[PPT]PowerPoint Presentation - Department of...
Transcript of [PPT]PowerPoint Presentation - Department of...
Phoenix Convention Center • Phoenix, Arizona
Energy Storage for Federal Installations
Track 10: Innovation Session 6
John SchaafJohnson ControlsAugust 12, 2015
Energy Exchange: Federal Sustainability for the Next Decade2
Energy Storage for Federal Installations
Agenda• Company Background• Energy Storage• Applications• Puerto Rico Army National Guard
Energy Exchange: Federal Sustainability for the Next Decade3
Delivering technologies and services that increase efficiency and lower operational and energy costs in buildings.
Creating workplaces that help people and businesses thrive.
The leading supplier of automotive starter batteries and advanced batteries for Start-Stop and hybrid systems.
A global leader in automotive seating and interiors including door and instrument panels, floor and overhead consoles and overhead systems.
Automotive Experience
Global WorkPlace Solutions Power Solutions
Building Efficiency
Johnson Controls Overview
Energy Exchange: Federal Sustainability for the Next Decade4
Power Solutions portfolio
Standard Starting Lighting &Ignition Batteries
Major OEMs include BMW, Bosch, Daimler, Ford, General Motors, Hyundai, Kia, Toyota, Volkswagen and SAIC
Major aftermarket retailers include Advance Auto Parts, AutoZone, Interstate, Sears and Walmart
AGM Technology
Largest provider of advanced lead-acid batteries for Start-Stop vehicles
Supplying more than 4.5 million Start-Stop batteries annually in Europe
Sold more than 18 million AGM batteries
Micro Hybrid Technology
A high power, compact, 48V Li-Ion technology that enables a very cost effective, low voltage hybrid solution for mass market adoption
15-20% fuel savings Dual voltage architecture
Stationary Storage and Electric Vehicle Technology
First to market mass production Li-ion battery in an automotive application
Production and fleet contracts include Mercedes Benz, XL Hybrids commercial vehicles, Odyne PHEV heavy duty vehicles and others
Pack assembly began in fall 2010. Cylindrical cell production started in 2011. Prismatic cell production is set for 2015
Energy Exchange: Federal Sustainability for the Next Decade5
Energy Storage and the Grid
The grid is inefficient and is being used differently
Generation Transmission Distribution Consumption
Behind the Meter
Energy Exchange: Federal Sustainability for the Next Decade6
Stationary Energy Storage System Description
Batteries
AC/DC Inverter
Building or Grid
Energy Exchange: Federal Sustainability for the Next Decade7
The basic components of an energy storage system
Common Battery Module
Purpose-built modular building and HVAC
Battery Management SystemBattery Management
System
System ControllerSystem Controller
VL41MLi-ion Cells
Johnson Controls content
Common Rack System (standard rack)
Energy Exchange: Federal Sustainability for the Next Decade8
Security and Safety
Modular systems installations should be protected by a comprehensive range of physical security, fire detection, alarm and suppression including:
• Access Control and Intrusion Detection
• Perimeter Fencing and Alarming, if needed
• IP Video Surveillance• Remote Monitoring• Fire detection and alarm• Fire Suppression
Energy Exchange: Federal Sustainability for the Next Decade9
Storage has the opportunity to create value
Provides load management that can move demand from the peak to off-peak hours of the day to take advantage of peak-to-non-peak price arbitrage
Defers capital expenditure for more power distribution or generation infrastructure caused by increased demand or various supply-demand load constraints along the grid
Replaces conventional load following generators in providing power output to match demand fluctuations
Corrects minute-to-minute fluctuations between load and output to maintain grid performance control standards
Provides immediate energy that is online and waiting to dispatched, if needed
Provides non-immediate energy that can be offline and available for production in under 10 minutes
Description
Load Shifting Peak load shifting
Supplemental reserve
Spinning reserve
Load following
Frequency regulation
Voltage regulation
Congestion relief and T&D infrastructure upgrade
Firming of renewable resource capacity
Renewable energy time shift
Backup power
Grid stability
Capital deferral
Renewable asset
optimization
Injects and absorbs of power to maintain required transmission system voltages
Provides capacity reserves to alleviate resource intermittency
Provides capacity to shift renewable resource output from off-peak production periods to on-peak demand periods
Energy Exchange: Federal Sustainability for the Next Decade10
Additional Considerations for Storage
How do you get highest performance and lowest lifecycle cost?
Experience Experience
with building profiles and utility cost data
Efficient Program Management
Experienced in performance contracting and leasing structures
Market Interface Business and
technology interface to utility markets through Demand Response programs
Manufacturing Validate system
performance, not just component performance
Understand the source and ownership structure of all major components
Service Warranty Global service
infrastructure Number of trucks in
service Predictive diagnostics
and remote monitoring
Energy Exchange: Federal Sustainability for the Next Decade11
Puerto Rico Army National Guard - ESPC
Fort Allen Camp Santiago
US Army Corps of EngineersHuntsville Center
Installation
Contracting Agency
Johnson Controls, Inc. Building Efficiency
Energy Services Company
Scope of Work Lighting Upgrades HVAC Upgrades Building Envelope Upgrades Solar Thermal Installation Water Treatment Repairs Water Treatment Automation Solar PV Installation Energy Storage System
1MW / 510kWh System
Energy Exchange: Federal Sustainability for the Next Decade12
Recent Installations
Manufacturing facility
1MW / 510kWh System Design System Assembled City Approval Performance Tested Installed Operating Sept 2015
Military training facility
1MW / 510kWh System Design System Assembled System Shipped Installed System Commissioned Operating Aug 2015
Commercial Space
125kW / 86kWh System Design System Assembled System Tested Installed PJM Tested Operating June 2015
Office Building
35kW / 40kWh System Design System Assembled Functionally Tested Installed in BTC Commissioned System Tested
Energy Exchange: Federal Sustainability for the Next Decade13
www.johnsoncontrols.com