PRAVEEN PROJECT PORTFOLIO

17
PROJECT PORTFOLIO

Transcript of PRAVEEN PROJECT PORTFOLIO

Page 1: PRAVEEN PROJECT PORTFOLIO

PROJECT PORTFOLIO

Page 2: PRAVEEN PROJECT PORTFOLIO

HVAC PROJECT DETAILS

• Building Type : Office Building

• Location : Bangalore

• Floors : 3 Floors

• Area : 38,014 SF

• Cooling Load : 104.4 TR

• Comfort condition : 77°F with 50% RH

• Design Occupancy : 1008 People

• Operating Schedule : 6 Days /Week

• Air Distribution System : VAV Single Duct

Page 3: PRAVEEN PROJECT PORTFOLIO

TYPICAL FLOOR PLANSECOND FLOOR PLAN

Page 4: PRAVEEN PROJECT PORTFOLIO

HEAT LOAD REPORT

Page 5: PRAVEEN PROJECT PORTFOLIO

AIR DISTRIBUTION

• Ceiling suspended AHU is selected to distribute air & Comfort condition is ,

• 77°F with 50% RH, ADP is 54°F & 7500 CFM per AHU.

• Chilled water inlet 7°C & outlet is 15°C.

• VCD are placed at beginning of each duct.

• Backward curved aero-foil blade centrifugal fan for AHU.

BOS - BOTTOM OF SLABBOD - BOTTOM OF DUCTBOFC – BOTTOM OF FALSE CEILING

Page 6: PRAVEEN PROJECT PORTFOLIO

DUCT PRESSURE DROP ANALYSIS

• Pressure drop is due to bends and head.

• Based on pressure drop in Critical path AHU fan is selected.

• For efficient air flow through duct, pressure loss should be minimum.

Page 7: PRAVEEN PROJECT PORTFOLIO

CHILLER PLANT

• Total building load 104.4TR

• Diversity factor is 100%

• Water cooled screw chiller of 104.4TR

• Counter flow cooling tower for 104.4TR capacity.

Page 8: PRAVEEN PROJECT PORTFOLIO

PLUMBING

• 1% slope for sanitary pipes

• No 90°bends only Y fittings

Page 9: PRAVEEN PROJECT PORTFOLIO

ELECTRICAL SYSTEM

• Cables are sized and selected based on current flow by using standard catalogues

• Ladder type cable trays are used

• As per NBC lighting fixture is at 7 feet from floor

Page 10: PRAVEEN PROJECT PORTFOLIO

FIRE FIGHTING

• Fire fighting system is designed as per NBC standards for commercial building

• Pipes are sized based on number of sprinklers

• Sprinklers are placed effectively to cover entire area of the building

Page 11: PRAVEEN PROJECT PORTFOLIO

CO-ORDINATION OF ALL FLOORS

Page 12: PRAVEEN PROJECT PORTFOLIO

INTERFERENCE CHECK

• Interference check between MEP systems is performed

• Clashes are highlighted by ID

Page 13: PRAVEEN PROJECT PORTFOLIO

CLASH DETECTION AND SOLUTION

CLASH OF FIRE FIGHTING PIPE & DUCT

CLASH SOLVED BY MOVING FIRE FIGHTING PIPE

Page 14: PRAVEEN PROJECT PORTFOLIO

ANNOTATION

• Labels are created to annotate duct size and flow rate

• Diffusers are tagged with neck size and CFM

Page 15: PRAVEEN PROJECT PORTFOLIO

CREATION OF FAMILIES

• Designing of AHU with specified duct sizes and pipe connectors

• Designing of Air terminal with specified neck sizes

Page 16: PRAVEEN PROJECT PORTFOLIO

BILL OF QUANTITY

Page 17: PRAVEEN PROJECT PORTFOLIO