PPT Work Sample Collection -Cat Rockholt

12
PPT Work Sample – Cat Rockholt A collection of various slides from different Power Point presentations, workshops, etc.

Transcript of PPT Work Sample Collection -Cat Rockholt

Page 1: PPT Work Sample Collection -Cat Rockholt

PPT Work Sample – Cat RockholtA collection of various slides from different Power Point presentations, workshops, etc.

Page 2: PPT Work Sample Collection -Cat Rockholt

Welcome TCC Summer Youth Program Staff Training

Page 3: PPT Work Sample Collection -Cat Rockholt

• Avg CFK Class – 70%• Avg Camp Ran – 65% • Avg # CFK – 7• Avg # Camp – 10• Avg Profit / CFK -

$153.51• Avg Profit / Camp -

$582.00• Total Supply Expense -

$(1493)• Total 2014 Profit – Approx. $16K

2014 Key StatsBased from Enrollment weekly reports prepared & summarized during 2014 summer program

Page 4: PPT Work Sample Collection -Cat Rockholt

2015 Financial Forecasts

Page 5: PPT Work Sample Collection -Cat Rockholt

Resume Writing/ Interviewing

Oklahoma State Fall Leadership Conference

Page 6: PPT Work Sample Collection -Cat Rockholt

• To get an interview• To highlight skills & experience

What is the Purpose?

Page 7: PPT Work Sample Collection -Cat Rockholt

7

Other Information

Professional

organizations

Community

involvement

Visa status

Page 8: PPT Work Sample Collection -Cat Rockholt

{Career Fairs

Use Resources

Make a Plan

Do your Homework

Get Business Cards1st contact Thank you – timelyInterview Thank you – 24 hours

Page 9: PPT Work Sample Collection -Cat Rockholt

Cat Rockholt 2015 Undergrad Honors

Thesis Presentation

Optimizing Sustainability at OSU Tulsa

Page 10: PPT Work Sample Collection -Cat Rockholt

Tulsa Actual Monthly Savings – Jan 2014 -$33,769Feb 2014 - $27,187March 2014 -

$33,398Jan 2015 - $40,983Feb 2015 - $31,253March 2015 –

Pending**

2007 Energy Conservation Program

Approximately – Our Campus Contributing 10% Average of System Wide Savings Monthly

Page 11: PPT Work Sample Collection -Cat Rockholt

Finance Project Evaluation

RRR = 10% (Tulsa Contribution from Energy ProgramStart Up Cost for Bins - $30,617Monthly fee of $400 for Student Led MaintenceTime – 12 Month Period

NPV = $264,826.99IRR = 76%

Page 12: PPT Work Sample Collection -Cat Rockholt

Additional Info • Summer Youth Power Point (37 slides)Usage: In house staff training at current job – May – June 2015

• Resume Skills Workshop Power Point (23 slides)Usage: External audience – workshop during state wide student conference for Oklahoma Phi Beta Lambda

• Sustainability Power Point (52 slides)Usage: Present to Campus Provost, students, and guests to complete Honors thesis requirement