Pre-Design Seminar.ppt

download Pre-Design Seminar.ppt

of 77

Transcript of Pre-Design Seminar.ppt

  • 8/10/2019 Pre-Design Seminar.ppt

    1/77

    Presented By

    Kenneth W. Hargrove, AIA, NCARB

    ARCHITECTURAL

    REGISTRATIONEXAMINATION

    PRE-DESIGN

    SEMINAR

  • 8/10/2019 Pre-Design Seminar.ppt

    2/77

    ARE Pre Design Seminar

    ARCHITECTURAL PROJECT PHASES

  • 8/10/2019 Pre-Design Seminar.ppt

    3/77

    ARE Pre Design Seminar

    PRE-DESIGN:

    PROJECT PLANNINGPHASE DELIVERABLESDOCUMENT PLANNING

    SCHEDULE DEVELOPMENTFEE PROJECTIONS

    ASSEMBLING THE TEAM

    ARCHITECTURALPROGRAMMING

    BUILDING TYPE STUDYCLIENT INTERACTION

    SITE ANALYSISFUNCTIONAL ANALYSIS

    COST ANALYSISCONCEPT DEVELOPMENT

    ORGANIZATION

  • 8/10/2019 Pre-Design Seminar.ppt

    4/77

    ARE Pre Design Seminar

    PART I

    PROJECT PLANNING

  • 8/10/2019 Pre-Design Seminar.ppt

    5/77

    ARE Pre Design Seminar

    PROJECT PLANNING

    PHASE DELIVERABLES

    DOCUMENT PLANNING

    SCHEDULE DEVELOPMENT

    FEE PROJECTIONS

    ASSEMBLING THE TEAM

  • 8/10/2019 Pre-Design Seminar.ppt

    6/77

    ARE Pre Design Seminar

    PHASE DELIVERABLES

    SCHEMATIC DESIGNDocuments required todescribe the general design intent, general

    relationships and space requirements of the

    project along with cost projections.

    PROGRAMMING SHOULD BE COMPLETE

    IF NOT IT MUST BE COMPLETED IN

    SCHEMATIC DESIGN

    ARCHITECTURAL MUST LEAD

    CONSULTANTS ASSIST THE

    SCHEMATIC DESIGN PROCESS TO

    DEFINE SYSTEMS AND COSTS

    Schematic Design DeliverablesAPPROVED BUILDING PROGRAM

    Space/Area Allocation ChartRoom Data SheetsFunctional RelationshipsCode Reviews

    DRAWINGSArchitectural Site PlanFloor PlansPrimary Building ElevationsRenderings and Diagrams

    (Sufficent to explain building design Intent)

    MANUAL

    Architectural DescriptionStructural DescriptionHVAC Systems DescriptionPlumbing Systems DescriptionFire Protection System DescriptionElectrical System DescriptionSq. Ft. Estimate of Construction CostsSite Survey

    Soils Report

  • 8/10/2019 Pre-Design Seminar.ppt

    7/77

    ARE Pre Design Seminar

    PHASE DELIVERABLES

    DESIGN DEVELOPMENTEnough description ofQUANTITY and QUALITY to confirm budget projections,

    inform the client of what to expect and to guide

    consultants through Construction Documents.

    FLOOR PLANS, RCP,S ELEVATIONS AND SECTIONS

    SHOULDB BE TACT DOWN FOR CONSULTANTS TO FOLLOW

    INTERIOR ELEVATIONS, MILLWORK AND EQUIPMENT

    SHOULD BE SUFFICENT FOR OWNER REVIEW AND APPROVAL

    FRONT END SECTIONS SHOULD BE READY FOR OWNER

    REVIEW AND APPROVAL

    SYSTEMS AND FIXTURE CUTS SHOULD BE READY FOR

    OWNER REVIEW AND APPROVAL

    COST PROJECTTIONS

    Design Development Deliverables

    DRAWINGS

    Architectural Site Planw/ Building Location Established

    Life Safety PlansFloor PlansRoof Plan w/ Drainage LayoutCeiling PlansBuilding ElevationsBuilding SectionsTypical Wall SectionsTypical Wall Section DetailsEnlarger Room Plans

    Enlarged Stair Plans and SectionsEnlarged Elevator Plans and SectionsFinish ScheduleHardware ScheduleInterior Elevations (needing owner review)Millwork ElevationsEquipment PlansStructural Foundations and Framing DiagramsHVAC Systems Diagrams and LoadsPlumbing Systems DiagramsFire Protection System Diagrams

    Electrical System Diagrams

    MANUALFront End Specifications for Owner review and comments

    Architectural Specification Section OutlinesStructural Specification Section OutlinesMEP Specification Section Outlines

    Equipment Data SheetsHVAC Fixture CutsPlumbing Fixture Cuts

    Light Fixture CutsEstimate of Construction Costs by Discipline

  • 8/10/2019 Pre-Design Seminar.ppt

    8/77

    ARE Pre Design Seminar

    DOCUMENT PLANNINGCONTRACT DOCUMENTSFinal bid set

    of working drawings and specifications.

    Must describe everything that is

    important to the success of the project.

    Estimate Time to Produce

    Items on the Sheet

    Sheet Name and Number

    GENERAL and SCHEDULES - A100PLANS (FLOOR, ROOF, RCP)A200

    BUILDING ELEVATIONSA300

    BUILDING and WALL SECTIONSA400

    ENLARGED PLANS and SECTIONSA500

    PLAN DETAILSA600

    SECTION DETAILSA700

    WALL ELEVATIONSA800

    SPECILTY ITEM DETAILINGA900

  • 8/10/2019 Pre-Design Seminar.ppt

    9/77

    ARE Pre Design Seminar

    DOCUMENT PLANNING

  • 8/10/2019 Pre-Design Seminar.ppt

    10/77

    ARE Pre Design Seminar

    PROJECT SCHEDULE:

    BAR GRAPHSsimply indicate the startand finish dates of major phases of the

    work. They are better as a form of visual

    communication but inferior to a CPM

    schedule as a management tool.

    CPM SCHEDULESalso indicate the start

    and finish dates of major phases, but , also

    indicate the relationships between the

    sequence of activities and the dependencyof activities on each other within the phases

    FLOAT TIME

    CALENDER DAYS

    WORKING DAYS

    FASTTRACKING

  • 8/10/2019 Pre-Design Seminar.ppt

    11/77

    ARE Pre Design Seminar

    PROJECT DESIGN SCHEDULE:

    CONTRACTSPROGRAMING

    SCHEMATIC DESIGN

    DESIGN

    DEVELOPMENT

    CONTRACT

    DOCUMENTS

    BID PHASE

    CLIENT REVIEWS

    ARCHITECTURAL

    REVIEWS:

  • 8/10/2019 Pre-Design Seminar.ppt

    12/77

    ARE Pre Design Seminar

    FEE PROJECTIONS - TOP DOWN METHOD

    PROJECT TITLE

    PROJECTED

    CONSTRUCTION COST

    TRADITIONAL FEE %

    TOTAL

    PROFESSIONAL FEE

  • 8/10/2019 Pre-Design Seminar.ppt

    13/77

    ARE Pre Design Seminar

    FEE PROJECTIONS - TOP DOWN METHOD

    TRADITIONAL CONSULTANT %CIVIL 10.5%

    STRUCTURAL 9.4%

    MECHANICAL 15%

    ELECTRICAL 12.5%

    OTHER CONSULTANTS ?

    PROFIT 20%

    (Are they appropriate

    for this project?)

    ESTIMATE EXPENSES

    SET ASIDE PROFIT

    PHASE PROJECTIONS(Useful in evaluation

    consultant invoices.)

    (Why are phase totals

    Not equal to %?)

    (OWNERS MAY REQUEST

    INVOICE PROJECTIONS)

    PRODUCTION

    FEE AVAILABLE

  • 8/10/2019 Pre-Design Seminar.ppt

    14/77

    ARE Pre Design Seminar

    FEE PROJECTIONS - TOP DOWN METHOD

    TRADITIONAL

    PHASE %SCHEMATIC DESIGN 15%

    DESIGN DEVELOPMENT 15%

    CONSTRUCTION DOC. 35%

    BID 5%

    CONST. OBSERVATION 30%

    (Are they appropriatefor this project?)

    PERSONEL &

    BILLABLE RATES

    IS THERE ENOUGH

    FEE FOR EACHPHASE?

    ARE WE USING

    THE RIGHT

    PERSONEL MIX?

    IS THIS

    OUR AVERAGEPERSONEL RATE?

  • 8/10/2019 Pre-Design Seminar.ppt

    15/77

    ARE Pre Design Seminar

    CONSULTANT CONTRACTS:One of the chief functions of an architect is to assemble

    and coordinate / orchestrate, a team of specialists tocreate a functional design.

    To unite the separate skills of the contributing

    specialists around a central theme,

    to give form to an idea.

  • 8/10/2019 Pre-Design Seminar.ppt

    16/77

    ARE Pre Design Seminar

    CONSULTANT CONTRACTS:

    Make sure all services expected,deliverables, formatting issues and

    time limits are understood up front

    Determine systems and Establish

    Budgetary Goals Early.

    STRUCTURAL ENGINEERING SERVICES CHECKLIST

    This checklist is not intended to be a complete and exhaustive listing of required

    professional services, only an outline of those services, to assist both the Architect and

    Consulting Engineer in verifying professional services completion and is based on AIA

    Standard Form D200.

    PART 1SCHMEATIC DESIGN

    1.01 Review and complete contractual agreement for consulting services.

    1.02 Obtain site surveys, soils reports, architectural pre-schematic layouts, projectcontact index, program requirements, and standard Architect formats. Request

    any additional test, reports documents or analysis required for this part of the

    work.

    1.03 Assist the Architect in recommending structural systems and layout modificationsbased on suitability, constraints and const efficiency. Provide assistance or

    proposed. Advise the Architect of special or unusual conditions

    1.04 Provide written description of structural systems materials required, codeconformances and all pertinent design loads.

    1.05 Provide written preliminary estimate of construction cost. Provide costcomparison analysis of possible alternate systems as requested.

    PART 2DESIGN DEVELOPMENT

    2.01 Obtain schematic submittal documents, approvals, comments and decisions from t

    the Architect.

    2.02 Obtain the architects standard format velum in sufficient quantities for drawingsrequired at the consultantsexpense.

    2.03 Coordinate systems, dimensions, clearances, and standards with the Architect andother consultants.

    2.04 Prepare and submit to the Architect a minimum of 5 days prior to the contractualor established submittal date, plans indicating:

    Finish Building Floor Grade

    Building Location

    Column Footings and Grade Beam LocationsRequired Retaining Walls

    Above Grade Floor and Roof Framing Layouts

  • 8/10/2019 Pre-Design Seminar.ppt

    17/77

    ARE Pre Design Seminar

    CONSULTANT CONTRACTS:The Architect must deliver in time

    for consultants to perform.

    Require Consultants complete documents

    in time for thorough coordination

    of systems and documents.

    Hold Consultants responsible for

    maintaining Budget Goals.

    Building Floor and Roof Structure Elevations with Floor to Structure C

    Clearences

    2.02 Provide list of final specification sections and drawings with outline of contents.

    2.03 Review schematic design items 1.03, 1.04, 1.05 and update status, in writing,providing additional information, revisions or new recommendations for each.

    PART 3CONTRACT DOCUMENTS PHASE

    3.01 Obtain the design development documents, approvals, comments and decisionsfrom the Architect.

    3.02 Review the design development submittal and coordinate structural elements withother disciplines. Make all revisions or additions required or requested by theOwner/Architect or needed to facilitate or coordinate with other disciplines.

    3.03 Complete contract documents, drawings and specifications.Provide one set 75% submittal prints for architects review and comment atappropriate time interval. 75% submittal to include 100% complete photo

    ready specifications in the architectsformat for insertion and printing.Provide additional detailing requested to adequately describe systems or

    elements as requested by the Architect.

    Final drawing original tracings to be submitted 10 days minimum prior tocontractual or established submittal date.

    3.04 Review project description and cost estimate item 2.06 and revise as required at75% C.D. submittal. Provide written itemization of cost by specificationdivisions applicable. Make any final recommendations to reduce cost or improvedesign. Verify cost containment within budget constraints.

    3.05 Sign and Seal documents required for Government agency reviews andpermitting. Meet with reviewing agencies, clarify and/or revise documents asrequired to obtain permits and approvals required for construction and occupancy.

    PART 4BID PHASE

    4.01 Obtain complete set of bid documents and review for correctness, omissions, andcoordination with work of other disciplines. Advise the Architect accordingly,providing revision or clarification documents for inclusion in addendum duringthe bid process.

    4.02 Address Contractor questions, comments and request for alternate products,systems or procedures. Provide revision or clarification documents for inclusion

    in addendum during bid process.

    4.03 Review all addendum for correctness, completeness and coordination of otherdisciplines.

    4.04 Continue to follow governing agency review and approval process to expedite

    approvals in a timely manner, Item 3.05.

  • 8/10/2019 Pre-Design Seminar.ppt

    18/77

    ARE Pre Design Seminar

    PART II

    PROGRAMMING

  • 8/10/2019 Pre-Design Seminar.ppt

    19/77

    ARE Pre Design Seminar

    ARCHITECTURALPROGRAMMING

    PROCESS

    FRAMEWORK

    NEEDSHUMAN PROPORTIONSBUILDING TYPE STUDY

    FUNCTIONAL ANALYSIS

    CODE ANALYSISCOST ANALYSIS

    CONTEXT

    FORM

    CONCEPT DEVELOPMENT

    EVALUATION

  • 8/10/2019 Pre-Design Seminar.ppt

    20/77

    ARE Pre Design Seminar

    ARCHITECTURAL PROGRAMMING

    The process of identification and systematic organization of the functional,architectural, structural, mechanical, aesthetic and budgetary criteria

    which guide decision making in the design of buildings

    .Good Programming is achieved through a well structured PROCESSanda comprehensive FRAMEWORKfor organizing information

  • 8/10/2019 Pre-Design Seminar.ppt

    21/77

    ARE Pre Design Seminar

    PROGRAMMING PROCESS

    Client / architect INTERACTION and effective COMMUNICATIONis essential to the programming process

  • 8/10/2019 Pre-Design Seminar.ppt

    22/77

    ARE Pre Design Seminar

    PROGRAMMING PROCESS

    Programming is and should be done

    independently of architectural design.

    However, the process rarely ends

    when the program is published.

    Discovery, Expression and Verification require

    revisiting assumptions, concepts and conclusions.

  • 8/10/2019 Pre-Design Seminar.ppt

    23/77

    ARE Pre Design Seminar

    PROGRAMMING PROCESS

    Programming is often performed in three phases:

    BROAD OBJECTIVES AND PROBLEMS ARE STATED

    FUNCTIONAL REQUIREMENTS ARE DISCRIBED BY

    SIZE AND RELATIONSHIPS

    DETAILED REQUIREMENTS ARE DEVELOPED

  • 8/10/2019 Pre-Design Seminar.ppt

    24/77

    ARE Pre Design Seminar

    DFW Terminal D Parking Garage

    CIRCULATION CONCEPT DEVELOPMENT

  • 8/10/2019 Pre-Design Seminar.ppt

    25/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

    POSITIVES:

    SEPERATED SHORT TERM

    AND LONG TERM VEHICULAR

    CIRCULATION LOOPS

    SEPARATED VEHICLE AND

    PEDESTRIAN CIRCULATION

    NEGATIVES:POCKETED PARKING ZONES

    WEAK UNDERSTANDING OF

    HELIX RAMPS

    HELIX RAMPS ARE COMPACT

    BUT REQUIRE MORE COMPLEX

    CIRCULATION TO ACCESS

    CREATING MORE COMPLEX

    DECISIONS AND CONJESTION

    HELIX RAMPS SLOW TRAFFIC

    CIRCULATION AND DIVERT

    CIRCULATION TO CURBSIDE

    PARKING LAYOUT PARALLEL

    TO DESTINATION, REQUIRING

    PATRONS TO THREAD

    THROUGH PARKED CARS

    PEDESTRIAN HORIZONTAL CIRCULATION

    PEDESTRIAN VERTICAL CIRCULATION

    VEHICULAR HORIVONTAL

    CIRCULATION

    VEHICLE VERTICALCIRCULATION

  • 8/10/2019 Pre-Design Seminar.ppt

    26/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

    THE DOUBLE HELIX

  • 8/10/2019 Pre-Design Seminar.ppt

    27/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

    POSITIVES:CENTRAL EXPRESS RAMPIS DESTINATION ORIENTED

    AND REDUCE TRAFFIC AT

    CURBSIDE

    SEPARATED VEHICLE AND

    PEDESTRIAN CIRCULATION

    PARKING LANES AT RIGHT

    ANGLES TO DESTINATION,

    ENABLE PATRONS TO WALKDIRECTLY TOWARD THE

    DESTINATION WITHOUT

    THREADING THROUGH

    PARKED CARS

    CENTRAL VEHICULAR

    CIRCULATION REDUCES

    POCKETED ZONES AND

    INCREASES EFFICENCY

    NEGATIVES:

    CENTERAL EXPRESS RAMP

    INCREASES VERTICAL

    VEHICULAR CIRCULATION

    SPEED AND CREATE FEWER

    BUT MORE INTENSE

    INTERSECTIONS

    SHORT TERM & LONG TERM

    VEHICULAR CIRCULATIONLOOPS ARE LESS DEFINED

  • 8/10/2019 Pre-Design Seminar.ppt

    28/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

    POSITIVES:

    PERIMETER EXPRESS RAMPIS DESTINATION ORIENTED

    AND REDUCE TRAFFIC AT

    CURBSIDE

    SEPARATED VEHICLE AND

    PEDESTRIAN CIRCULATION

    PARKING LANES AT RIGHT

    ANGLES TO DESTINATION,

    ENABLE PATRONS TO WALKDIRECTLY TOWARD THE

    DESTINATION WITHOUT

    THREADING THROUGH

    PARKED CARS

    PERIMETER VEHICULAR

    CIRCULATION REDUCES

    POCKETED ZONES AND

    INCREASES EFFICENCY

    PERIMETER EXPRESS RAMPINCREASES VERTICAL

    VEHICULAR CIRCULATION

    SPEED AND BIANARY

    DECISION POINTS

    REDUCING DECISION TIME

    AND CONGESTION

    NEGATIVES:

    SHORT TERM & LONG TERM

    VEHICULAR CIRCULATIONLOOPS ARE LESS DEFINED

  • 8/10/2019 Pre-Design Seminar.ppt

    29/77

    ARE Pre Design Seminar

    PROGRAMMING FRAMEWORK

    An effective framework for organizing programmatic information is thedivision of information into FUNCTION, FORM, ECONOMY and TIME.

  • 8/10/2019 Pre-Design Seminar.ppt

    30/77

    ARE Pre Design Seminar

    PROGRAMMING FRAMEWORK

    Putting together a complex array of sometime

    contradictory parts to form a unitedinterdependent composition

    SYNTHESIS

  • 8/10/2019 Pre-Design Seminar.ppt

    31/77

    ARE Pre Design Seminar

    NEEDS

    HUMAN PROPORTIONS

  • 8/10/2019 Pre-Design Seminar.ppt

    32/77

    ARE Pre Design Seminar

    BUILDING TYPE STUDIESBASIC FUNCTIONS AND PROCESS

    NORMAL SPACES AND AREASRULES OF THUMB

    HISTORIC / TRADITIONAL SOLUTIONS

    TRADITIONAL FORMS

  • 8/10/2019 Pre-Design Seminar.ppt

    33/77

    ARE Pre Design Seminar

    BUILDING TYPE STUDIESPROCESS FLOW

    ROOM SIZE

    ORGANIZATION

  • 8/10/2019 Pre-Design Seminar.ppt

    34/77

    ARE Pre Design Seminar

    BUILDING TYPE STUDIES

    EQUIPMENT NEEDS

    DEP RTMENT L DI GR MS

    COMPOSITE DIAGRAMS

  • 8/10/2019 Pre-Design Seminar.ppt

    35/77

    ARE Pre Design Seminar

    BUILDING TYPE STUDIES

    COURTHOUSE DESIGNJudge/Jury/Public circulation patterns are

    critical to a court house design.

    SHOPPING MALL DESIGN

    Store mix, convenient access, identity and adequate

    parking are critical to a suburban shopping mall.

    THEATER DESIGN

    Site lines and acoustics are critical to the

    success of a theater design.

  • 8/10/2019 Pre-Design Seminar.ppt

    36/77

    ARE Pre Design Seminar

    FUNCTIONAL ANALYSIS

    Determine the order of importance,

    or hierarchy of functions and spaces

    and their relationships to each other.

    After preliminary studies, owner

    feedback is needed to discover his

    unique needs, concerns and issues.

    Bubble diagrams and matrixes are typical methods

    to express what we learn in this process.

  • 8/10/2019 Pre-Design Seminar.ppt

    37/77

    ARE Pre Design Seminar

    SPACE / AREA ALLOCATION

    Assembling spaces and area leads to NET AREA.Add circulation, structure, mechanical

    and shared space to obtain GROSS AREA

    NET AREA divided by GROSS AREA

    is the building EFFICENCY

  • 8/10/2019 Pre-Design Seminar.ppt

    38/77

    ARE Pre Design Seminar

    ROOM DATA SHEETS

    To establish space relationshiprequirements, internal room

    requirements, equipment required,

    activity zones, lighting and

    conditioning requirements.

    Tailor the ROOM DATA sheet

    to the building type and the client, to

    get the information needed and

    get the clients buy-in early

    I usually fill in the blanks for users

    review, comments and approval.

  • 8/10/2019 Pre-Design Seminar.ppt

    39/77

    ARE Pre Design Seminar

    ROOM DATA SHEETS

  • 8/10/2019 Pre-Design Seminar.ppt

    40/77

    ARE Pre Design Seminar

    SPACE PRIORITY MATRIX

    Tells the designer that theOwner Is most concerned

    about Comfort, Character

    and Flexibility in the Living

    Rooms and is willing to

    Pay more in initial costs

    And utility costs to get it.

    In the kitchen Comfort

    And Character are still

    Priorities, but, Flexibility

    is not, and that he is less

    willing to pay more for the

    Character and Comfort

    Because of budgetary

    concerns.

  • 8/10/2019 Pre-Design Seminar.ppt

    41/77

  • 8/10/2019 Pre-Design Seminar.ppt

    42/77

    ARE Pre Design Seminar

    CODE ANALYSIS

    STANDARD BUILDING CODE

    UNIFORM BUILDING CODE

    BOCA CODEINTERNATIONAL BUILDING CODE

    Building codes deal with the spatial, structural and

    mechanical aspects of a building as they affect public

    health, safety and welfare. They can be

    PRESCRIPTIVE or PERFORMANCE in nature.

    TEXAS ACCESSIBLITY STANDARDS

    LIFE SAFETY CODE - ANSI A117.1

  • 8/10/2019 Pre-Design Seminar.ppt

    43/77

    ARE Pre Design Seminar

    CODE ANALYSIS:OCCUPANCY

    Assembly, Business, Education,

    Factory, Hazardous Uses,

    Institutional, Mercantile,

    Residential, Storage, Utility

    BUILDING PROPERTIES

    AREA, HEIGHT, STORIES

    CONSTRUCTION TYPE

    TYPE 1 and 2Non-Combustible Construction

    TYPE 3Exterior Walls are non-combustible

    TYPE 4Heavy Timber Construction

    TYPE 5Combustible Construction

    OCCUPANCY REQUIREMENTS

    Occupant Capacities

    Finishes

    Sub-Classifications

    Special Protections

    CONSTRUCTION REQUIREMENTS

    Fire protection Requirements

    Egress Requirements

    MISCELANEOUS REQUIREMENTS

  • 8/10/2019 Pre-Design Seminar.ppt

    44/77

    ARE Pre Design Seminar

    SAMPLE CODE ANALYSIS:

    PROJECT TITLE INFO

    CODE USED

    OCCUP NCY

    Open Air Parking Garage

    BUILDING PROPERTIES

    AREA, HEIGHT, STORIES

    CONSTRUCTION TYPE

    Type 1Non-Combustible

    REQUIREMENTS

    OCCUPANCY REQUIREMENTS

    CONSTRUCTION REQUIREMENTS

    MISCELANEOUS REQUIREMENTSWall Openings

    Height and Area

    Railings

    Barriers

    Fire Sprinklers

    REFERENCE LOC TIONS

    BUILDING CODE ANALYSIS

    PROJECT: DFW Terminal D Parking GarageLOCATION: DFW AirportPROJECT NO.: 20611.00DATE: 3/2/01CODE: 2000 International Building Code

    BUILDING STATISTICS

    AREA: Floors 16 @ 389,997sf = 2,339,982sfFloors LL1 and LL2 @ 512,271 = 1,024,542sf

    TOTAL = 3,364,524sfOCCUPANCY: Open Parking GarageCONSTRUCTION TYPE: Post-Tension Cast-In-Place ConcreteBUILDING HEIGHT: 108.16

    REQUIREMENTS REF.

    OCCUPANCY TYPE: Group S-2, Low-Hazard Storage 311.3Open Parking Garage 406.2

    CONSTRUCTION TYPE: Type I, unsprinkled 602.2 / Table 601Structural Frame 3hr Table 719.1(2)

    Bearing Walls 3hrFloors 2hrRoofs 1.5hr

    MIN. EXT. WALL OPEN AREA: 20% of total, located on 2 or more sides 406.3.3.140% of linear perimeter length

    MAX. HEIGHT: UL 503 / Table 503MAX. AREA: UL 503 / Table 503ALLOWABLE CLEAR HEIGHT: 7-0 min. (8-2) 406.2.2 (1106.4)GUARD RAIING: 42 height railings at all slab drop 30 or more, including

    glazed sides of stairs and ramps, 4 sphere limit to 34 406.2.38 sphere limit from 34 to 42(see exception 3 for group S allowing 21spacing) 1003.2.12.2

    VEHICLE BARRIERS: 50psf uniform, 2,000lbs on 20 sq.in. concentrated 406.2.4FIRE SPRINKLERS: Not Required 903.2.11

  • 8/10/2019 Pre-Design Seminar.ppt

    45/77

  • 8/10/2019 Pre-Design Seminar.ppt

    46/77

    ARE Pre Design Seminar

    THIRD PAGE

    SAMPLE CODE ANALYSIS:

    PROJECT TITLE INFO

    REQUIREMENTS

    STAIR REQUIREMENTS

    EXIT ACCESS

    EXITS

    ACCESSABILITY

    PEDESTRIAN BRIDGEREQUIREMENTS

    REFERENCE LOC TIONS

    BUILDING CODE ANALYSIS Page 3PROJECT: DFW Terminal D Parking Garage

    ..

    REQUIREMENTS REF.

    STAIRS: 44 min. width 1003.3.3.180 min. Headroom 1003.3.3.2

    7 max. 4 min. Risers, 11 min Treads 1003.3.3.3Handrails @ 34 high 1003.3.3.11.1Intermediate Handrails required for stairs greater than 60 1003.3.3.11.2

    Handrail Projections 12 @ Top, 11 @ Bot. 1003.3.3.11.54.5handrail Projections Allowed 1003.3.3.11.7One Stair to Roof Min. 1003.3.3.12

    EXIT ACCESS: 300 min Exit Access travel Distance Table 1004.2.4

    EXITS: 4 min. Table 1005.2.1Open Egress Stairs Allowed 1005.3.2

    (Smoke Exhaust Provided for Enclosed Areas)Sign Exit Discharge Levels in Stairs 1005.3.2.3Sign Floor Levels in Stairs 1005.3.2.4

    ACCESSABLITY: 1 Entrance Route min. for each Destination 1105

    HCPatron Parking Required: Table 1106.1Levels LL2, LL1, 1, 2, 3, 4, and 5 = 7086 cars

    @ 20 for first 1000 + 1/100 cars over 1000 = 81 HC spaces

    HC Patron Parking P rovided:

    Equally divided between levels 1, 3 and 5 and between north and south :Level 1 - 10 @ South Diag. 6 @ Central Core, 10 @ North Diag.

    Level 3 - 10 @ South Diag. 4 @ Central Core, 10 @ North Diag.Level 5 - 14 @ South Diag. 4 @ Central Core, 14 @ North Diag.

    SUB-TOTAL = 34 @ South Diag, 14 @ Central Core, 34 @ North Diag.

    TOTAL HC SPACES = 82

    HC Employee Parking Required:

    6thLevel, 979 cars979 cars or 490 cars North Destination and 490 cars to South Destination

    HC Employee Parking Provided:8 @ South Diag. 4 @ Central Core, 8 @ North Diag.

    TOTAL HC SPACES = 20

    PEDESTRIAN BRIDGES: 2hr Fire Wall min. each side 10 above and below 3104.5

    (see exceptions)Smoke Exhaust Required 3104.11

  • 8/10/2019 Pre-Design Seminar.ppt

    47/77

    ARE Pre Design Seminar

    HANDICAP

    ACCESIBLITY CODES

  • 8/10/2019 Pre-Design Seminar.ppt

    48/77

    ARE Pre Design Seminar

    ZONING ORDINANCES:DEVELOPED OUT OF

    LAND PLANNING and URBAN DESIGN CONCEPTSRECTILINEAR

    CIRCULAR

    RADIOCENTRIC

    FOCUS - Town Square and The Plaza

    CONNECTORSBoulevards, Vista Avenues, Parkways

    The GARDEN CITY CONCEPTS

  • 8/10/2019 Pre-Design Seminar.ppt

    49/77

    ARE Pre Design Seminar

    ZONING ORDINANCES:SEGREGATION OF USES

    CONTROL OF POPULATION DENSITYPARKING AND LOADING REQUIREMENTS

    HEIGHT, SIZE AND SETBACKS

    SITE LAYOUT AND COVERAGES

    SIGNAGE AND LANDSCAPING

    WATER RETENTION AND DETENTION

    EASMENTSDEED RESTRICTIONS

    COVENANTS

    To preserve and protect the

    health, safety and general

    welfare of the public;

    To enhance the quality of life;

    and To protect property

    values.

    They regulate land usage

    and the function, size and

    certain exterior aspects

    of a project

  • 8/10/2019 Pre-Design Seminar.ppt

    50/77

  • 8/10/2019 Pre-Design Seminar.ppt

    51/77

    ARE Pre Design Seminar

    COST PROJECTIONS

    It is important to set BUDGETS and establish

    levels of Quantity and Quality EARLY, and that

    the client understands that changes in one will

    require changes to the others.

    The architects estimates are always only

    projections because he can not control:

    INFLATION

    MARKET CONDITIONS

    CONTRACTOR MEANS and METHODS

    BUDGET

    SCOPE

    QUALITY

  • 8/10/2019 Pre-Design Seminar.ppt

    52/77

    ARE Pre Design Seminar

    PRELIMINARY CONSTRUCTION

    COST PROJECTIONS:SQUARE FOOT COSTS

    based on Occupancy Type, Sizeand Type of Construction

    COMMON MODIFICATION FACTORS

    COMMON ADDITIONS

  • 8/10/2019 Pre-Design Seminar.ppt

    53/77

    ARE Pre Design Seminar

    PRELIMINARY CONSTRUCTION

    COST PROJECTIONS:DIVISION COST BREAKDOWN

    ADJUST PER LOCALITY INDEX

  • 8/10/2019 Pre-Design Seminar.ppt

    54/77

    ARE Pre Design Seminar

    DETAIL CONSTRUCTION COST

    PROJECTIONS:ITEMIZED BREAK DOWN OF COSTS

    LIFE CYCLE COST EVALUATIONS

    USE OF SPECIALIZED CONSULTANTS

    Total with Profit and Overhead

    Total Bare Costs

    Equipment Costs

    Labor CostsMaterial Costs

  • 8/10/2019 Pre-Design Seminar.ppt

    55/77

  • 8/10/2019 Pre-Design Seminar.ppt

    56/77

    ARE Pre Design Seminar

    CONTEXT

  • 8/10/2019 Pre-Design Seminar.ppt

    57/77

    ARE Pre Design Seminar

    SITE ANALYSIS

    One of the first items needed to start the design phase.

    SITE SURVEY

    SOILS REPORT

    Who provides them?

    How are they obtained?

    What needs to be in them?

  • 8/10/2019 Pre-Design Seminar.ppt

    58/77

    ARE Pre Design Seminar

    Site Survey and

    Soil ReportsLEGAL DISCRIPTION

    ZONING CLASSIFICATION

    SITE BOUNDRIES

    RESTRICTIONS / ESMENTS

    ACCESS

    EXISTING STRUCTURES

    TOPOGRAPHY

    LANDSCAPE ELEMENTSDRAINAGE

    SOILS

    UTILITIES

  • 8/10/2019 Pre-Design Seminar.ppt

    59/77

    ARE Pre Design Seminar

    SITE ANALYSIS

    ORIENTATION

    VIEWS

    SCREENING

  • 8/10/2019 Pre-Design Seminar.ppt

    60/77

    ARE Pre Design Seminar

    SITE ANALYSIS

  • 8/10/2019 Pre-Design Seminar.ppt

    61/77

    ARE Pre Design Seminar

    FORM

    SCALE

    PROPORTIONSRHYTHUM

    BALANCE

    SYMMETRY

    LIGHT

    COLOR

    VARIETY

    TEXTURE

    STRUCTURE

    SYSTEMSTRADITION

    CULTURAL ASSOCIATION

    ASTHETIC PREFERENCES

    Understand the relationshipOf people to their environment.

    No single environment canSatisfy all people so our objective

    Ought to be to create designsWhich permit, even encourage

    the diversity of human opinion.Designs which offer individual

    Expression as well as sensitivity,

    Sensory stimulation and comfort.

  • 8/10/2019 Pre-Design Seminar.ppt

    62/77

    ARE Pre Design Seminar

  • 8/10/2019 Pre-Design Seminar.ppt

    63/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

    Concepts are developed through the

    PROGRAMMING PROCESS

  • 8/10/2019 Pre-Design Seminar.ppt

    64/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

    Effective programming requires discovering the facts,

    the exercise of reason and objectivity to develop concepts

  • 8/10/2019 Pre-Design Seminar.ppt

    65/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

  • 8/10/2019 Pre-Design Seminar.ppt

    66/77

    ARE Pre Design Seminar

    CIRCULATION CONCEPTS

  • 8/10/2019 Pre-Design Seminar.ppt

    67/77

  • 8/10/2019 Pre-Design Seminar.ppt

    68/77

  • 8/10/2019 Pre-Design Seminar.ppt

    69/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

  • 8/10/2019 Pre-Design Seminar.ppt

    70/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

  • 8/10/2019 Pre-Design Seminar.ppt

    71/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

  • 8/10/2019 Pre-Design Seminar.ppt

    72/77

    ARE Pre Design Seminar

    DFW Terminal D Parking Garage

    ENTRY ROADWAY CONCEPT DEVELOPMENT

  • 8/10/2019 Pre-Design Seminar.ppt

    73/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

  • 8/10/2019 Pre-Design Seminar.ppt

    74/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

    LIGHT POLES FRAMEENTRY WAY

    RECESSES PROVIDE

    VARIETY

    PLANTERS PROVIDE

    ATMOSPHERE

    TEXTURED PAVMENT

    RESTRICTS ROAD

    WIDTH AND

    CREATES RUMBBLE

  • 8/10/2019 Pre-Design Seminar.ppt

    75/77

    ARE Pre Design Seminar

    CONCEPT DEVELOPMENT

  • 8/10/2019 Pre-Design Seminar.ppt

    76/77

    ARE Pre Design Seminar

    CREDITS

  • 8/10/2019 Pre-Design Seminar.ppt

    77/77

    ARE Pre Design Seminar

    PROFESSIONAL SERVICES FEE SAMPLE PROBLEMA small museum Project has been awarded to your firm. The construction costs areprojected to be $5,600,000.00 and the client is not expecting to pay more than 8% inprofessional services fees. You will need standard Civil, Structural and MEP consultantengineering services.

    After analyzing the project and your staff available, you determine that you will need 1200man hours (66% of an internstime making a salary of $24.00/hr and 34% of a PA/PMstimemaking a salary of $38.00/hr) through Contract Documents and Bid Phase. The firmsmultiplier for overhead expenses is 2.8 times the individuals salary. All expenses arereimbursable but we have spent $10,000 chasing the project and doing marketingpresentations to win the project.

    Is the fee sufficient to do all normal professional services?

    If not what options would you pursue?