Località Location Philips Site, Leuven,Belgium
Cliente Client Stad Leuven/Sportavan nv., Belgium
Progettisti Design architects Arassociati Studio di Architettura, Milano M. Brandolisio, G. Da Pozzo, M. Scheurer, M. Tadini De Gregorio & Partners, Hasselt
Strutture Structural engineering Technum nv.
Impianti Technical engineering Technum nv./Axima Services
Imprese di costruzione Building company Groep Van Roey nv./Axima Services Realizzazione Completion time 2003 > 2005 Superficie costruita Built area 28.465m2
Costo complessivo Total cost €27.051.000,00
ArassociatiDe Gregorio & Partners
Sportplaza in Leuven
P h i l i p p e
V a n g e l o o v e n
1
Project report
100_111 Arassociati.indd 100100_111 Arassociati.indd 100 19 02 2007 20:07:2019-02-2007 20:07:20
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 2/12
100_111 Arassociati.indd 101100_111 Arassociati.indd 101 19 02 2007 20:07:3319-02-2007 20:07:33
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 3/12
102
P r o g e t t i
S p o r t p l a z a
a
L o v a n i o
P r o
j e c t s
S p o r t p l a z a
i n
L e u v e
n
1General view of parkcomplex
2Pianta del piano terra3Pianta del piano primo4Main hall; constructionphase of the outer ringand installation of steelbeams5Longitudinal sectionof the athletic complex
1 Vista generale delcomplesso dal parco2Pianta del piano terra3Pianta del piano primo4Aula principale;
fase di costruzionedell’anello esternoe della posa delle traviin acciaio5Sezione longitudinaledel complesso sportivo
2
3
0 5 20m
100_111 Arassociati.indd 102100_111 Arassociati.indd 102 19 02 2007 20:07:4119-02-2007 20:07:41
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 4/12
The building is set prominently in relation-
ship to the two constituent axes that order themasterplan of the Philips Site, a homogeneousformer industrial area now set aside for publicadministrative services and a city park.It was conceived as an exceptional form withinthe public area. It is an ellipses that forms an ex-posed brick monolithic volume that uses recog-nizable authority to resolve the urban relation-ships within the park and the diversities arisingfrom the multiple uses asked of its functionalprogram. The simplicity of the large structure’s
volumetric plan form is contrasted by a com-plex plan organized by a double-height gal-
lery/entrance, central to the building’s shorteraxis, distinctly dividing and distributing the two
main athletic facilities, one of which is a multi-
functional athletic area and the other a swim-ming area. In the 12 meter wide, 9 meter highgallery holds a café and lounge area, in additionto reception services and ticket offices.The main hall makes use of the undergroundbasement and a free height under 13 meterbeams. It can accommodate around 4,000 peo-ple in different configurations for basketballand various other indoor sports. It also can beused specifically for concerts and communityevents; the reinforced concrete background
wall adjacent to the gallery was conceived asa kind of large permanent set, made of a dou-
ble row of large windows above a balcony withmobile platforms.
P h i l i p p e
V a n g e l o o v e n
4
0 2 10m5
100_111 Arassociati.indd 103100_111 Arassociati.indd 103 19 02 2007 20:07:4719-02-2007 20:07:47
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 5/12
104
P r o g e t t i
S p o r t
p l a z a
a
L o v a n i o
P r o j e c t s
S p o r t p l a z a
i n
L e u v e
n
6Main hall; upper galleryand steel beam supports7 Main hall, comprehensive;interior view
6Aula principale;galleria superioreed appoggi delle travid’acciaio7 Aula principale, vistainterna complessiva
L’edificio è costruito in posizione preminenterispetto ai due assi costitutivi che ordinano l’in-tero masterplan del Philips Site, un’ex-area in-dustriale omogenea ora destinata a servizi pub-blici amministrativi e parco della città, perciòè stato pensato come forma eccezionale all’in-terno dell’area pubblica: un’ellisse che definisce
un volume monolitico in mattoni a vista, in gra-do di assolvere con riconoscibile autorevolezzasia i rapporti urbani all’interno del parco che lediversità derivate dai molteplici usi richiesti dalsuo programma funzionale.Alla chiarezza della forma planivolumetrica delgrande contenitore è contrapposta una piantacomplessa organizzata da una galleria-foyer adoppia altezza, centrale rispetto l’asse minoredell’edificio, che divide nettamente e distribui-sce i due impianti sportivi principali, deputati
uno alla sala sportiva polivalente e l’altro allazona natatoria. Nella galleria, larga 12 metried alta 9 metri, oltre ai servizi di accoglienzaed alle biglietterie è ubicato un bar con rela-tive zone soggiorno. La sala principale sfruttail basamento interrato ed ha un’altezza liberasotto trave di 13 metri, essa può ospitare circa
4000 persone nelle diverse conformazioni peril basket e per i vari sport al coperto ma preve-de la possibilità di un utilizzo anche specificoper concerti ed eventi collettivi; in tal senso,la parete di fondo realizzata in c.a. attigua allagalleria è stata pensata come una grande sce-na fissa rappresentata da un doppio ordine digrandi aperture sovrapposto ad una balconatacontenente le tribune mobili. Al lato opposto in-
vece, sfruttando la concavità della curva, è statoprogettato un elemento caratterizzante, quasi
P h i l i p p e
V a n g e l o o v e n
6
100_111 Arassociati.indd 104100_111 Arassociati.indd 104 19 02 2007 20:07:5119-02-2007 20:07:51
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 6/12
P h i l i p p e
V a n g e l o o v e n
7
100_111 Arassociati.indd 105100_111 Arassociati.indd 105 19 02 2007 20:08:0119-02-2007 20:08:01
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 7/12
106
P r o g e t t i
S p o r t
p l a z a
a
L o v a n i o
P r o j e c t s
S p o r t p l a z a
i n
L e u v e
n
8Swimming pool hall;
installation of beamsof glulam roof 9Cross section along thecentral distribution gallery10Swimming pool area;interior view of thecompetitive area and theplay area in the background
On the opposite side, making use of the curve’s
concavity, a distinctive, almost sculptural, el-ement was designed for the training wall forfree climbing. The hall has mobile platformsto give the parterre optimal flexibility. It is54x42m with the platforms closed or 39x27m
with them open. The swimming pool area is 9meters high, divided in two parts. One is a rec-reational area with water play equipment andthe other is more specialized for swimming anddiving, edged by reinforced concrete stands forthe public. The first area relates directly withthe gallery and becomes an additional attrac-tion for the café users. The second, though it
is made in the same undivided area is moreprivate and has a view to the outdoors througha large window. The three levels in which thesports complex is organized also hold trainingspaces for specific sports and for athlete warm-ups, changing rooms, storage areas, rest andrecreation areas, and a restaurant with a sce-nic terrace on the first floor overlooking theentrance’s central square, and a fitness center
with a terrace facing the park.The building is set on a larger axis of 140.80meters and a smaller one of 102.80 meters on
which the three macrostructures are arranged:
the through gallery and the two main halls built with a mixed system of reinforced concrete
walls and beams with a 6 meter main module.
The halls’ roof is made with a system of single-truss beams with diverse materials: steel gridbeams for the sports complex with a net spanof 60 meters and a variable height of 3-2.20m.For the swimming pool, full glulam beams wereused (for enhanced resistance to moisture andfor maintenance purposes) with a 35 metersspan, 3-2.50m high.The entire building is made of reinforced con-crete with an extensive use of prefabrications.The outside perimeter is made with industrial-ized panels clad in exposed brick, and unfin-ished materials, intentionally left unadorned to
keep manufacturing costs down.The outside architecture is intentionally simpleand straightforward, keeping with the homog-enous pattern of the red brick in a traditionallocal color. It moves symmetrically and slightlyupwards to determine the ellipses curves (low-er at the center, 10 meters, and higher at theopposite ends.). This gives the zinc roof a supplemovement marked along the gallery’s axis by ablack technical volume.Seen from the park, the sports complex is edgedand supported by a wide natural stone base thatprogressively adapts to the ground’s contours,
strengthening the idea of the ellipsis as an ex-ceptional constructive act of this new city part.
P h i l i p p e
V a n g e l o o v e n
8
100_111 Arassociati.indd 106100_111 Arassociati.indd 106 19 02 2007 20:08:0819-02-2007 20:08:08
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 8/12
8Aula delle piscine;posa delle travi di coperturain legno lamellare9Sezione trasversale lungola galleria centrale didistribuzione10Aula delle piscine, vistainterna della zona agonisticae sullo sfondo l’area ludica
9
0 2 10m
P h i l i p p e
V a n g e l o o v e n
10
100_111 Arassociati.indd 107100_111 Arassociati.indd 107 19 02 2007 20:08:1319-02-2007 20:08:13
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 9/12
108
P r o g e t t i
S p o r t
p l a z a
a
L o v a n i o
P r
o j e c t s
S p o r t p l a z a
i n
L e u v e
n
InformazioniInformation
Facciata in pietra Brick factory
Façade stone Vandersanden
Rivestimento copertura PVC Alkorplan
Roof finishing
Tribune telescopiche Jezet Seating
Telescopic tribune
Sedute Jezet Seating
Seatings
Rivestimento piscina InterbauTiles swimmingpool Blink
Strutture in legno Korlam
Wooden structures
Struttura metallica Timmers
Metal structure
Pavimentazione sportiva Tarkett-Sommer
Sports flooring
Porte e serrature esterne Gijmacon
Outdoor windows and doors Schüco
11
View of central gallery onground floor where the caféand restaurant are located12Main hall; detail of steelbeam macro structureand systems13External view of semi-circleand basement of the urbanarea with skating field
P h i l i p p e
V a n g e l o o v e n
11
100_111 Arassociati.indd 108100_111 Arassociati.indd 108 19 02 2007 20:08:2019-02-2007 20:08:20
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 10/12
11 Vista della galleria centraleal piano terra in cui sonodislocati il bar e il ristorante12Aula principale;dettaglio della macrostruttura in travi d’acciaioe degli impianti13
Vista esterna dell’emicicloe del basamento dalla zonaurbana con lo skating-field
scultoreo, deputato alla parete d’allenamentoper l’arrampicata libera. La sala è fornita di tri-bune mobili per garantire la massima flessibili-tà del parterre: 54,00x42,00m con tribune chiu-se o 39,00x27,00m con tribune aperte. L’auladelle piscine natatorie è alta 9 metri ed è divisain due parti: un’area ludica con giochi d’acquaed una più specialistica per il nuoto ed i tufficontornata da balconate in c.a. per le tribune delpubblico. La prima è in relazione diretta con lagalleria in modo da essere anche attrazione peri fruitori del bar, mentre la seconda pur essendorealizzata nello stesso ambiente indiviso è piùriservata e si apre, tramite una grande vetra-ta, sul panorama esterno. Nei tre livelli in cui èorganizzato il palazzo dello sport trovano postoinoltre altri spazi palestra per sports specifici eper il riscaldamento degli atleti, spogliatoi, ma-gazzini, aree di riposo e ricreazione oltre, al pri-mo piano, un ristorante con terrazza panorami-
ca prospettante sulla piazza centrale d’ingressoed un centro fitness con terrazza rivolta invece verso il parco.L’edificio è dimensionato su un’asse maggioredi 140,80 metri e su uno minore di 102,80 suiquali sono disposte le tre macrostrutture dellagalleria passante e delle due aule principali rea-lizzate con un sistema misto di muri e pilastri inc.a. con modulo prevalente di 6 metri.
11
La copertura delle aule è realizzata con un si-stema di travi monocampata differenziato neimateriali: travi reticolari in acciaio per il pala-sport con luce netta di 60 metri ed altezza va-riabile 3-2,20m mentre per la piscina sono sta-te utilizzate travi piene in legno lamellare (permaggiore resistenza all’umidità ed esigenze dimanutenzione) di 35 metri di luce alte 3-2,50m.Tutto l’edificio è realizzato in c.a. con un am-pio uso della prefabbricazione, in particolareil perimetro esterno è realizzato con pannelliindustrializzati rivestiti in mattone faccia a vi-sta, e materiali grezzi mantenuti al rustico percontenere i costi di realizzazione. L’architetturadell’esterno è volutamente semplice e lineare,coerente con la trama omogenea del lateriziorosso nella tipica tonalità locale e si muove sim-metricamente e lievemente in altezza caratte-rizzando le curve dell’ellisse (più basse al cen-tro 10 metri, e più alte agli antipodi 12 metri);
ciò conferisce un sinuoso movimento anche al-la copertura in zinco segnata lungo l’asse dellagalleria dal nero volume tecnico.
Visto dal parco il palazzo dello sport è contorna-to e supportato da un largo basamento in pietranaturale che progressivamente si adatta allecurve di livello del terreno rafforzando l’ideadell’ellisse come atto costitutivo eccezionale diquesta nuova parte di città.
P h i l i p p e
V a n g e l o o v e n
12
100_111 Arassociati.indd 109100_111 Arassociati.indd 109 19 02 2007 20:08:2319-02-2007 20:08:23
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 11/12
110
P r o g e t t i
S p o r t p l a z a
a
L o v a n i o
P r
o j e c t s
S p o r t p l a z a
i n
L e u v e
n
P h i l i p p e
V a n g e l o o v e n
12
100_111 Arassociati.indd 110100_111 Arassociati.indd 110 19 02 2007 20:08:3219-02-2007 20:08:32
7/25/2019 Prar015
http://slidepdf.com/reader/full/prar015 12/12100_111 Arassociati.indd 111100_111 Arassociati.indd 111 19 02 2007 20:08:3919-02-2007 20:08:39