Präsentation VMware

54
vCenter Management Overview Florian Benne EMEA Product Marketing [email protected]

description

 

Transcript of Präsentation VMware

Page 1: Präsentation VMware

vCenter Management Overview

Florian Benne

EMEA Product Marketing

[email protected]

Page 2: Präsentation VMware

22

Today’s Agenda

The Promise of Virtualization Management

The Customer Journey

• Basic Management

• Infrastructure Management

• Dev/Test

• Disaster Recovery

• Private Cloud

vCenter Benefits

Page 3: Präsentation VMware

33

The Goal

IT asService

Provider

Just like…..

Inexpensive, pay as you go, pay for what you use

Ubiquitously available

Reliable

Choice of providers

Page 4: Präsentation VMware

44

The Management Challenge Today

• Server• Storage• Network• etc

Component-LevelManagement

Service-LevelManagement

IT manages infrastructure components

IT is measured on business outcomes

Reliable email service

Page 5: Präsentation VMware

55

Virtualization Fundamentally Changes the Game

New Considerations… New items and relationships not

present in physical environment

Dynamic and fast growing environment VMsVMs

Snapshots & Clones

Snapshots & Clones

TemplatesTemplates

…and New Opportunities! Enables greater automation

Properties solve IT management problems in a new way

Page 6: Präsentation VMware

66

Virtualization Fundamentally Changes the GameNew Constructs The ability to make apps

self-describing, self-deploying

Allows management of multi-tier applications as a single entity

Utilizes industry standard OVF to provide instructions on how to deploy

Simpler, application centric view of management

Applications can now be written to monitor and scale themselves

vApp

App

OS

App

OS

App

OS

Availability = 99.99%

Security = High

Performance = 500 msec

SLA Definitions

Page 7: Präsentation VMware

77

VMware Uniquely Enables Service-Level Management

The Only Complete Stack for the Private Cloud

VMware vSphere 4The industry’s leading virtualization platform

vCenter Product FamilyUnified control center for SLA-driven

management across dynamic infrastructure

Page 8: Präsentation VMware

88

vCenter Management Product Family

Page 9: Präsentation VMware

99

VMware vCenter Product Family Delivers

•Drives operational efficienciesand savings

•Reduces opex by 50%

•Leverages power of virtualization•Delivers broadest and deepest capabilities for service-level management

•Enables IT to change and respond quickly

•Works with all ESM tools for seamless end-to-end datacenter management

Page 10: Präsentation VMware

1010

Today’s Agenda

The Promise of Virtualization Management

The Customer Journey

• Basic Management

• Infrastructure Management

• Dev/Test

• Disaster Recovery

• Private Cloud

vCenter Financial Impact

Page 11: Präsentation VMware

1111

Customer Needs on the Path to 100% Virtualization

Managehypervisors, VMs and dev/test environments

• P2V• Inventory Mgt• Planning• Patching

Phase 1 - Explore

< 100 VMs

Manage large, dynamic, shared infrastructure including

enterprise applications

• Performance Mgt• Capacity Planning• Configuration Mgt• Operations Mgt• Disaster Recovery

Phase 2 - Expand

100 – 1,000 VMs

Manage service levels with policy-driven automationacross the private cloud

• Self Service IT• Service Mgt• Chargeback

Phase 3 - Standardize

> 1,000 VMs

Existing Partner Management Solutions

Page 12: Präsentation VMware

1212

VMware vCenter Management Platform

Unified control center •Inventory management•Alarms, alerts•Templates/provisioning•Includes:

• P2V Conversion• Automated patch

management• Real-time policy

framework

Page 13: Präsentation VMware

1313

vCenter Server: A Key Infrastructure Component

vCenter Server Heartbeat

Page 14: Präsentation VMware

1414

Non-Virtualized Non-Virtualized

Physical-Only Environments/

Non-x86/Non-VMware

End-to-End Integrated Management

Systems Management

vCenter ExtensibilityAPIs and UI plug-in architecture

to enable 3rdparty integration

Self Service Portal Service Catalog

Billing/Chargeback

Provisioning Configuration Capacity Operations Performance Availability

Page 15: Präsentation VMware

1515

Big 4 and Ecosystem Integrations with vCenter Server

Area

Performance & Availability

Configuration

Provisioning

Capacity

Automation

Chargeback

……

Page 16: Präsentation VMware

1616

Today’s Agenda

The Promise of Virtualization Management

The Customer Journey

• Basic Management

• Infrastructure Management

• Dev/Test

• Disaster Recovery

• Private Cloud

vCenter Financial Impact

vCenter Partner Ecosystem

Page 17: Präsentation VMware

1717

Typical Challenges

Have dynamic changes to virtual entities resulted

in configuration drift?

When will I run out of capacity?

Do I have enough capacity to support service levels?

Can I reclaim unused or over-provisioned capacity?

Can I confidently virtualize my business critical apps?

How do I track entities, relationships and actions?

Are VMs configured in compliance with operational and security best practices?

Have unauthorizedchanges been made?

How do I scale my virtual environment?

Page 18: Präsentation VMware

1818

vCenter for Infrastructure Management

• Automated provisioning• Capacity management• Configuration management• Application performance

management

Page 19: Präsentation VMware

1919

vCenter Lifecycle Manager

BenefitsStandardizationEnforce consistent process to request, provision, deploy and decommission virtual machines

Control and VisibilityOptimize resource utilization for greater ROI

Automated WorkflowsEliminate repetitive VM lifecycle management tasks for greater productivity

Automate provisioning and decommissioning workflows,

increase service levels and IT control.

Automate provisioning and decommissioning workflows,

increase service levels and IT control.

Key FeaturesEasy-to-use web interface for centralized management, approval and tracking of VM requests

Auto-provision, deploy and decommission VMs based on pre-defined policies

Apply lifecycle management policies to existing VMs

Seamlessly integrate with 3rd party tools

VM Request

Policy

Page 20: Präsentation VMware

2020

“In our major data centers, we’ve now decommissioned more machines than we have running. That represents a huge cost savings in capacity. In our major data centers, if we had not had a good way of governing when a virtual machine was no longer being used, we probably would now have more than 1,000 extra virtual machines running.”

David HewettSenior IT ManagerQualcomm

Lifecycle Manager at Work

Page 21: Präsentation VMware

2121

Lifecycle Manager with BMC Software

Lifecycle ManagerIntelligentDeploymentIntelligent

DeploymentConfigure

VMConfigure

VM VerifyVerifyInitiateProvisioning

InitiateProvisioning

RequestBMC

Change RequestChange Request

ChangeApprovalChange

ApprovalUpdateCMDB

UpdateCMDB

Verify /Notify

Verify /Notify

CloseChange Task

CloseChange Task

Service DeskService Desk

Page 22: Präsentation VMware

2222

vCenter AppSpeed Overview

BenefitsReal-time view of end-user application performance, monitoring against SLAs

Dramatically reduces trouble shooting time and finger pointing

100% non-intrusive

Integrated into vCenter Server and vSphere Client

Reduces barriers to virtualizing business-critical applications

Manage performance of virtualized multi-tier applications

Manage performance of virtualized multi-tier applications

Key Features

Dynamically discovers and maps virtual and physical infrastructure elements

Breaks down application latency into component parts (infrastructure, network, and application)

Application

Page 23: Präsentation VMware

2323

“Data collected by AppSpeed will save hours in monitoring, troubleshooting and identifying root-cause of potential issues with application performance.”

Ken Horn Servers and Groupware TechnologiesJohnson & Wales University

AppSpeed at Work

Page 24: Präsentation VMware

2424

VMware vCenter CapacityIQ Overview

Benefits

Deliver the right capacity at the right time

Make informed planning, purchasing, and provisioning decisions

Enable capacity to be utilized most efficiently and cost-effectively

Analyze, forecast, and plan virtualized datacenter or desktop capacity

Analyze, forecast, and plan virtualized datacenter or desktop capacity

Key Features

Perform “What-If” impact analysis to model effect of capacity changes

Identify and reclaim unused capacity

Forecast timing of capacity shortfalls and needs

Coming Soon

Page 25: Präsentation VMware

2525

vCenter ConfigControl Overview

Discover, track, model, search, analyze (impact and drift), report

Standards based, extensible, comprehensive, continuous, multi-source capture of CIs

Applications, inside guests, virtual entities, associated hw, custom tags

Rollup impact reporting by business unit, organization unit, etc

Tracking of configuration items that are part of a virtual infrastructure

Automated discovery of accurate config, dependency and historical data

Application/IT visibility via rich modeling capabilities, dynamic search and reports

Ensure Visibility and Control of Dynamic Virtual EnvironmentsEnsure Visibility and Control of Dynamic Virtual Environments

Coming Soon

Page 26: Präsentation VMware

2626

Today’s Agenda

The Promise of Virtualization Management

The Customer Journey

• Basic Management

• Infrastructure Management

• Dev/Test

• Disaster Recovery

• Private Cloud

vCenter Financial Impact

vCenter Partner Ecosystem

Page 27: Präsentation VMware

2727

Typical Dev/Test Infrastructure is an IT Headache

Server sprawl – under desks, in closets

Aging, cast-off hardware

Dirty systems – inability to maintain “clean state”

Users and IT bogged down in provisioning requests

Release management is resource intensive and error-prone

*Actual customer photos*Actual customer photos

Page 28: Präsentation VMware

2828

vCenter for Dev/Test

Automated set up, tear down and management of complex dev/test environments

Page 29: Präsentation VMware

2929

vCenter Lab Manager Overview

Benefits

Higher Service LevelsReduce dependency on IT, enable greater productivity and faster time to market

Lower Infrastructure CostsPolicy-based access control of shared resources

Automated ManagementEliminate repetitive provisioning and ad-hoc management tasks for IT

Simplify management of the internal cloud for dev/test

Simplify management of the internal cloud for dev/test

Key FeaturesSelf-service portal for non-IT users to provision VM configurations in seconds, while ensuring IT control

Image Library to reduce storage footprint, improve asset sharing and team collaboration

Allocate resource containers to users groups and enforce policy-based access control

Page 30: Präsentation VMware

3030

“VMware Lab Manager obsoletes many manual processes and lets us be more pro-active and innovative. I can't think of any other product, process or project that has had a greater impact in our daily activities. Everything just runs with little interference. Lab Manager will be key to the future success of software development in Avaya.”

Jay M. LeoneLab ManagerAvaya

Lab Manager at Work

Page 31: Präsentation VMware

3131

Today’s Agenda

The Promise of Virtualization Management

The Customer Journey

• Basic Management

• Infrastructure Management

• Dev/Test

• Disaster Recovery

• Private Cloud

vCenter Financial Impact

vCenter Partner Ecosystem

Page 32: Präsentation VMware

3232

Requirements for Disaster Recovery Solutions

Minimize Downtime

93% of companies that lost their data center for ten days or more due to a disaster filed for bankruptcy within one year of the disaster.

--National Archives and Records Administration

Control Cost

Minimize Risk

73% of executives expressed concern with the costs associated with maintaining a secondary data centre

--Beacon Technology Partners

92% of users surveyed acknowledged that their companies would face serious consequences if they had to implement their disaster recovery plans.

--Dynamic Markets Ltd.

Effective disaster recovery is a business imperative,

but is very difficult to achieve

Page 33: Präsentation VMware

3333

Challenges of Traditional Disaster Recovery

Complex recovery processes and infrastructure

Complex recovery processes and infrastructure

Dependent on perfect training, documentation, and execution

Dependent on perfect training, documentation, and execution

Failure to meet recovery requirements

> Recovery takes days to weeks

> Recovery tests often fail

> Significant IT time and resources consumed

Failure to meet recovery requirements

> Recovery takes days to weeks

> Recovery tests often fail

> Significant IT time and resources consumed

??

????

????

????

??

Page 34: Präsentation VMware

3434

vCenter for Disaster Recovery

Policy-driven workflows for automated site recovery

Page 35: Präsentation VMware

3535

Simplifies and automates disaster recovery workflows:

Setup, testing, failover

Turns manual recovery runbooks into automated recovery plans

Provides central management of recovery plans from the vSphere Client

VMware vCenter Site Recovery Manager Overview

Works with vSphere to make disaster recovery rapid, reliable, manageable, affordable

Site Recovery Manager leverages vSphere to deliver advanced disaster recovery management and automation

Page 36: Präsentation VMware

3636

Site Recovery Manager at Work

“If your organization is already taking advantage of virtualization, then adding Site Recovery Manager to handle disaster recovery is a no-brainer.”

Jerry WilkinSenior Systems Administrator, Dayton Superior Corporation

Page 37: Präsentation VMware

3737

Today’s Agenda

The Promise of Virtualization Management

The Customer Journey

• Basic Management

• Infrastructure Management

• Dev/Test

• Disaster Recovery

• Private Cloud

vCenter Financial Impact

vCenter Partner Ecosystem

Page 38: Präsentation VMware

3838

vCenter for the Private Cloud

• Service catalog• Self-service• Chargeback

Page 39: Präsentation VMware

3939

VMware’s Vision for Self-Service

Zone 1Locked Down for Production

Resources

Access ControlLDAP Group

Self-Service Policy

Read only. VI Admin approval required

for all actions

Zone 2Hybrid for

Pre-Production

Resources

Access ControlLDAP Group

Self-Service Policy

Leases > 30 days require approval

Access ControlLDAP Group

Self-Service Policy

Full self-service with chargeback

Resources

Templates

Zone 3Internal Cloud

for dev/test/demo

TemplatesTemplates

VM Users app owners, test/dev,

trainers, etc.VI Admin Segments

infrastructure into zones with people, resources and self-service provisioning policies that match use cases

Achieves maximum efficiency, predictability and control

VM Users Access to VMs and

monitoring data (performance, chargeback) via unified interface

Self-service provisioning and sandboxing enhances productivity across application lifecycle

Page 40: Präsentation VMware

4040

vCenter Chargeback Overview

Benefits

Improve Resource Utilization: By associating costs to VM’s many of the “free” VM’s will go away, freeing up resources for higher priorities

Optimization of Budgets: Business units can understand how much they are paying for resources and how much goes to unused, allowing them to optimize resource consumption & costs

Account, monitor, and report on costs associated with virtual resources

Account, monitor, and report on costs associated with virtual resources

Key Features

Fixed, allocation, and utilization based costing

Charge different amounts for tiers of infrastructure

Schedule reports & email results

Page 41: Präsentation VMware

4141

Today’s Agenda

vCenter Management Vision

The Customer Journey

• Basic Management

• Development & Testing

• Infrastructure Management

• Disaster Recovery

• Private Cloud

vCenter Benefits

Page 42: Präsentation VMware

4242

Accelerating the Path to 100% Virtualization

Lifecycle Manager

Drive VM consistency at the front end of the scale out initiative - ensure that VMs are provisioned, placed and decommissioned in compliance with IT policies

AppSpeed

Plan for deploying tier 1 apps - evaluate which apps and databases are good candidates.

Assured migration of business-critical applications from physical to virtual

Chargeback

Put cost structure in place prior to virtualization growth; get ahead of the curve with better understanding of usage and cost.

CapacityIQ (coming soon)

Model the impact of introducing new applications for better planning and preparedness

Ensure sufficient ongoing capacity to meet application SLAs

ConfigControl (coming soon)

Ensure configurations of dynamic virtual entities remain compliant

Reduce downstream management effort by standardizing configurations

Page 43: Präsentation VMware

4343

Top 3 Reasons Why VMware is the Right IT Investment in a Tough Economic Environment

Minimize Lost Revenue Due to Downtime3

Reduce Datacenter Operating Cost (e.g. Power & Cooling)

2

Reduce Physical Infrastructure Cost1

Page 44: Präsentation VMware

4444

Before After

Business Loss Due to Datacenter Outage**Sys Admin per 100 Apps*

* Source: IDC and VMware TAM program** Source: VMware customer – a $2bn insurance company. Estimates based on 40 hrs needed to recover before virtualizing and 4.5 hrs needed for the same recovery after virtualization.

Infrastructure Cost per App

Before After

Reduction in Datacenter Capital Expense

2.0-3.02.0-3.0

Before After

$14,235$14,235

$5,694$5,6940.3 – 1.00.3 – 1.0

Reduction in Datacenter Operating Expense

$30 MM$30 MM

$4 MM$4 MM

Reduction in Risk

VMware Delivers Tangible Business Outcomes

Page 45: Präsentation VMware

4545

vCenter Management Product Family

Page 46: Präsentation VMware

4646

Thank You!

Page 47: Präsentation VMware

4747

Appendix Slides

Page 48: Präsentation VMware

4848

vCenter Chargeback Overview

Page 49: Präsentation VMware

4949

Chargeback Hierarchy

Flexible model for determining cost accounting structure

Cost Centers, Organizations, Business Units, VM types, etc.

Single chargeback hierarchy spans multiple vCenters for enterprise-wide management

Hierarchy model provides the basis for determining costing structures and delivery reports

Drag-n-dropDrag-n-drop

2020

Page 50: Präsentation VMware

5050

Costing Models

Start simple and move to a advanced chargeback model over time

Compare between models by configuring different reporting options

Ensure the chargeback model can align with organizational requirements

Flexible costing options mix & match between models

Fixed Costing

Fixed cost for a VM instance

Allocation Based Costing

Variable costs per VM based on allocated resources

Utilization Based Costing

Variable costs per VM based on utilized resources

2121

Page 51: Präsentation VMware

5151

vCenter Lab Manager Overview

Page 52: Präsentation VMware

5252

What’s New in Lab Manager 4.0?

Unification of Lab Manager & Stage Manager Functionality

One solution for Dev/Test, Pre-Production, Support, Demo & Training

Multiple Workspaces within an Organization provide resource and access containers

Move VMs between workspaces and apply new access policies without changing configuration settings

Support for vSphere 4 & ESXi

Leverage the most advanced virtualization platform

Next-Generation Network Fencing

Isolated network configurations now can span multiple hosts

Useful for deploying large VM configuration clones

Requires vNetwork Distributed Switch (DVS)

Engineering

App Team

QA

Integration Staging

IT Ops

Prod

Sales

Training

Support

SE Demo

ResourcesAccess Control

LDAP Group

Image Library

2424

Page 53: Präsentation VMware

5353

vCenter AppSpeed Overview

Page 54: Präsentation VMware

5454

vCenter AppSpeed Use Scenarios

Allows IT to guarantee application service level

Migrate applications from physical to virtual

Discover and Map

Monitor performance

Analyze Root Causes

Remediate Problems

Develop pre-virtualization end-user application baseline

Measure post virtualization performance

1

2