PROFILE – TAMIL NADU
Area 1,30,058 sq.km
Population
(as per Census 2011) 7,21,38,958
Urban Population (as per Census 2011)
3,49,17,440
(48.40%)
Urban Slum Population
(as per Census 2011)57,98,459
(8.04%)
Total -666
Corporations -
12
Municipalities-124
Contonment
Boards -2
Town Pan chayats-
528
Statutory Towns
Tamil Nadu Slum Clearance Board was established in September, 1970.
It is the oldest organization of its kind, looking after the welfare measures exclusively of slum dwellers.
Has constructed 1.69 lakhtenements/houses under various state/central schemes.
Has provided 1.32 plotted development units.
Is the SLNA for PMAY-HFA
TAMIL NADU SLUM CLEARANCE BOARD
ACHIEVEMENTSInitially, In-situ rehabilitation of slums in Chennai city was undertaken utilizing
State Budgetary support.
Plotted development was implemented under MUDP
Board’s activities were extended to other ULBs of the State.
Tiled roof sheds were provided under Mass Housing programme.
Plotted development under TNUDP, Cash Loan scheme for construction of
individual houses, Nehru Rozkar Yojana for up-gradation of houses were
implemented.
Fire proof Asbestos sheet roofed sheds were provided in the slums of certain
selected cities.
Valmiki Ambedkar Awas Yojana (VAMBAY) was implemented.
Construction of tenements under centrally sponsored Finance commission
schemes was undertaken
Construction of tenements / houses under ETRP and RGRP were carried out.
Has constructed 42318 tenements under JNNURM.
Works for construction of 4880 tenements/houses under RAY are either
completed or nearing completion.
Now, PMAY – HFA is being implemented.
4
1970 Tamil Nadu Slum Clearance Board established
1971 Tamil Nadu Slum Clearance Board Act enacted
1971 Commenced the construction of tenements and provided slum
improvement without land tenure in Chennai
1977 Slum Improvement land tenure in Chennai
1984 Construction of tenements and slum improvement without land tenure and
other activities extended to other Corporations, Municipalities in phases
1985 Implementation of massive tiled roof houses
1987 Slum Improvement with land tenure in Chennai and other towns.
1992 Construction of MIG / LIG houses under urban renewal programme
1995 Rehabilitation and Resettlement schemes through Finance Commission
grants and other sources
2008 Commencement of massive resettlement schemes under JNNURM
2012 VISION 2023 - Slum Free cities
2015 Housing for All programme to attain Slum Free Cities
CHRONOLOGICAL EVENTS
Chairman
Managing Director
Secretary Chief Engineer Financial Adviser
Superintending
Engineer,
Chennai Circle-I
Superintending
Engineer,
Chennai Circle-II
Superintending
Engineer,
Chennai Circle-III
Superintending
Engineer,
Madurai Circle
Superintending
Engineer,
Coimbatore Circle
Executive
Engineer,
Vellore, Marina
Reconstruction,
Kancheepuram
Executive
Engineer,
Divisions 2, 5, 6,
Chennai Special
Dn-1 & Cuddalore
Executive
Engineer,
Divisions 1, 3, 4,
Reconstruction
North
Executive
Engineer,
Madurai, Trichy,
Tirunelveli
Executive Engineer,
Coimbatore,
TiruppurDn
Executive
Engineer
(Planning)
Executive
Engineer (HFA)Deputy Planner Chief Community
Development
Officer
Executive Engineer
(SQC)
Tamil Nadu Slum Clearance Board
Organisation Chart
6
15 Estate OfficersAO
Asst. Secretaries
(Admin, Plots, Tenements)
PRADHAN MANTRI AWAS YOJANA –
HOUSING FOR ALL (URBAN) PMAY – HFA(U)
Launched on 25th June, 2015
Mission Period: 2015-2022
Coverage: All houseless citizens in slums and non slum urban areas.
Implementation Methodologies through four Verticals
7
IIn-situ Slum Redevelopment (ISSR)
(GoI grant: Rs. 1.00 lakh per unit)
IICredit Linked Subsidy Scheme – Interest Subsidy on Housing
Loans for EWS/LIG/MIG categories
IIIAffordable Housing in Partnership (AHP)
(GoI grant: Rs. 1.50 lakh per unit)
IVBeneficiary Led Construction (BLC)
(GoI grant: Rs. 1.50 lakh per unit)
INSTITUTIONAL ARRANGEMENTS
Tamil Nadu Slum Clearance Board is designated as State Level Nodal Agency
(SLNA) for PMAY-HFA in Tamil Nadu.
State Level Sanctioning and Monitoring Committee (SLSMC) was constituted with
the Chief Secretary to Government as the Chairman, Secretary to Government,
Housing & Urban Development Dept., as Vice Chairman, Principal Secretary/
Managing Director, TNSCB as the Member/Convener and 12 other Secretaries /
Heads of organizations as members.
The State Level Appraising Committee (SLAC) is established.
The proposals and projects are to be scrutinized by the SLAC, approved by the
SLSMC and to be submitted to the Central Sanctioning & Monitoring Committee
(CSMC) for sanction and fund release.
8
DEMAND SURVEY
(as on 31.08.2017)
9
VerticalAs per
Total Demand Survey
CSC Online
I - ISSR 27300 41797 28240 97337
II - CLSS 147185 181096 149680 477961
III - AHP 266586 68351 6895 341832
IV - BLC 388103 74830 11546 474479
Total 8,29,174 3,66,074 1,96,361 13,91,609
Sl.
No.DESCRIPTION AHP BLC Total
1. No. of Projects 70 1620 1690
2. Dwelling Units 44770 339493 384263
3. Project Cost 4176.05 10285.62 14461.67
4. Central Share 671.54 5092.40 5763.94
5. State Share 2439.03 2036.96 4475.99
6.Beneficiaries
Share 1065.47 3156.27 4221.74
5763.94
4475.99
4221.74
Project cost(Rs.14461.67 Cr.)
GOI share
GOTN share
Beneficiaries share
Rs.in Crore
Projects Approved Under
PMAY (U) - HFA
Demand Survey Vs Approval
Total-829174
100%
ISSR -27300
AHP-266586
BLC-388103
CLSS-147185
Demand Survey Units approved so far
Total-387867
46.78 %
ISSR - 0
AHP-44770
16.79 %
BLC-339493
87.48%
CLSS-3604
2.45%
Progress of Projects
VerticalsHouses
ApprovedTendered
Work
order
Issued
Grounded/In ProgressComp
letedFoun-
dationLintel Roof Total
AHP 44770 20464 17120 7532 - 8944 16476 1168
BLC 339493 - 250384 75225 29876 35203 140297 28143
Total 384263 20464 267504 82757 29876 44147 156773 29311
CLSS No. of loan sanctioned 3604
Total Expenditure so far incurred Rs. 1588.25 Cr (AHP – 533.48 Cr & BLC – 1054.77 Cr )
44770
16476
1168
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
sanctioned
Progress
completed
339493
140297
28143
0
50000
100000
150000
200000
250000
300000
350000
sanctioned
Progress
completed
INTERFACE WITH MIS
Indicators Current Status (No.)
Survey entry made (%) 80.67 % ( 6,68,937/ 8,29,174)
Projects approved: 1690 (AHP – 70, BLC - 1620)
Projects entered (7A/B/C/D)
DUs approved AHP BLC Total
44,770 3,39,493 3,84,263
Beneficiaries attached 8,852( 19.70 %)
2,70,875( 79.70 %)
2,79,721( 72.80 %)
Houses geo-tagged Stage Geotagged : 2,66,045
No of Units covered : 1,89,611
Total fund transferred through DBT 1054.77 Cr
National Electronic Funds Transfer (NEFT) Yes
Indicators Current Status
Trainings and Workshops
• Trainings for Geo-tagging, MIS uploading &
PFMS conducted.
• Workshop for Emerging Technologies proposed
Exposure and Handholding
Visits
• To be undertaken
Third Party Quality Monitoring
Agencies (TPQMA)
• Agencies are engaged for ongoing AHP projects.
• Agencies are being fixed on commencement of works.
Social Audit • RFP will be called for engaging Independent
Facilitating Agency (IFA) by 1st week of Feb , 2018.
Information, Education &
Communication
• Standees and information banners displaying the
salient features of the mission are displayed at public
places where people confluence.
• Success stories are prepared narrating the outcome of
the avail of the mission’s benefits.
• Photographs of completed DUs are taken and
forwarded to GoI.
STATUS OF CAPACITY BUILDING PLAN
ESTABLISHMENT OF SLTC & CLTCS
Urban Planner/Town Planning Specialists
GIS Specialists
Capacity Building Specialists
Civil Engineer Specialists
Housing Finance and Policy Specialists
MIS Specialist
Social Development Specialists
Establishment of SLTC• SLTC established with 10
professionals.
Establishment of CLTCs • 34 CLTCs established as approved
PROGRESS OF VERTICAL –II (CLSS)
Indicators Current Status (No.)
Total Demand of CLSS As per Survey - 1,47,185
Through CSC - 2,43,392
Through Online - 35,079
Total no of Loans Sanctioned 3604 ( NHB –3578 , HUDCO - 26)
Loan Amount Rs. 568.45 Cr
Disbursed Amount Rs. 373.59 Cr
Subsidy Amount Rs. 61.42 Cr
4,25,656
Vertical III - AHP
Requirement of Houses under Vertical III - (AHP) : 2,66,586.
Projects approved so far for construction of 44,770 DUs under this Vertical
Availability of Government lands is a big challenge. TNSCB has been proposing
AHP Projects on the lands spared by Govt. and by redevelopment of dilapidated
tenements constructed four decades ago.
Government of Tamil Nadu provides Rs. 6.00 lakh per unit under this vertical.
TNSCB has proposed to adopt emerging technologies in the construction of
tenements.
BMTPC has undertaken Demonstration Housing Project for construction of 42 DUs
using GFRG techonogy at Thailavaram in Kanchipuram
Cont.,
Vertical III - AHP
TNSCB has been calling for tenders on Technology – Neutral basis for the projects
with DUs more than 500.
Construction of 2112 DUs in Kancheepuram using Monolithic Concrete Technology is
finalized and works commenced.
The share of State Government is heavy in addition to provision of land by the
Government at zero cost.
An ordinance to spare lands owned by GoI PSUs to SLNA will solve land issues to
some extent.
KESAVAPILLAI PARK
No. of Dwelling Units : 2592
DEVELOPMENT WORKS
Formation of BT road
Storm water drain
Pavement around the block inclusive of filling stone dust and gravel
Construction of sump and payment to corporation for water supply
connection and providing other structures.
Providing sewer lines with manholes U drain
Providing Sewage Treatement plant
Provision for street lighting arrangements and Transformer
Ration Shop
ICDS center
Shops
Provision for solid waste management
Development of the park with CPS equipments
Name Board and numbering the tenements
Provision for Rain Water Harvesting
Proposed development of affordable housing under
AHP at K.P.Park, Chennai No.of Units : 864 Project Cost. Rs.112.36 Cr.
Proposed development of affordable housing under
AHP at K.P.Park, Chennai No.of Units : 864 Project Cost. Rs.112.36 Cr
Proposed development of affordable housing under
AHP at K.P.Park, Chennai No.of Units : 864 Project Cost. Rs.112.36 Cr
Affordable Housing Project at Kancheepuram
using Monolithic Concrete Technolgy No.of Units : 2112 Project Cost. Rs.190.08 Cr
26
VERTICAL – III – AFFORDABLE HOUSING IN PARTNERSHIP
Manali New Town Phase –II - Chennai
No of Tenements 2992
Pattern of Development Stilt + 11 Floors
Extent of Land 19.91 Acre
Plinth Area 38.82 sqm (417.70sqft)
Projects Cost Rs.324.63Crore
GoI Share Rs. 44.88 Crore
Institutional Loan &
beneficiaries’ contribution Rs.279.75 Crore
Chennai
Manali New
Stilt + 11 floors
Typical floor Plan
29
Manali New Town Phase –II
Layout
VERTICAL – III – AFFORDABLE HOUSING IN PARTNERSHIP
Manali New Town Phase –II – Single Unit Plan
VERTICAL – III – AFFORDABLE HOUSING IN PARTNERSHIP
Manali New Town Phase –II – Single Unit Plan
Perspective view – Manali New Town Phase II in Chennai
(Stilt + 11) floors -2992 EWS flats)
33
VERTICAL – III – AFFORDABLE HOUSING IN PARTNERSHIP
Rajakkur Periyar Nagar Phase – II , Madurai
No of Tenements 1088
Pattern of Development G+3
Extent of Land 12.60 Acre
Plinth Area 37.24 sqm (400.70 sqft)
Projects Cost Rs.89.75 Crore
GoI Share Rs.16.32 Crore
GoTN Share Rs.54.40 Crore
Beneficiaries’ contribution Rs.19.03 Crore
34
Madurai City LPA
Relocation Site
Relocation Site
Rajakkur, Periyar Nagar
Phase – II
Proposed Tenement Block Layout
Rajakkur, Periyar Nagar Phase – II
-1088 unit
-1584 unit
NAGOORAN THOTTAM - CHENNAI
NAGOORAN THOTTAM - Type Design
Sl.No. Project CityNo. of
Units
Project
Cost (Rs.
in Crore)
Pattern
of
Develo
pment
Area / Unit (sft)Unit Cost
(Rs. in
Lakh)
Cost Per (in Rs.)
Plinth CarpetPlinth
Area
Carpet
Area
1. Nagooran Thottam Chennai 32 256.00 G + 3 388.58 291.16 8.00 2058.77 2747.63
2. Indira Gandhi Kuppam Chennai 256 2112.00 G + 3 355.86 299.78 8.25 2318.32 2752.01
3. Thailavaram Chennai 480 3951.58 G + 3 354.14 291.70 8.23 2323.94 2821.39
4. Kesavappillai Park Cheenai 864 7128.00 G + 3 350.48 277.28 8.25 2353.91 2975.33
5. Kovaipudur Coimbatore 672 5641.02 G + 3 400.00 291.70 8.39 2097.50 2876.24
6 ThiruViKa Nagar &
KallameduCoimbatore 356 2851.40 G + 3 400.00 291.70 8.01 2002.50 2745.97
7 Muthampalayam Bharathi
NagarErode 256 2127.07 G + 3 400.00 291.70 8.31 2077.50 2848.81
8 Bhavani Road Phase I Erode 448 3546.77 G + 3 400.00 291.70 7.92 1980.00 2715.11
9. Veerapandi Tiruppur 1280 9611.42 G + 3 396.87 273.84 7.51 1892.31 2574.56
10. Kottagoundampatti Salem 292 2494.47 G + 3 400.00 291.70 8.54 2135.00 3118.60
11. Kulavamedu Vellore 192 1590.23 G + 3 400.00 270.82 8.28 2070.00 2838.53
12. Dhobikana Vellore 224 1867.22 G + 3 400.00 270.82 8.34 2085.00 3079.53
13 Nagarajapuram & LBS
Phase III & IVNamakkal 1392 11116.48 G + 3 400.00 291.70 7.99 1997.50 2950.29
14 Vannarapettai (Dhobi
Colony)Tiruchirappalli 384 3159.38 G + 3 400.31 279.33 8.23 2055.91 2821.39
15 Nagamangalam MGR NagarTiruchirappalli 512 3701.35 G + 3 400.31 279.33 7.23 1806.10 2588.33
16 Narimedu Pudukkottai 1920 15058.14 G + 3 400.31 279.33 7.84 1958.48 2806.71
17 Sambathottam Nagappattinam 336 2602.36 G + 2 400.31 279.33 7.75 1936.00 2774.49
18 Pillayarpatti Ph III Thanjavur 256 1948.35 G + 3 400.31 298.81 7.61 1901.02 2724.37
19 Poonga Nagar Madurai 76 502.39 G + 3 345.73 226.95 6.61 1911.89 2212.11
20 Pattinamkathan Ramanathapuram 256 2112.00 G + 2 393.20 269.60 8.25 2098.17 3060.00
21 Periyar Nagar, Perumpallam
Odai & Karungalpalayam
Erode
1072 8844.00
G + 8,
G + 7 &
G + 3396.87 269.60 8.25 2078.76 3060.00
Total 11556 92221.63
Floor Area & Cost Details of AHP Projects under HFA
NAGAMANGALAM -MGR NAGAR – TRICHY
AHP Projects
NAGARAJAPURAM –NAMAKKALAHP Projects
POONGA NAGAR – MADURAIAHP Projects
AHP Projects
KOTTAGOUNDAMPATTY- SALEM
AHP Project
AHP Project
AHP Projects
KOVAIPUDUR - COIMBATORE
AHP Projects
THIRU Vi KA NAGAR –COIMBATORE
AHP Projects
VEERAPANDI - TIRUPPUR
AHP Projects
PILLAYARPATTI - THANJAVUR
NARIMEDU – PUDUKOTTAIAHP Projects
INDIRA GANDHI KUPPAM –CHENNAI
AHP Projects
Pre Fabricated structure at Vyasarpadi, Chennai.
( G+ 7 storey ) 960 EWS units, Project cost : Rs.112.00 Cr.,
Pre – Fabricated Structure at Moorthingar Street ,Chennai
PMAY HFA BLC Scheme – Anaiyur, Madurai
PMAY HFA BLC Scheme – Anaiyur, Madurai
CoimbatoreBLC Projects
56
CoimbatoreBLC Projects
57
ChennaiBLC Projects
ChennaiBLC Projects
ChennaiBLC Projects
BLC Project
BLC Project
BLC Project
BLC Project
ChennaiBLC Projects
TirunelveliBLC Projects
NagercoilBLC Projects
ThoothukudiBLC Projects
TirunelveliBLC Projects
74
PMAY – HFA Media Coverage
THANK YOU
76