at about 15 to 20 degrees, well inside the stipulated limit. The

garland drain around the dumps are proposed to be provided to arrest the finer

particles of the overburden/waste dump as well as the top soil which are

susceptible to rain water washings.

During the commercial production stage, the loosened overburden benches will

be used for back filling of some of the worked out pits, as and when the same

will be available.

7.0 REHABILITATION AND RESETTLEMENT (R&R PLAN)

Odisha Resettlement & Rehabilitation Policy, 2006 (along with its subsequent

amendments) will be followed.

8.0 PROJECT SCHEDULE AND COST ESTIMATES

8.1 Likely date of start of construction and Completion of Project (Time

schedule for the project to be given)

A total time schedule of 30 months have been envisaged from the date of “go

ahead”. Out of the 30 months, 20 months have been provided for land

acquisition & construction of mine access road and 10 months for pre-mining

developmental work.

8.2 Estimated project cost and along with analysis in terms of economic

viability of the project.

TABLE-15

PROJECT COST BREAKUP

Expenditures Cost

(Rs. in Crores)

Land and R&R expenses 80

Mine access road 50

Buildings, Infrastructure & haul roads 10

Plant and Machinery 50

Utilities 10

EMP 25

Total 225

The bauxite mined from this deposit will be used captively at the Alumina

Refinery at Rayagada district.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 29

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION)

This mining project, together with Alumina Refinery Plant, is of utmost

importance to the area/ region for interest of mineral development and shall

greatly contribute to improve the socio-economic conditions of the local

habitants. The operation of the proposed project will bestow various social and

economic benefits to the local communities of the area in addition to providing

better employment opportunities. The mining project shall improve social

infrastructure of the area, apart from increased financial benefits accruing to

State and Central agencies by way of taxes, royalties, DMF, cesses etc.

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 30

ANNEXURE-I

INDEX MAP

Kutrumali

ML Area

KALAHANDI & RAYAGADA

DISTRICTS

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 31

ANNEXURE-II

KHASRA NO’S/ DGPS MAP CERTIFIED BY ORSAC

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 32

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

Alutunga 32 1P Abada Ajogya Anabadi Govt. Land Patharbana 15.33 6.2 15.47 6.26

Alutunga 1 2 Abadi Kamalu Majhi Atta 0.41 0.17 0.43 0.17

Alutunga 23 3 Abadi Lakhi Majhi Atta 1.22 0.49 1.27 0.51

Alutunga 31 4 Sarba Sadharan Govt. Land Rasta 0.21 0.08 0.17 0.07

Alutunga 30 5 Rakhita Govt. Land Gochara 1.45 0.59 1.49 0.6

Alutunga 6 6 Abadi Ningi Majhi &

Others Atta 3.72 1.51 4.00 1.62

Alutunga 9 7 Abadi Patadi Majhi Atta 1.20 0.49 1.22 0.49

Alutunga 9 8 Abadi Patadi Majhi Atta 0.50 0.2 0.53 0.21

Alutunga 22 9 Abadi Rupdhar

Majhi Gharabari 0.02 0.01 0.02 0.01

Alutunga 9 10 Abadi Patadi Majhi Gharabari 0.02 0.01 0.02 0.01

Alutunga 18 11 Abadi Mana Majhi Gharabari 0.02 0.01 0.02 0.01

Alutunga 7 12 Abadi ningi Majhi Gharabari 0.02 0.01 0.02 0.01

Alutunga 5 13 Abadi Dasarathi

Majhi Gharabari 0.02 0.01 0.02 0.01

Alutunga 21 14 Abadi Ranu Majhi Gharabari 0.04 0.02 0.04 0.02

Alutunga 31 15 Sarba Sadharan Govt. Land Rasta 0.16 0.06 0.17 0.07

Alutunga 31 16 Sarba Sadharan Govt. Land debostana 0.01 0 0.00 0

Alutunga 10 17 Abadi Pichulu Majhi Gharabari 0.02 0.01 0.02 0.01

Alutunga 23 18 Abadi Lakhi Majhi Gharabari 0.02 0.01 0.01 0

Alutunga 17 19 Abadi Jama Majhi Gharabari 0.02 0.01 0.01 0

Alutunga 1 20 Abadi Kamalu Majhi Gharabari 0.02 0.01 0.02 0.01

Alutunga 20 21 Abadi Raju Majhi Gharabari 0.02 0.01 0.02 0.01

Alutunga 1 22 Abadi Kamalu Majhi Atta 0.33 0.13 0.35 0.14

Alutunga 30 23P Rakhita Rakhita Gramya jungle

jogyA 12.00 4.86 12.42 5.03

Alutunga 32 24P Abada Ajogya Anabadi Govt. Land Pahada 11.90 4.82 11.79 4.77

Alutunga 32 25P Abada Ajogya Anabadi Govt. Land Pahada 13.25 5.36 13.50 5.46

Alutunga 32 26P Abada Ajogya Anabadi Govt. Land Pahada 0.60 0.24 0.40 0.16

Alutunga 32 34P Abada Ajogya Anabadi Govt. Land Pahada 12.18 4.93 12.07 4.88

Alutunga 32 35P Abada Ajogya Anabadi Govt. Land Pahada 13.58 5.5 13.26 5.37

Alutunga 32 61P Abada Ajogya Anabadi Govt. Land Pahada 1.92 0.78 1.77 0.72

Alutunga 32 131 Abada Ajogya Anabadi Govt. Land Pahada 2.50 1.01 3.59 1.45

Alutunga 32 132 Abada Ajogya Anabadi Govt. Land Pahada 20.60 8.34 18.13 7.34

Total Area 113.31 45.86 112.26 45.43

Kuturumali 41 1 Abada Ajogya Anabadi Govt. Land Donger 39.83 16.12 39.99 16.18

Kuturumali 41 2 Abada Ajogya Anabadi Govt. Land Donger 31.73 12.84 31.56 12.77

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 33

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

Kuturumali 41 3 Abada Ajogya Anabadi Govt. Land Donger 20.50 8.3 20.36 8.24

Kuturumali 41 4 Abada Ajogya Anabadi Govt. Land Donger 31.33 12.68 31.59 12.78

Kuturumali 41 5 Abada Ajogya Anabadi Govt. Land Donger 30.13 12.19 30.14 12.2

Kuturumali 41 6 Abada Ajogya Anabadi Govt. Land Donger 34.05 13.78 34.25 13.86

Kuturumali 41 7 Abada Ajogya Anabadi Govt. Land Donger 20.45 8.28 20.50 8.3

Kuturumali 41 8 Abada Ajogya Anabadi Govt. Land Donger 19.25 7.79 19.52 7.9

Kuturumali 41 9 Abada Ajogya Anabadi Govt. Land Donger 8.25 3.34 8.01 3.24

Kuturumali 39 10 Sarba Sadharan Govt. Land Gramya Rasta 0.08 0.03 0.07 0.03

Kuturumali 32 11 Abadi Lili Majhi Atta 0.58 0.23 0.51 0.21

Kuturumali 6 12 Abadi Dambu Majhi

& Others Atta 4.76 1.93 4.93 2

Kuturumali 40 13 Abada Jogya Anabadi Govt. Land Patita 3.72 1.51 4.09 1.66

Kuturumali 32 14 Abadi Lili Majhi Atta 1.30 0.53 1.66 0.67

Kuturumali 39 15 Sarba Sadharan Govt. Land Smasan 1.68 0.68 1.85 0.75

Kuturumali 40 16 Abada Jogya Anabadi Govt. Land Patita 1.27 0.51 1.16 0.47

Kuturumali 40 17 Abada Jogya Anabadi Govt. Land Patita 0.95 0.38 0.89 0.36

Kuturumali 39 18 Sarba Sadharan Govt. Land Rasta/ Road 0.52 0.21 0.54 0.22

Kuturumali 40 19 Abada Jogya Anabadi Govt. Land Patita 0.83 0.34 0.80 0.32

Kuturumali 19 20 Abadi Magalu Majhi Atta 3.04 1.23 3.08 1.25

Kuturumali 10 21 Abadi Deuju Majhii Atta 0.60 0.24 0.63 0.25

Kuturumali 40 22 Abada Jogya Anabadi Govt. Land Patita 1.38 0.56 1.38 0.56

Kuturumali 39 23 Sarba Sadharan Govt. Land Rasta 0.30 0.12 0.27 0.11

Kuturumali 40 24 Abada Jogya Anabadi Govt. Land Patita 2.46 1 2.55 1.03

Kuturumali 41 25 Abada Ajogya Anabadi Govt. Land Pathar-Chatan 1.50 0.61 1.58 0.64

Kuturumali 38 26 Rakhita Govt. Land Sarbasadharan 0.45 0.18 0.38 0.15

Kuturumali 38 27 Rakhita Govt. Land

Sarbasadharana Jogya(Reserved for Dead body

Place)

0.36 0.15 0.36 0.15

Kuturumali 6 28 Abadi Mangalu

Majhi Mal 0.84 0.34 0.83 0.34

Kuturumali 13 29 Abadi Peradesi &

Others Mala 0.07 0.03 0.07 0.03

Kuturumali 13 30 Abadi Peradesi &

Others Atta 1.52 0.62 1.51 0.61

Kuturumali 6 31 Abadi Mangalu

Majhi Atta 0.06 0.02 0.04 0.02

Kuturumali 13 32 Abadi Peradesi & Atta 0.89 0.36 0.88 0.36

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 34

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

Others

Kuturumali 13 33 Abadi Peradesi &

Others Atta 0.25 0.1 0.20 0.08

Kuturumali 6 34 Abadi Hita Majhi Atta 2.28 0.92 2.33 0.94

Kuturumali 39 35 Sarba Sadharan Govt. Land Bizestali

Debastani 0.04 0.02 0.04 0.02

Kuturumali 39 36 Sarba Sadharan Govt. Land Road 0.36 0.15 0.31 0.13

Kuturumali 6 37 Abadi Hita Majhi Mal 0.11 0.04 0.11 0.04

Kuturumali 40 38 Abada Jogya Anabadi Govt. Land Patita 0.37 0.15 0.30 0.12

Kuturumali 40 39 Abada Jogya Anabadi Govt. Land Patita 0.19 0.08 0.18 0.07

Kuturumali 40 40 Abada Jogya Anabadi Govt. Land Patita 0.11 0.04 0.07 0.03

Kuturumali 24 41 Abadi Mania Majhi Mala 0.11 0.04 0.13 0.05

Kuturumali 10 42 Abadi Deuju Majhii Mala 0.25 0.1 0.25 0.1

Kuturumali 24 43 Abadi Mania Majhi Atta 0.03 0.01 0.04 0.02

Kuturumali 3 44 Abadi Jamu Majhi Atta 1.03 0.42 1.10 0.45

Kuturumali 40 45 Abada Jogya Anabadi Govt. Land Patita 0.17 0.07 0.18 0.07

Kuturumali 40 46 Abada Jogya Anabadi Govt. Land Patita 0.46 0.19 0.44 0.18

Kuturumali 40 47 Abada Jogya Anabadi Govt. Land Patita 0.41 0.17 0.38 0.15

Kuturumali 6 48 Abadi Hita Majhi Atta 0.11 0.04 0.11 0.04

Kuturumali 6 49 Abadi Hita Majhi Atta 0.62 0.25 0.62 0.25

Kuturumali 6 50 Abadi Hita Majhi Atta 0.52 0.21 0.50 0.2

Kuturumali 40 51 Abada Jogya Anabadi Govt. Land Patita 0.12 0.05 0.12 0.05

Kuturumali 40 52 Abada Jogya Anabadi Govt. Land Patita 0.15 0.06 0.12 0.05

Kuturumali 40 53 Abada Jogya Anabadi Govt. Land Patita 0.33 0.13 0.30 0.12

Kuturumali 40 54 Abada Jogya Anabadi Govt. Land Patita 0.15 0.06 0.16 0.06

Kuturumali 40 55 Abada Jogya Anabadi Govt. Land Patita 0.31 0.13 0.31 0.13

Kuturumali 40 56 Abada Jogya Anabadi Govt. Land Patita 0.09 0.04 0.08 0.03

Kuturumali 40 57 Abada Jogya Anabadi Govt. Land Patita 0.09 0.04 0.09 0.04

Kuturumali 40 58 Abada Jogya Anabadi Govt. Land Patita 0.09 0.04 0.07 0.03

Kuturumali 40 59 Abada Jogya Anabadi Govt. Land Patita 0.14 0.06 0.11 0.04

Kuturumali 6 60 Abadi Hita Majhi Atta 0.27 0.11 0.27 0.11

Kuturumali 6 61 Abadi Hita Majhi Atta 0.25 0.1 0.24 0.1

Kuturumali 6 62 Abadi Hita Majhi Atta 0.30 0.12 0.27 0.11

Kuturumali 6 63 Abadi Hita Majhi Atta 0.23 0.09 0.26 0.11

Kuturumali 40 64 Abada Jogya Anabadi Govt. Land Patita 0.10 0.04 0.06 0.02

Kuturumali 40 65 Abada Jogya Anabadi Govt. Land Patita 0.94 0.38 0.93 0.38

Kuturumali 39 66 Sarba Sadharan Govt. Land Road 0.12 0.05 0.15 0.06

Kuturumali 40 67 Abada Jogya Anabadi Govt. Land Patita 0.08 0.03 0.07 0.03

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 35

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

Kuturumali 40 68 Abada Jogya Anabadi Govt. Land Patita 0.57 0.23 0.63 0.25

Kuturumali 39 69 Sarba Sadharan Govt. Land Road 0.10 0.04 0.09 0.04

Kuturumali 39 70 Sarba Sadharan Govt. Land Road 0.03 0.01 0.02 0.01

Kuturumali 6 71 Abadi Hita Majhi Gharabari 0.03 0.01 0.03 0.01

Kuturumali 6 72 Abadi Hita Majhi Gharabari 0.01 0 0.01 0

Kuturumali 6 73 Abadi Hita Majhi Gharabari 0.02 0.01 0.02 0.01

Kuturumali 18 74 Abadi Magada Majhi Gharabari 0.02 0.01 0.02 0.01

Kuturumali 15 75 Abadi Puni Majhi Gharabari 0.02 0.01 0.02 0.01

Kuturumali 6 76 Abadi Hita Majhi Gharabari 0.03 0.01 0.04 0.02

Kuturumali 39 77 Sarba Sadharan Govt. Land Ghar 0.01 0 0.01 0

Kuturumali 39 78 Sarba Sadharan Govt. Land Road 0.03 0.01 0.02 0.01

Kuturumali 39 79 Sarba Sadharan Govt. Land Road 0.02 0.01 0.02 0.01

Kuturumali 10 80 Abadi Deuju Majhii Gharabari 0.01 0 0.01 0

Kuturumali 26 81 Abadi Mahadei

Majhi Gharabari 0.01 0 0.01 0

Kuturumali 28 82 Abadi Rupanga

Majhi Gharabari 0.01 0 0.01 0

Kuturumali 6 83 Abadi Hita Majhi Gharabari 0.02 0.01 0.01 0

Kuturumali 6 84 Abadi Hita Majhi Gharabari 0.02 0.01 0.02 0.01

Kuturumali 12 85 Abadi Pati Majhi

Banji Majhi & Others

Gharabari 0.01 0 0.01 0

Kuturumali 12 86 Abadi Pati Majhi

Banji Majhi & Others

Gharabari 0.02 0.01 0.01 0

Kuturumali 21 87 Abadi Mana Majhi Gharabari 0.02 0.01 0.02 0.01

Kuturumali 35 88 Abadi Sriram Majhi Gharabari 0.02 0.01 0.01 0

Kuturumali 24 89 Abadi Mania Majhi Gharabari 0.02 0.01 0.01 0

Kuturumali 31 90 Abadi Ladu Majhi Gharabari 0.01 0 0.01 0

Kuturumali 27 91 Abadi Ranu majhi Gharabari 0.01 0 0.01 0

Kuturumali 29 92 Abadi Laki Mjhai Gharabari 0.01 0 0.01 0

Kuturumali 37 93 Abadi Suktu Majhi

& Others Gharabari 0.02 0.01 0.02 0.01

Kuturumali 23 94 Abadi Mangudu

Majhi Gharabari 0.02 0.01 0.02 0.01

Kuturumali 39 95 Sarba Sadharan Govt. Land Road 0.14 0.06 0.12 0.05

Kuturumali 39 96 Sarba Sadharan Govt. Land Bizestali

Debastani 0.01 0 0.00 0

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 36

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

Kuturumali 39 97 Sarba Sadharan Govt. Land Road 0.01 0 0.01 0

Kuturumali 25 98 Abadi Mandhanga

Majhi Gharabari 0.02 0.01 0.01 0

Kuturumali 25 99 Abadi Mandhanga

Majhi Gharabari 0.01 0 0.01 0

Kuturumali 39 100 Sarba Sadharan Govt. Land Road/Ghar 0.01 0 0.00 0

Kuturumali 39 101 Sarba Sadharan Govt. Land Road/Ghar 0.01 0 0.01 0

Kuturumali 9 102 Abadi Dulkia Majhi Gharabari 0.01 0 0.00 0

Kuturumali 7 103 Abadi Dahana Majhi Gharabari 0.01 0 0.01 0

Kuturumali 32 104 Abadi Lili Majhi Gharabari 0.02 0.01 0.02 0.01

Kuturumali 34 105 Abadi Singa Majhi Gharabari 0.01 0 0.01 0

Kuturumali 3 106 Abadi Jamu Majhi Gharabari 0.02 0.01 0.03 0.01

Kuturumali 4 107 Abadi Jari Majhi Gharabari 0.02 0.01 0.02 0.01

Kuturumali 14 108 Abadi Pandaru

Majhi Gharabari 0.01 0 0.01 0

Kuturumali 39 109 Sarba Sadharan Govt. Land Road/Ghar 0.01 0 0.01 0

Kuturumali 6 110 Abadi Hita Majhi Ghar 0.01 0 0.01 0

Kuturumali 6 111 Abadi Hita Majhi Gharabari 0.03 0.01 0.02 0.01

Kuturumali 6 112 Abadi Hita Majhi Atta 0.80 0.32 0.65 0.26

Kuturumali 6 113 Abadi Hita Majhi Atta 0.27 0.11 0.28 0.11

Kuturumali 6 114 Abadi Hita Majhi Atta 0.25 0.1 0.25 0.1

Kuturumali 6 115 Abadi Hita Majhi Atta 0.31 0.13 0.32 0.13

Kuturumali 40 116 Abada Jogya Anabadi Govt. Land Patita 0.22 0.09 0.22 0.09

Kuturumali 40 117 Abada Jogya Anabadi Govt. Land Patita 0.09 0.04 0.11 0.04

Kuturumali 40 118 Abada Jogya Anabadi Govt. Land Patita 0.64 0.26 0.68 0.28

Kuturumali 40 119 Abada Jogya Anabadi Govt. Land Patita 0.23 0.09 0.19 0.08

Kuturumali 40 120 Abada Jogya Anabadi Govt. Land Patita 0.30 0.12 0.32 0.13

Kuturumali 6 121 Abadi Hita Majhi Atta 0.21 0.08 0.18 0.07

Kuturumali 6 122 Abadi Hita Majhi Atta 0.20 0.08 0.17 0.07

Kuturumali 40 123 Abada Jogya Anabadi Govt. Land Patita 0.57 0.23 0.55 0.22

Kuturumali 40 124 Abada Jogya Anabadi Govt. Land Patita 0.42 0.17 0.40 0.16

Kuturumali 6 125 Abadi Hita Majhi Atta 0.14 0.06 0.14 0.06

Kuturumali 39 126 Sarba Sadharan Govt. Land Rasta 0.21 0.08 0.49 0.2

Kuturumali 6 127 Abadi Hita Majhi Atta 0.14 0.06 0.26 0.11

Kuturumali 6 128 Abadi Hita Majhi Atta 0.23 0.09 0.38 0.15

Kuturumali 6 129 Abadi Hita Majhi Atta 0.45 0.18 0.45 0.18

Kuturumali 6 130 Abadi Hita Majhi Atta 0.59 0.24 0.54 0.22

Kuturumali 13 131 Abadi Peradesi & Atta 0.50 0.2 0.46 0.19

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 37

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

Others

Kuturumali 6 132 Abadi Hita Majhi Atta 0.42 0.17 0.46 0.19

Kuturumali 38 133 Rakhita Rakhita Gramya jungle

jogyA 0.46 0.19 0.44 0.18

Kuturumali 38 134 Rakhita Rakhita Gramya jungle

jogyA 0.77 0.31 0.77 0.31

Kuturumali 38 135 Rakhita Rakhita Gramya jungle

jogyA 0.24 0.1 0.20 0.08

Kuturumali 38 136 Rakhita Rakhita Gramya jungle

jogyA 0.11 0.04 0.08 0.03

Kuturumali 17 137 Abadi Bhikaram Harijan

Gharabari 0.04 0.02 0.04 0.02

Kuturumali 20 138 Abadi Matiram Harijan

Gharabari 0.04 0.02 0.04 0.02

Kuturumali 15 139 Abadi Puni Majhi Gharabari 0.04 0.02 0.03 0.01

Kuturumali 2 140 Abadi Jaga Majhi Gharabari 0.04 0.02 0.04 0.02

Kuturumali 8 141 Abadi Jugi Majhi Gharabari 0.04 0.02 0.02 0.01

Kuturumali 7 142 Abadi Dahana Majhi Gharabari 0.04 0.02 0.04 0.02

Kuturumali 36 143 Abadi Sriram Majhi

& Others Gharabari 0.04 0.02 0.04 0.02

Kuturumali 33 144 Abadi Singa Majhi Gharabari 0.04 0.02 0.04 0.02

Kuturumali 4 145 Abadi Jari Majhi Gharabari 0.04 0.02 0.04 0.02

Kuturumali 38 146 Rakhita Govt. Land Unnayan Jojana

jogya 0.17 0.07 0.17 0.07

Kuturumali 37 147 Abadi Suktu Majhi

& Others Gharabari 0.04 0.02 0.04 0.02

Kuturumali 29 148 Abadi Laki Mjhai Gharabari 0.04 0.02 0.04 0.02

Kuturumali 27 149 Abadi Ranu majhi Gharabari 0.04 0.02 0.04 0.02

Kuturumali 31 150 Abadi Ladu Majhi Gharabari 0.04 0.02 0.04 0.02

Kuturumali 24 151 Abadi Mania Majhi Gharabari 0.04 0.02 0.03 0.01

Kuturumali 21 152 Abadi Mana Majhi Gharabari 0.04 0.02 0.04 0.02

Kuturumali 16 153 Abadi Banji Majhi Gharabari 0.04 0.02 0.04 0.02

Kuturumali 11 154 Abadi Pati Majhi Gharabari 0.04 0.02 0.03 0.01

Kuturumali 30 155 Abadi Laki Mjhai Gharabari 0.04 0.02 0.03 0.01

Kuturumali 38 156 Rakhita Govt. Land School play

ground 0.26 0.11 0.23 0.09

Kuturumali 38 157 Rakhita Govt. Land School play

ground 0.60 0.24 0.59 0.24

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 38

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

Kuturumali 38 158 Rakhita Govt. Land School play

ground 0.73 0.3 0.67 0.27

Kuturumali 41 159 Abada Ajogya Anabadi Govt. Land Pathar-Chatan 7.20 2.91 6.88 2.78

Kuturumali 3 160 Abadi Jamu Majhi Atta 1.22 0.49 1.16 0.47

Kuturumali 38 161 Rakhita Govt. Land Gochara 0.57 0.23 0.56 0.23

Kuturumali 38 162 Rakhita Govt. Land Gochara 0.70 0.28 0.68 0.28

Kuturumali 38 163 Rakhita Govt. Land Gochara 1.45 0.59 1.48 0.6

Kuturumali 38 164 Rakhita Govt. Land Basti Jogya 0.44 0.18 0.43 0.17

Kuturumali 38 165 Rakhita Govt. Land Basti Jogya 0.03 0.01 0.03 0.01

Kuturumali 39 166 Sarba Sadharan Govt. Land Rasta 0.13 0.05 0.13 0.05

Kuturumali 38 167 Rakhita Govt. Land Basti Jogya 1.70 0.69 1.56 0.63

Kuturumali 39 168 Sarba Sadharan Govt. Land Rasta 0.30 0.12 0.28 0.11

Kuturumali 38 169 Rakhita Govt. Land Basti Jogya 1.05 0.42 1.01 0.41

Kuturumali 40 170 Abada Jogya Anabadi Govt. Land Patita 1.56 0.63 1.53 0.62

Kuturumali 40 171 Abada Jogya Anabadi Govt. Land Patita 0.68 0.28 0.68 0.28

Kuturumali 40 172 Abada Jogya Anabadi Govt. Land Patita 0.23 0.09 0.21 0.08

Kuturumali 40 173 Abada Jogya Anabadi Govt. Land Patita 0.18 0.07 0.16 0.06

Kuturumali 40 174 Abada Jogya Anabadi Govt. Land Patita 0.16 0.06 0.13 0.05

Kuturumali 40 175 Abada Jogya Anabadi Govt. Land Patita 0.14 0.06 0.11 0.04

Kuturumali 40 176 Abada Jogya Anabadi Govt. Land Patita 0.11 0.04 0.12 0.05

Kuturumali 40 177 Abada Jogya Anabadi Govt. Land Patita 2.34 0.95 2.29 0.93

Kuturumali 40 178 Abada Jogya Anabadi Govt. Land Patita 1.66 0.67 2.98 1.21

Kuturumali 40 179 Abada Jogya Anabadi Govt. Land Patita 2.40 0.97 2.42 0.98

Kuturumali 39 180 Sarba Sadharan Govt. Land Rasta 0.19 0.08 0.16 0.06

Kuturumali 38 181 Rakhita Rakhita Gramya jungle

jogyA 1.47 0.59 1.38 0.56

Kuturumali 41 182 Abada Ajogya Anabadi Govt. Land Pathar-Chatan 4.40 1.78 4.41 1.78

Kuturumali 40 183 Abada Jogya Anabadi Govt. Land Patita 9.10 3.68 9.04 3.66

Kuturumali 40 184 Abada Jogya Anabadi Govt. Land Patita 29.33 11.87 29.78 12.05

Kuturumali 5 185 Abadi Damu Majhi Atta 1.90 0.77 2.01 0.81

Kuturumali 40 186 Abada Jogya Anabadi Govt. Land Patita 31.20 12.63 31.58 12.78

Kuturumali 40 187 Abada Jogya Anabadi Govt. Land Patita 2.08 0.84 2.23 0.9

Kuturumali 40 188 Abada Jogya Anabadi Govt. Land Patita 3.28 1.33 3.35 1.36

Kuturumali 22 189 Abadi Makedi Majhi Atta 2.22 0.9 2.36 0.96

Kuturumali 40 190 Abada Jogya Anabadi Govt. Land Patita 4.50 1.82 4.41 1.78

Kuturumali 1 191 Abadi Kamalu Majhi Atta 1.86 0.75 1.96 0.79

Kuturumali 40 192 Abada Jogya Anabadi Govt. Land Patita 26.70 10.81 26.83 10.86

Kuturumali 38 183/193 Rakhita Rakhita Gramya jungle 6.85 2.77 6.57 2.66

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 39

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

jogyA

Kuturumali 38 183/194 Rakhita Rakhita Gramya jungle

jogyA 9.35 3.78 9.29 3.76

Kuturumali 40 184/195 Abada Jogya Anabadi Govt. Land Patita 10.90 4.41 10.68 4.32

Kuturumali 40 137/196 Abada Jogya Anabadi Govt. Land Patita 0.03 0.01 0.01 0

Kuturumali 40 139/197 Abada Jogya Anabadi Govt. Land Patita 0.02 0.01 0.02 0.01

Kuturumali 40 141/198 Abada Jogya Anabadi Govt. Land Patita 0.03 0.01 0.04 0.02

Total Area 458.25 185.45 460.62 186.4

Majhigan 56 394P Abada Ajogya Anabadi Govt. Land Donger 0.15 0.06 0.14 0.06

Majhigan 56 396P Abada Ajogya Anabadi Govt. Land Donger 16.10 6.52 15.94 6.45

Majhigan 56 397P Abada Ajogya Anabadi Govt. Land Donger 16.55 6.7 16.26 6.58

Majhigan 56 398P Abada Ajogya Anabadi Govt. Land Donger 39.80 16.11 39.36 15.93

Majhigan 56 399P Abada Ajogya Anabadi Govt. Land Donger 26.50 10.72 25.72 10.41

Majhigan 56 400 Abada Ajogya Anabadi Govt. Land Donger 16.13 6.53 16.28 6.59

Majhigan 56 401 Abada Ajogya Anabadi Govt. Land Donger 8.65 3.5 8.91 3.61

Majhigan 56 402P Abada Ajogya Anabadi Govt. Land Donger 13.45 5.44 13.75 5.56

Majhigan 56 403P Abada Ajogya Anabadi Govt. Land Donger 4.40 1.78 4.57 1.85

Majhigan 56 434P Abada Ajogya Anabadi Govt. Land Donger 0.09 0.04 0.07 0.03

Majhigan 56 435P Abada Ajogya Anabadi Govt. Land Donger 26.11 10.57 25.79 10.44

Total Area 167.93 67.96 166.80 67.5

Melarapa 38 273P Abada Ajogya Anabadi Govt. Land Donger 15.95 6.45 16.83 6.81

Melarapa 38 274P Abada Ajogya Anabadi Govt. Land Donger 43.00 17.4 42.98 17.39

Melarapa 38 272/282P Abada Ajogya Anabadi Govt. Land Donger 30.50 12.34 32.18 13.02

Melarapa 38 274/283P Abada Ajogya Anabadi Govt. Land Donger 37.25 15.07 37.91 15.34

Total Area 126.70 51.27 129.89 52.56

Murlimuhin 34 1P Abada Ajogya Anabadi Govt. Land Donger 12.68 5.13 12.70 5.14

Murlimuhin 34 2P Abada Ajogya Anabadi Govt. Land Donger 6.50 2.63 7.00 2.83

Murlimuhin 34 3P Abada Ajogya Anabadi Govt. Land Donger 1.00 0.4 1.02 0.41

Murlimuhin 34 33P Abada Ajogya Anabadi Govt. Land Donger 1.59 0.64 1.67 0.68

Murlimuhin 34 34P Abada Ajogya Anabadi Govt. Land Donger 10.31 4.17 9.63 3.9

Total Area 32.08 12.98 32.03 12.96

Padelgura 20 1P Abada Ajogya Anabadi Govt. Land Parbat 15.75 6.37 15.92 6.44

Padelgura 20 2P Abada Ajogya Anabadi Govt. Land Parbat 33.75 13.66 33.13 13.41

Padelgura 20 3P Abada Ajogya Anabadi Govt. Land Parbat 39.99 16.18 39.78 16.1

Padelgura 20 4P Abada Ajogya Anabadi Govt. Land Parbat 36.00 14.57 33.22 13.44

Padelgura 20 5P Abada Ajogya Anabadi Govt. Land Parbat 15.00 6.07 14.68 5.94

Padelgura 20 6P Abada Ajogya Anabadi Govt. Land Parbat 25.30 10.24 25.50 10.32

Padelgura 20 7P Abada Ajogya Anabadi Govt. Land Parbat 20.80 8.42 20.52 8.3

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 40

Village Name

Khata No

RoR Plot No

Class of Land Tenant Name Type of Land

Land Schedule Proposed Area

DGPS Surveyed Area

Area in Acre Area in Hectare

Area in Acre Area in Hectare

Padelgura 20 11P Abada Ajogya Anabadi Govt. Land Parbat 7.20 2.91 7.08 2.87

Padelgura 20 12P Abada Ajogya Anabadi Govt. Land Parbat 21.30 8.62 21.13 8.55

Padelgura 20 13P Abada Ajogya Anabadi Govt. Land Parbat 3.60 1.46 3.36 1.36

Total Area 218.69 88.5 214.32 86.73

Porapai 33 237P Abada Ajogya Anabadi Govt. Land Donger 19.50 7.89 19.12 7.74

Porapai 33 238P Abada Ajogya Anabadi Govt. Land Donger 31.90 12.91 32.74 13.25

Porapai 33 239P Abada Ajogya Anabadi Govt. Land Donger 7.60 3.08 6.91 2.8

Porapai 33 240P Abada Ajogya Anabadi Govt. Land Donger 81.30 32.9 82.64 33.44

Porapai 33 241 Abada Ajogya Anabadi Govt. Land Donger 48.95 19.81 48.89 19.78

Porapai 18 242 Abadi Ranu Kandha

& Others Atta 3.20 1.3 3.18 1.29

Porapai 33 243 Abada Ajogya Anabadi Govt. Land Donger 75.38 30.51 75.78 30.67

Porapai 33 244 Abada Ajogya Anabadi Govt. Land Donger 104.20 42.17 104.47 42.28

Porapai 33 245 Abada Ajogya Anabadi Govt. Land Donger 74.20 30.03 74.07 29.97

Porapai 14 246 Abadi Mana Majhi Atta 0.52 0.21 0.47 0.19

Porapai 30 247 Rakhita Govt. Land Unnati Jojana

Jogya 0.44 0.18 0.32 0.13

Porapai 30 248 Rakhita Rakhita Gramya Jungle 4.00 1.62 4.00 1.62

Porapai 18 249 Abadi Ranu Kandha

& Others Atta 1.53 0.62 1.48 0.6

Porapai 31 250 Sarba Sadharan Govt. Land Rasta 0.76 0.31 0.79 0.32

Porapai 18 251 Abadi Ranu Kandha

& Others Atta 4.56 1.85 4.39 1.78

Porapai 12 252 Abadi Basu Majhi Atta 2.90 1.17 2.88 1.17

Porapai 32 253 Abada Jogya Anabadi Govt. Land Patita 6.52 2.64 6.67 2.7

Porapai 30 248/254 Rakhita Govt. Land Gochara 2.55 1.03 2.58 1.04

Total Area 470.01 190.21 471.37 190.76

Sadalasa Unsurveyed

Donger 26.25 10.62 26.28 10.64

Salabali 15 57P Abada Jogya Anabadi Govt. Land Donger 1.40 0.57 1.64 0.66

Reserve Forest(Proposed) 112.00 45.33 106.48 43.09

Grand Total Area 1726.62 698.754 1721.68 696.734

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 41

ANNEXURE-III

STUDY AREA MAP

Corner Latitude Longitude

A 19° 27’ 48.25” N 83° 10’ 11.47” E

B 19° 29’ 6.12” N 83° 12’ 49.41” E

C 19° 26’ 33.88” N 83° 13’ 7.87” E

D 19° 25’ 50.28” N 83° 12’ 55.32” E

E 19° 26’ 49.64” N 83° 10’ 59.35” E

A

C

D

E

B

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 42

ANNEXURE-IV

MINE GENERAL LAYOUT

N

6500

N

6500

E 5000

E 4500

E 4100

E 3500

E 3000

E 2500

E 2000

E 1500

E 1000

E 500

N

7000

N

7500

N

8000

N

8500

N

9000

N

9500

N

10000

N

10500

N 1

1000

N 1

1500

N 1

2000

E 5500

E 6000

E 6500

1045

800

850

900

950

1000

950

900

850

800

900

950

1000

1050

1040

1000

1050

1060

1050

900

850

950

1000

1000

1080

1090

1100

1110

1050

1120

1130

1140

1050

1060

1150

900

1200

1000

1050

1100

1110

1020

1030

1040

1050

1000

950

950

900

950

1000

1130

1131

1120

1110

1120

1150

1160

1170

1180

1190

1200

1224

1220

1210

1200

1190

1180

1170

1160

1140

1120

1110

1100

1090

1080

1060

1000

1050

1070

1000

900

800

1040

950

1040950

900

850

800

850950

900

1000

1050

1040

1040

1050

900

950

950

1030

1030

1040

1040

1040

950

1000

1000

950

850

900

850

800

900

850

850

900

950

950

900

850

800

750

700

1150

950

1000

1000

950

1040

1030

750

850

900

950

1030

1050

1000

1040

1050

1000

1060

1040

1050

0B -2

3

PERIPHERAL DRAIN

PERIPHERAL DRAIN

K-25

44

KUTRUMALI

DISTRICT BOUNDARY

3

0.B-1

K-22

T . S -1K-24K-21

K-23

20

DISTRICT BOUNDARY

B L O

C

K

W E S T E R N

M.L. BOUNDARY

1

K-14K-1

22

26

26

4

T.S-2

K-19

K-18K-16

A R E A -2

K-17K-15K-2

K-3

A R E A -1

K-13

18

K-4

6

1917

K-20

57

K-5K-12

8

109

E A

S

T

E

R

N

B

L

O

C

K

K-7

5

1125

21

K-8

2

12

13

15

14

K-9

16

K-10

23

TO

ALU

MIN

A P

LAN

T

DISTRICT BOUNDARY

K-6

LELINGAPADAR

K-26

K-27

Z

Z3

24

K-28 K-30

K-29 K-31

K-32

K-33

K-34 K-35

23 GATE HOUSE

22 GROUND WATER RESERVOIR

21 RECEIVING AND STEPDOWN SUB-STATION

20 FUEL FILLING STATION

19 SERVICE CENTRE

18 ADMINISTRATIVE OFICE

17 SPACE FOR R.O.M ORE STOCKYARD

16 BELT CONVEYOR FOR BAUXITE TRANSPORT TO

15 CONEYOR DRIVE HOUSE

14 JUNCTION HOUSE -2

13 BELT CONVEYOR, BC -3

12 SURGE BIN

11 BELT CONVEYOR, BC -2

10 SAMPLE PREPARATION UNIT

9 JUNCTION HOUSE -1

8 BELT CONVEYOR, BC - 1

7 CRUSHER HOUSE

6 APPROACH RAMP TO CRUSHER HOUSE

5 ROADS FOR HAULGE AND ACCESS TO VARIOUS

4 TOPSOIL DUMP

3 OVERBURDEN / WASTE DUMP

2 MINING ZONE - EASTERN BLOCK

1 MINING ZONE - WESTERN BLOCK

INSTALLATIONS

ALUMINA PLANT

L E G E N D

100 0 200 400 meters

M.L. BOUNDARY

DISTRICT BOUNDARY

For:LARSEN & TOUBRO LIMITED

MUMBAI

DEVELOPMENT OF BAUXITE DEPOSITAT KUTRUMALI

MINING PLAN

MINE GENERAL LAYOUT

10352-K-4-6

SCALE

24 BAUXITE BEARING AREA

(BAUXITE THICKMESS<5M

STRIPPING RATIO>1)

25 BENCH MARK

NOTE:

FOR CONTOUR LINE UPTO 500 METERS BEYOND M.L BOUNDARY

LINES REFER TOPOGAPHICAL SHEET NO. 65/M/3/NE,

ENLARGED TO SCALE 1 : 10 000

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 43

ANNEXURE-V

AFFORESTATION / GREENBELT DEVELOPMENT

1120

1125

1130

1100

1075

1025

1025

10501055

1050

1075

1060

1050

1040

1050

1045

1020

1050

1025

1040

1035

1025

1025

1025

1040

1040

1030

10001000

1000

1100

1200

1175

1150

N6000

N5000

N4000

N3000

N2000

N1000

N0

E12000

E11000

E10000

E9000

E8000

23 GATE HOUSE

22 GROUND WATER RESERVOIR

21 RECEIVING AND STEPDOWN SUB-STATION

20 FUEL FILLING STATION

19 SERVICE CENTRE

18 ADMINISTRATIVE OFICE

17 SPACE FOR R.O.M ORE STOCKYARD

16 BELT CONVEYOR FOR BAUXITE TRANSPORT TO

15 CONEYOR DRIVE HOUSE

14 JUNCTION HOUSE -2

13 BELT CONVEYOR, BC -3

12 SURGE BIN

11 BELT CONVEYOR, BC -2

10 SAMPLE PREPARATION UNIT

9 JUNCTION HOUSE -1

8 BELT CONVEYOR, BC - 1

7 CRUSHER HOUSE

6 APPROACH RAMP TO CRUSHER HOUSE

5 ROADS FOR HAULGE AND ACCESS TO VARIOUS

4 TOPSOIL DUMP

3 OVERBURDEN / WASTE DUMP

2 MINING ZONE - EASTERN BLOCK

1 MINING ZONE - WESTERN BLOCK

INSTALLATIONS

ALUMINA PLANT

L E G E N D

GREEN BELT

I N D E X

TREE PLANTATION

VEGETATION BARRIER

LANDSCAPE GARDEN

ARBORICULTURE

OFFICE GARDEN

NURSERY

TOPSOIL DUMP VEGETATION

OVERBURDEN/WASTE DUMP

VEGETATION

POST MINING VEGETATION

L E G E N D

First Year

Second Year

Third Year

N

SPACE FOR R.O.M ORE STOCKYARD

Fifth Year

Fourth Year

17

DISTRICT BOUNDARY

21

10

4

3

O.B -

2T.S

- 2

PERIPHERAL DRAIN

7

A R

E A

- 1

W E

S T

E R

N B

L O

CK

A R

E A

- 2

22

16

8

9

11

125

15

23

16

14

13

LELINGAPADAR

2

E A

S T E

R N

B

L O C

K

10

PERIPHERAL DRAIN

DISTRICT BOUNDARY

O.B-1205

19

18

4

3

T.S-1

KUTRUMALIPERIPHERAL DRAIN

PERIPHERAL DRAIN

M.L BOUNDARY

100 0 200 400 meters

For:LARSEN & TOUBRO LIMITED

MUMBAI

DEVELOPMENT OF BAUXITE DEPOSIT

AT KUTRUMALI

MINING PLAN

AFFORESTATION PLAN-FIRST FIVE YEARS

10352-K-13-3

SCALE

GREENBELT

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 44

ANNEXURE-VI

SURFACE PLAN

N

6500

N

6500

E 5000

E 4500

E 4100

E 3500

E 3000

E 2500

E 2000

E 1500

E 1000

E 500

N

7000

N

7500

N

8000

N

8500

N

9000

N

9500

N

10000

N

10500

N 1

1000

N 1

1500

N 1

2000

E 5500

E 6000

E 6500

1045

800

850

900

950

1000

950

900

850

800

900

950

1000

1050

1040

1000

1050

1060

1050

900

850

950

1000

1000

1080

1090

1100

1110

1050

1120

1130

1140

1050

1060

1150

900

1200

1000

1050

1100

1110

1020

1030

1040

1050

1000

950

950

900

950

1000

1130

1131

1120

1110

1120

1150

1160

1170

1180

1190

1200

1224

1220

1210

1200

1190

1180

1170

1160

1140

1120

1110

1100

1090

1080

1060

1000

1050

1070

1000

900

800

1040

950

1040950

900

850

800

850950

900

1000

1050

1040

1040

1050

900

950

950

1030

1030

1040

1040

1040

950

1000

1000

950

850

900

850

800

900

850

850

900

950

950

900

850

800

750

700

1150

950

1000

1000

950

1040

1030

750

850

900

950

1030

1050

1000

1040

1050

1000

1060

1040

1050

0B -2

3

PERIPHERAL DRAIN

PERIPHERAL DRAIN

K-25

44

KUTRUMALI

DISTRICT BOUNDARY

3

0.B-1

K-22

T . S -1K-24K-21

K-23

20

DISTRICT BOUNDARY

B L O

C

K

W E S T E R N

M.L. BOUNDARY

1

K-14K-1

22

26

26

4

T.S-2

K-19

K-18K-16

A R E A -2

K-17K-15K-2

K-3

A R E A -1

K-13

18

K-4

6

1917

K-20

57

K-5K-12

8

109

E A

S

T

E

R

N

B

L

O

C

K

K-7

5

1125

21

K-8

2

12

13

15

14

K-9

16

K-10

23

TO

ALU

MIN

A P

LAN

T

DISTRICT BOUNDARY

K-6

LELINGAPADAR

K-26

K-27

Z

Z3

24

K-28 K-30

K-29 K-31

K-32

K-33

K-34 K-35

23 GATE HOUSE

22 GROUND WATER RESERVOIR

21 RECEIVING AND STEPDOWN SUB-STATION

20 FUEL FILLING STATION

19 SERVICE CENTRE

18 ADMINISTRATIVE OFICE

17 SPACE FOR R.O.M ORE STOCKYARD

16 BELT CONVEYOR FOR BAUXITE TRANSPORT TO

15 CONEYOR DRIVE HOUSE

14 JUNCTION HOUSE -2

13 BELT CONVEYOR, BC -3

12 SURGE BIN

11 BELT CONVEYOR, BC -2

10 SAMPLE PREPARATION UNIT

9 JUNCTION HOUSE -1

8 BELT CONVEYOR, BC - 1

7 CRUSHER HOUSE

6 APPROACH RAMP TO CRUSHER HOUSE

5 ROADS FOR HAULGE AND ACCESS TO VARIOUS

4 TOPSOIL DUMP

3 OVERBURDEN / WASTE DUMP

2 MINING ZONE - EASTERN BLOCK

1 MINING ZONE - WESTERN BLOCK

INSTALLATIONS

ALUMINA PLANT

L E G E N D

100 0 200 400 meters

M.L. BOUNDARY

DISTRICT BOUNDARY

For:LARSEN & TOUBRO LIMITED

MUMBAI

DEVELOPMENT OF BAUXITE DEPOSITAT KUTRUMALI

MINING PLAN

MINE GENERAL LAYOUT

10352-K-4-6

SCALE

24 BAUXITE BEARING AREA

(BAUXITE THICKMESS<5M

STRIPPING RATIO>1)

25 BENCH MARK

NOTE:

FOR CONTOUR LINE UPTO 500 METERS BEYOND M.L BOUNDARY

LINES REFER TOPOGAPHICAL SHEET NO. 65/M/3/NE,

ENLARGED TO SCALE 1 : 10 000

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 45

ANNEXURE-VII

GEOLOGICAL PLAN

N 6000E 5

00

E 1

000

E 1

500

E 2

000

E 2

500

E 3

000

E 3

500

E 4

000

E 4

500

E 5

000

E 5

500

E 6

000

E 6

500

N 6500

N 7000

N 7500

N 8000

N 8500

N 9000

N 9500

N 10000

N 10500

N 11000

N 11500

N 12000

L E G E N D

SOIL

KHONDALITE

LATERITIC BAUXITE/BAUXITE

FOLIATION AND DIP

SCRAP HEIGHT IN METERS

BORE HOLE

M.L. BOUNDARY

DISTRICT BOUNDARY

BENCH MARK

1130

1140

1150

1160

1170

1180

1190

1200

1200

1150

1140

1130

1120

1110

1100

1090

1080

1070

1060 1

050

1040

1050

1040

1030

1030

1030

1040

1030

1040

1030

1040

1050

1050

1040

1030

1030

1040

1050

1050

1040

1050

1070

1040

1050

1070

1060

1050

1040

1040

1020

1030

1100

1120

1110

1110

1050

1131

1224

1045

50°

60°

65°

65° 70°

75°

75°

1130

1120

1130

1140

1150

1160

1170

1180

1190

1200

1210

1220

75°

1224

N

100 0 200 400 meters

For:LARSEN & TOUBRO LIMITED

MUMBAI

DEVELOPMENT OF BAUXITE DEPOSIT

AT KUTRUMALI

MINING PLAN

GEOLOGICAL MAP

10352-K-3-1

SCALE

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 46

ANNEXURE-VIII

GEOLOGICAL CROSS SECTION

1000

1020

1040

1060

1080

1100

1120

1140

1160

1180

1200

BH-K1(RL - 1158.7)

BH-K2

(RL - 1106.6)

BH-K3(RL - 1074.9) BH-K4

(RL - 1062.5)

WESTERN BLOCK

BH-K5(RL - 1057.4)

EASTERN BLOCK

BH-K6(RL - 1052.0)

BH-K7(RL - 1052.0)

POSITIONS OF MINING FACES/BLOCKS TOBE MINED OUT:

YEAR - 1

YEAR - 2

YEAR - 3

YEAR - 4

YEAR - 5

WORKING ZONE FOR

1ST FIVE YEAR

2ND FIVE YEAR

3RD FIVE YEAR

L E G E N D

SOIL

LATERITE

BAUXITE

ALUMINOUS LATERITE

KHONDALITE

PARTIALLY LATERISED KHONDALITE

SCRAP POINT (TOP)

1000

1020

1040

1060

1080

1100

1120

1140

BH-K15

(RL - 1091.8)

BH-K14

(RL - 1127.7)

1000

1020

1040

1060

1080

BH-K3

(RL - 1074.9)

1000

1020

1040

1060

BH-K13

(RL - 1066.1)

1000

1020

1040

1060

BH-K4

(RL - 1062.5)

1030

1050

1070

1130

1110

1170

1150

1130

1110

1020

1000

1020

1040

1060

1080

1100

1120

1140

1160

BH-K1

(RL - 1158.7)

BH-K14

(RL - 1127.7)

BH-K16

(RL - 1102.1)

BH-K18

(RL - 1078.3)

1110

1130

25 0 50 100 meters

For:LARSEN & TOUBRO LIMITED

MUMBAI

DEVELOPMENT OF BAUXITE DEPOSIT

AT KUTRUMALI

MINING PLAN

GEOLOGICAL SECTIONS

10352-K-3-4 TO 10352-K-3-9

SCALE

Pre-Feasibility Report for Kutrumali Bauxite Mining Project of 3.0 MTPA in Kalahandi & Rayagada, Districts of Odisha

Kutrumali Bauxite Mine (696.734 ha) 47

ANNEXURE-IX

CONCEPTUAL MINE PLAN

1060

1060

1120

1110

1060

1130

1120

1160

1140

1160

1140

1140

1150

1070

1070

1070

1080

1110

1080

1080

1070

1060

1060

1070

1070

1110

11201130

1140

1150

1140

1130

1170

1150

1130

1110

1130

1060

1110

1120

1120

1130

1150

1120

1070

1070

1060

1060

1070

1070

1080

K-17

K-13 K-12

K-6

K-24K-23

K-21K-20

K-5K-3 K-4

K-16

K-15K-1A

K-2K-1

K-6

K-8

K-7

K-22

1170

1200

1190

1100

1120

1130

1140

1070

1080

1090

1080

1090

1090

1100

1080

1070

1080

1070

1060

1040

1050

1060

10501060

1070

1080

1090

1110

1110

1150

1160

1170

1180

1190

1170

1150

1140

1110

1120

1130

1110

1110

1100

1060

1050

1040

1040

1040

1050

1060

1050

1070

1050

1040

1040

1050

1050

1050

1030

1030

1040

1046

1046

1040

1030

1050

1048

1042

1050

1050

1050

1040

1040

1060

1062

E4000

E3900

E3800

E3700

E3600

E3500

E3400

E3300

E3200

E3100

E3000

E2900

E2800

E2700

E2600

E2500

E2400

E2300

E2200

E2100

E2000

E1900

E1800

N10700

N10600

N10500

N10400

N10300

N9200

N9300

N9400

N9500

N9600

N9700

N9800

N9900

N10000

N10100

N10200

METERS

METERS

E4800

E4100

E4200

E4300

E4400

E4500

E4600

E4700

N

BORE HOLES DRILLED

SURFACE CONTOUR LINES

ULTIMATE LIMITE OF MINING

PIT BOUNDARIES / WORKING LIMITS FOR:

FIRST FIVE YEARS

SECOND FIVE YEARS

REFERENCE DRAWINGS:

GEOLOGICAL SECTIONS

10352-K-3-4 to 10352-K-3-9

BORE HOLES PROPOSED TO BEDRILLED AFTER 1ST 5 YEAR

THIRD FIVE YEARS

WESTERN BLOCK

EASTERN BLOCK

K-7

1050

TO CRUSHING PLANT

TO WASTE DUMPS

TO

WASTE D

UM

PS

KUTURMALI

25 0 50 100 meters

For:LARSEN & TOUBRO LIMITED

MUMBAI

DEVELOPMENT OF BAUXITE DEPOSIT

AT KUTRUMALI

MINING PLAN

CONCEPTUAL MINING PLAN

10352-K-4-5

SCALE