Ppt summer presentation on finishing Of Police Station Construction Site

32
PRESENTATION SUBMITTED BY:- ALOK MISHRA 0902900015 (CE-4th YEAR) KRISHNA INSTITUE OF ENGINEERING & TECHNOLOGY, GHAZIABAD

description

finishing Works at Police Station Khajuri Khas, Near Sonia Vihar, Delhi (SH: C/o Police Station Building, Electric sub Station & External Development Work i.e. Internal Electrical Installations)

Transcript of Ppt summer presentation on finishing Of Police Station Construction Site

Page 1: Ppt summer presentation on finishing Of Police Station Construction Site

PRESENTATION SUBMITTED BY:-

ALOK MISHRA

0902900015

(CE-4th YEAR)

KRISHNA INSTITUE OF ENGINEERING & TECHNOLOGY, GHAZIABAD

Page 2: Ppt summer presentation on finishing Of Police Station Construction Site

Presentation on Summer Training

held at Construction Site of Police Station Khajuri Khas

under Central Public Works

Department

Project Report

Page 3: Ppt summer presentation on finishing Of Police Station Construction Site

TOPICS

Introduction

Project Overview

Site Location

Formwork

Planning

Sequence of Structures

Finishing Works

Project Monitoring

Quality

Conclusion

Page 4: Ppt summer presentation on finishing Of Police Station Construction Site

INTRODUCTION About CPWD: The Central Public Works Department of India is a Central

Government owned authority that is in charge of public sector works in the country.

Central Public Works Department (CPWD) under Ministry of Urban Development is entrusted with construction and maintenance of buildings for most of the Central Government Departments, Public undertakings and autonomous bodies.

CPWD, Delhi is the premier agency of Govt. of India engaged in planning, designing, construction and maintenance of Government assets in the field of built environment and infrastructure development. Assets in built environment include Hospitals, Schools, Colleges, Technical Institutes, Police Buildings, Prisons, Courts etc.

Page 5: Ppt summer presentation on finishing Of Police Station Construction Site

OBJECTIVES

1) Sound Planning And Design

2) Engineered Construction

3) Effective Maintenance

4) Benchmarking the Standards

5) Capacity Building

6) Public Private Partnership

7) Manpower Planning

8) Transparency in Management

Page 6: Ppt summer presentation on finishing Of Police Station Construction Site

PROJECT OVERVIEW

Name Of Work:

Construction of Police Station Khajuri Khas, Near Sonia Vihar, Delhi (SH: C/o Police Station Building, Electric sub Station & External Development Work i.e. Internal Electrical Installations)

Page 7: Ppt summer presentation on finishing Of Police Station Construction Site

AGREEMENT NO. : 03/EE/CD-III/2011-12

NAME OF CONTRACTOR: M/S ROSHAN REAL ESTATES PVT LTD.

PLOT SIZE: 5984 Sqm. Area

ESTIMATED COST: Civil Work- Rs 6, 01, 47,287/-

Elec. Work- Rs 24, 75,332/- Rs 6, 26, 22,609/-

TENDERED COST: Civil Work- Rs 6, 57, 88,182/-

Elec. Work- Rs 28, 69,490/- Rs 6, 86, 57,672/-

DATE OF START: 04-08-2011

STIPULATED DATE OF COMPLETION: 02-08-2012

ACTUAL DATE OF Work is Under Progress

COMPLETION: (80% Work is Completed) TIME ALLOWED : 365 Days

Page 8: Ppt summer presentation on finishing Of Police Station Construction Site

SITE LOCATION Advantages Of this Site

Land

Store

Health Unit

Canteen

Connectivity Of the Yard

Ease Of transportation Facilities

Page 9: Ppt summer presentation on finishing Of Police Station Construction Site

FORMWORK SIGNIFICANCE OF FORMWORK:- 1) Formwork constitutes 30% of the cost and 60% of the time in concrete construction.

2) Quality of concrete finish and soundness of concrete depends very much on the formwork system

3) Desired shape of concrete is not possible if formwork not done properly.

4) Formwork should be properly designed, fabricated and erected to receive concrete.

5) Accidents happen because of the faulty formwork and scaffolding or staging

SAFETY IN USING FORMWORK:- 1) Components are light in weight for manual handling.

2) Loose or hanging components are minimal.

3) Appropriate use of tools.

4) Minimum operations are involved in each reuse.

Page 10: Ppt summer presentation on finishing Of Police Station Construction Site
Page 11: Ppt summer presentation on finishing Of Police Station Construction Site

PLANNING

Page 12: Ppt summer presentation on finishing Of Police Station Construction Site

Planning of a CPWD Project mainly includes:-

Pre-requisites for execution of work.

Deposit works

Preparation of estimates.

Execution of original work.

Expenditure on survey, exhibition.

Register of buildings.

Green building norms.

Preparation and accounting of Standard Measurement book.

Preparation and passing bills for payment.

Documentation of accounts.

General departmental charges.

Contracts and forms.

Preparation of tender documents.

Publicity of tenders

Sale of documents

Earnest money.

Issue of material to contractors.

Issue of tool and plant.

Payment to contractors

Insurance

Losses or damages.

Budgeting

Quality assurance and technical audit wing.

Inspection and Audit by Chief Controller.

Public accounts committee.

Page 13: Ppt summer presentation on finishing Of Police Station Construction Site

SEQUENCE OF STRUCTURE WORK

Site clearance

Demarcation of site

Positioning of central coordinate i.e. (0,0,0) as per grid plan

Surveying and layout

Excavation

Bar binding and placement of foundation steel

Shuttering and scaffolding

Concreting

Electrical and plumbing

Page 14: Ppt summer presentation on finishing Of Police Station Construction Site

Construction Process And Material Used

CONCRETE

1) Normal Concrete made of Fine Aggregate +

Regular Aggregate + Water

2) Concrete will set up hard enough in normal weather in about 3 hours

3) It takes 28 days for it to reach its fullest strength

Page 15: Ppt summer presentation on finishing Of Police Station Construction Site

Plastering

Make sure to wet the surface at which you are applying plaster. This will ensure better sticking of the plaster.

Don’t use dry cement over the plastic surface, as there chances of it getting distorted.

Use the appropriate amount of water while mixing chemicals or else, there are chances that it won’t set up to the brick wall.

Wait for 24 hours after plastering the wall and splatter water over it for the next 3-4 days. The splattered water will ensure better set up of the plaster.

If you are doing the patch up work in a smaller area, like in a room, make sure to keep newspaper pieces on the ground, so that if the plaster falls over it, it can be removed. Once dried, it is difficult to remove the plaster.

Page 16: Ppt summer presentation on finishing Of Police Station Construction Site

FINISHING WORKS Painting

Pre-painting work

Surface preparation

Painting

Page 17: Ppt summer presentation on finishing Of Police Station Construction Site

Pre-Painting Works

Page 18: Ppt summer presentation on finishing Of Police Station Construction Site

Patching

Sanding

Cleaning

Priming

Page 19: Ppt summer presentation on finishing Of Police Station Construction Site

Surface Preparation

Page 20: Ppt summer presentation on finishing Of Police Station Construction Site

Allow newly plastered surface to mature for a period of at least 6 months before painting.

Rectify existing surface problems such as dampness, cracks etc. before

actual painting process. Check for hand prints, greasy fingerprints, algae as well as dirt and stained

marks. Use a scraper, putty knife or scrub brush to remove any dirt, grease, rust, or

flaking. Fill in the holes, cracks and joints with plaster. Clean and dry the surface. Make sure the area to be painted is well ventilated as well as free of dust. As far as possible, don’t paint under much humid conditions.

Page 21: Ppt summer presentation on finishing Of Police Station Construction Site

Painting

Page 22: Ppt summer presentation on finishing Of Police Station Construction Site

Objects to be Painted

Interior walls

Exterior Walls

Metal Surfaces

Wooden Surfaces

Page 23: Ppt summer presentation on finishing Of Police Station Construction Site

INTERIOR WALLS

Apply a coat of Wall Primer (water thinnable) on new surfaces. Fill and level the minor undulations of wall by applying putty. In case of major

undulations on the wall surface, POP (Plaster of Paris) work needs to be carried out. Ensure that the surface is uniformly smooth by sanding after POP or putty work.

One liberal coat of Wall Primer (solvent thinned or water thinned) is

recommended on puttied areas before the application of top coat. The primer should be allowed to dry for 10 - 12 hours. If the primer coat is not applied over the puttied areas, there can be a patchy appearance of the top coat.

Avoid application of putty or filling compound while painting exterior surfaces.

Fill up cracks with a 1:3 (by volume) cement and sand mixture. All external drainage pipes must be checked for rusting or leakage. Any faulty

plumbing must be rectified Special attention must be given to the roof. Check for cracks near the edges and

close to the water reservoirs. Proper masonry or waterproofing work on the ceiling will enhance the performance of the paint.

Page 24: Ppt summer presentation on finishing Of Police Station Construction Site

Exterior Walls Pre-painting

For exterior surfaces it is very important to undertake repairs of any wall imperfections before commencing painting.. Avoid applying putty or filling compound while painting exterior surfaces. Fill up cracks with a 1:3 cement and sand mixture.

All external drainage pipes must be checked for rusting or leakage. Any faulty plumbing must be rectified.

Special attention must be given to the roof. Check for cracks near the edges and close to the water reservoirs. Proper masonry or waterproofing work on the ceiling will enhance the performance of the painted surfaces.

Page 25: Ppt summer presentation on finishing Of Police Station Construction Site

Exterior Wall Painting Apply a liberal coat of Asian Paints Exterior Wall Primer using

recommended method.

Apply two coats of top coat paint at recommended dilution. You can use Apex Weather Proof Exterior Emulsion or Apex Textured Exterior Emulsion or Ace Exterior Emulsion as top coat.

A gap of 4 to 6 hours must be given between two coats.

It is recommended that horizontal surfaces like the tops of awnings and Parapets must be given an additional coat for greater protection.

Page 26: Ppt summer presentation on finishing Of Police Station Construction Site

Metal Surfaces

Surface should be free from dirt, dust, grease, rust, moisture etc. The

area which is not to be painted must be covered by a masking tape, paper and/or cloth.

For best results, allow the primer coat to dry for 6 hours and dry sand with emery paper no. 320 before application of subsequent coat.

Allow the surface to dry overnight after application of primer as above.

Apply top coat using the recommended thinner. For best results, apply two coats allowing 8 hours of drying time between two coats.

The first coat should be wet sanded with waterproof emery paper grade 400 before applying the second coat.

Page 27: Ppt summer presentation on finishing Of Police Station Construction Site

Wooden Surfaces

Surface Preparation:

Previously painted wooden surfaces must be properly sanded to

remove any dust or grease.

Apply wood primer by brush, after thinning to given ratio by recommended thinner.

Allow it to dry for 6-8 hrs then apply putty.

Sand the applied putty with number 180 sand paper and then apply second coat of wood primer.

Now the wooden surface is ready for painting with the top coat

Page 28: Ppt summer presentation on finishing Of Police Station Construction Site
Page 29: Ppt summer presentation on finishing Of Police Station Construction Site

Painting For opaque finish you can choose conventional enamels Apply wood

primer by brush, after thinning to given ratio by recommended thinner. Sand the applied putty with 180 no. sand paper & apply 2nd coat of

wood primer. Now the wooden surface is ready for painting with the top coat Enamels are normally applied by brushing although they can also be

sprayed. The drying time of enamels is longer; hence care must be taken to

ensure a dust free environment while the paint film is drying. Two coats of paint is sufficient in most cases, however if the earlier

paint shade was significantly darker than the new shade an additional coat of paint is recommended

Page 30: Ppt summer presentation on finishing Of Police Station Construction Site

PROJECT MONITORING

PROJECT MONITORING SYSTEM

The following three reports are made for the tracking-

Monthly progress report

Job cost report

Project performance report.

Page 31: Ppt summer presentation on finishing Of Police Station Construction Site

Quality Quality Control System of CPWD Field Level

Circle Level

Core Wing at Directorate Level

Quality Assurance Units In The Region Contract & Manual

Standards and Specifications

Quality Assurance

Techno-Legal matters

Technology Application & Standards Unit.

Page 32: Ppt summer presentation on finishing Of Police Station Construction Site

CONCLUSION It was a wonderful learning experience at CPWD office, IP

Bhawan, New Delhi 110002 for Six Weeks.

I gained a lot of insight regarding FINISHING aspects of Construction site.

I was given exposure in almost all the departments at the site, but I had liked to highlight the areas of safety, quality management, material management and execution.

I hope this experience will surely help me in my future and also in shaping my career.