Pr Rcl 03778 13 q 030 Controldedocumentosdeing

2
TOTAL AUSTRAL DOCUMENTATION APPROVAL APROVED WHIT OBSERVATIONS, CORRECT&ISSUE APPROVED APPROVED FOR CONSTRUCCTION EXCEPT OBSERVATIONS CORRECT&ISSUE APPROVED FOR CONSTRUCTION REJECTED CORRCT & ISSUE NAME SIGN DATE MECHANIC PIPING ELECTRICAL INSTRUM. CIVIL PROCESS QA-QC ENG.COORD ENG.MGR RECIVED: REMITED: APPROVAL BY TOTAL AUSTRAL DOES NOT DIMINISH ANY CONTRACTOR/VENDOR RESPONSIBILITY ON ITS CONTENT. 0 Para Aprobación CDC MAC MAC 15-10- 2013 Rev DESCRIPTION BY CHECK APPR. DATE OBRA PROYECTO TRASLADO TRAMPA GASODUCTO HP 10” CA TOTAL AUSTRAL TITULO: REGISTRO DE CONTROL DE DOCUMENTOS DE INGENIERIA Scale: S/E

description

control de documentos

Transcript of Pr Rcl 03778 13 q 030 Controldedocumentosdeing

PROCEDIMIENTO OPERATIVO ANTE EMERGENCIAS RADIOLOGICAS

REGISTRO

CONTROL DE DOCUMENTOS DE INGENIERIA

DOCUMENTO: PR-RCL-03778-13-Q-030 HOJA REV.

22 0

TOTAL AUSTRAL DOCUMENTATION APPROVALAPROVED WHIT OBSERVATIONS,CORRECT&ISSUEAPPROVEDAPPROVED FOR CONSTRUCCTION EXCEPT OBSERVATIONSCORRECT&ISSUEAPPROVED FOR CONSTRUCTIONREJECTEDCORRCT & ISSUENAMESIGNDATEMECHANICPIPINGELECTRICALINSTRUM.CIVILPROCESSQA-QCENG.COORDENG.MGRRECIVED:REMITED:APPROVAL BY TOTAL AUSTRAL DOES NOT DIMINISH ANY CONTRACTOR/VENDOR RESPONSIBILITY ON ITS CONTENT.0Para AprobacinCDCMACMAC15-10-2013RevDESCRIPTIONBYCHECKAPPR.DATE

OBRA PROYECTO TRASLADO TRAMPA GASODUCTO HP 10 CA TOTAL AUSTRALTITULO: REGISTRO DE CONTROL DE DOCUMENTOS DE INGENIERIAScale: S/EContract/P.O.NCall OutPR-RCL-03778-13-Q-030SHEET01 DE 02REV 0FIL: PR-RCL-03778-13-Q-030